The Weaver Viaduct, in the north of
Cheshire Cheshire ( ) is a Ceremonial counties of England, ceremonial county in North West England. It is bordered by Merseyside to the north-west, Greater Manchester to the north-east, Derbyshire to the east, Staffordshire to the south-east, and Shrop ...
on the M56, is one of the longest concrete
viaducts A viaduct is a specific type of bridge that consists of a series of arches, piers or columns supporting a long elevated railway or road. Typically a viaduct connects two points of roughly equal elevation, allowing direct overpass across a wide v ...
on the British motorway network.


History

It was built as part of the first section of the M56 North Cheshire Motorway, also initially known as the Cheshire East-West Motorway, five miles from junctions 14 Hapsford Interchange to 12 at the A557. The contract was given in early March 1968, to be finished by September 1970, to the Christiani- Shand consortium (its headquarters were at Romney House, on
Marsham Street Marsham Street is a street in the City of Westminster in London, England. It is approximately one mile in length and runs south from Great Peter Street near Victoria Street, London, Victoria Street and Parliament Square. Description Marsham Str ...
in London) for £3,146,387.


Design

It was designed from 1964 to 1967. It was designed by Husband and Company Consulting Engineers of
Sheffield Sheffield is a city in South Yorkshire, England, situated south of Leeds and east of Manchester. The city is the administrative centre of the City of Sheffield. It is historically part of the West Riding of Yorkshire and some of its so ...
.


Construction

Work started on the viaduct on 1 April 1968. Work began on the eight-mile motorway in December 1968. The bridge crosses a flood plain. The foundations had 2,376
reinforced concrete Reinforced concrete, also called ferroconcrete or ferro-concrete, is a composite material in which concrete's relatively low tensile strength and ductility are compensated for by the inclusion of reinforcement having higher tensile strength or ...
piles. Thirty two 125-foot concrete 100-tonne beams were put into place in July 1970; the concrete beams were made by Matthews & Mumby of Windmill Lane, Denton, Greater Manchester. The project manager for Christiani-Shand was Mr A.K. Robertson. 31-year-old Harry Russon was killed instantly on the bridge construction on Wednesday 6 August 1969. The construction of the five-mile motorway was completed in December 1970. The five-mile motorway opened for traffic at 11am on Sunday 21 February 1971; the viaduct would open with hard shoulders; the Thelwall Viaduct on the M6 was not originally built with a hard shoulder. The section to Preston Brook at junction 11 opened on Thursday 23 September 1971.''Cheshire Observer'' Friday 19 February 1971, page 25


Structure

Due to its position, on the eastern edge of the exposed
Cheshire Plain The Cheshire Plain is a relatively flat expanse of lowland within the county of Cheshire in North West England but extending south into Shropshire. It extends from the Mersey Valley in the north to the Shropshire Hills in the south, bounded by t ...
, there can be high
crosswind A crosswind is any wind that has a perpendicular component to the line or direction of travel. This affects the aerodynamics of many forms of transport. Moving non- parallel to the wind direction creates a crosswind component on the object and t ...
s over the bridge, and the bridge may be closed as a result. Many high-sided vehicles have had accidents on the bridge. It has a 222 ft span over the River Weaver and a 125 ft span over the Weaver Navigation. There are 30 approach spans of 90 ft each.


References

{{reflist


External links


History
1970 establishments in England Bridges completed in 1970 Bridges in Cheshire Cheshire West and Chester Concrete bridges in England M56 motorway Motorway bridges in England