HOME

TheInfoList



OR:

Tarbela Dam (, ) is an earth-filled dam along the
Indus River The Indus ( ) is a transboundary river of Asia and a trans-Himalayan river of South and Central Asia. The river rises in mountain springs northeast of Mount Kailash in Western Tibet, flows northwest through the disputed region of Kashmir ...
in Pakistan's
Khyber Pakhtunkhwa Khyber Pakhtunkhwa (; ps, خېبر پښتونخوا; Urdu, Hindko: خیبر پختونخوا) commonly abbreviated as KP or KPK, is one of the four provinces of Pakistan. Located in the northwestern region of the country, Khyber Pakhtunkhw ...
province. Located mainly in the
Swabi district Swabi District ( ps, سوابۍ ولسوالۍ, ur, ) is a district in the Mardan Division of the Khyber Pakhtunkhwa province in Pakistan. It lies between the Indus and Kabul Rivers. Before becoming a district in 1988, it was a tehsil within t ...
of the province, The dam is about from the city of
Swabi Swabi ( ps, صوابۍ; ur, ) is a city in Khyber Pakhtunkhwa province of Pakistan,Islamabad Islamabad (; ur, , ) is the capital city of Pakistan. It is the country's ninth-most populous city, with a population of over 1.2 million people, and is federally administered by the Pakistani government as part of the Islamabad Capital ...
, and east of
Peshawar Peshawar (; ps, پېښور ; hnd, ; ; ur, ) is the sixth most populous city in Pakistan, with a population of over 2.3 million. It is situated in the north-west of the country, close to the International border with Afghanistan. It is ...
. It is the largest earth-filled dam in the world. The dam is high above the riverbed and its reservoir, Tarbela Lake, has a surface area of approximately . The Tarbela Dam is built on the Indus at Bara near the village of Tarbela. It is about 30km from the town of Attock. When the Indus leaves the Himalayans foothills and enters the Potwar pleateau, the water is stored in the reservoir of the dam. It is 143 meters high, has an area of 243 square km, storage capacity of 119 billion cubic meters of water and has nine gates to control the outflow of water. The dam was completed in 1976 and was designed to utilize water from the Indus River for
irrigation Irrigation (also referred to as watering) is the practice of applying controlled amounts of water to land to help grow crops, landscape plants, and lawns. Irrigation has been a key aspect of agriculture for over 5,000 years and has been devel ...
,
flood control Flood control methods are used to reduce or prevent the detrimental effects of flood waters."Flood Control", MSN Encarta, 2008 (see below: Further reading). Flood relief methods are used to reduce the effects of flood waters or high water lev ...
, and the generation of hydroelectric power by storing flows during the monsoon period and subsequently releasing stored water during the low flow period in winter. The installed capacity of the 4,888 MW Tarbela hydroelectric power stations will increase to 6,298 MW after completion of the planned fifth extension financed by
Asian Infrastructure Investment Bank The Asian Infrastructure Investment Bank (AIIB) is a multilateral development bank that aims to improve economic and social outcomes in Asia. The bank currently has 105 members, including 14 prospective members from around the world. The br ...
and the
World Bank The World Bank is an international financial institution that provides loans and grants to the governments of low- and middle-income countries for the purpose of pursuing capital projects. The World Bank is the collective name for the Inter ...
.


Project description

The dam is at a narrow spot in the Indus River valley, named after the town of Tarbela in the Haripur District of
Hazara Division Hazara Division is an administrative division of the Khyber Pakhtunkhwa province of Pakistan. It is located along the Indus River and comprises eight districts: Abbottabad, Mansehra, Haripur, Battagram, Upper Kohistan, Kolai-Palas, Lo ...
,
Pakistan Pakistan ( ur, ), officially the Islamic Republic of Pakistan ( ur, , label=none), is a country in South Asia. It is the world's fifth-most populous country, with a population of almost 243 million people, and has the world's second-la ...
. up Tarbela Lake was formed as a reservoir behind a dam The main dam wall, built of earth and rock fill, stretches from the island to river right, standing high. A pair of concrete auxiliary dams spans the river from the island to river left. The dam's two
spillway A spillway is a structure used to provide the controlled release of water downstream from a dam or levee, typically into the riverbed of the dammed river itself. In the United Kingdom, they may be known as overflow channels. Spillways ensure th ...
s are on the auxiliary dams rather than the main dam. The main spillway has a discharge capacity of and the auxiliary spillway, . Annually, over 70% of water discharged at Tarbela passes over the spillways and is not used for hydropower generation. Five large tunnels were constructed as part of the outlet works. Hydroelectricity is generated from turbines in tunnel 1 through 3, while tunnels 4 and 5 were designed for irrigation use. Both tunnels are to be converted to hydropower tunnels to increase Tarbela's electricity-generating capacity. These tunnels were originally used to divert the Indus River while the dam was being constructed. MA hydroelectric power plant on the right side of the main dam houses 14 generators fed with water from outlet tunnels 1, 2, and 3. There are four 175 MW generators on tunnel 1, six 175 MW generators on tunnel 2, and four 432 MW generators on tunnel 3, for a total generating capacity of 3,478 MW. Tarbela Reservoir is long, with a surface area of . The reservoir initially stored of water, with a live storage of , though this figure has been reduced over the subsequent 35 years of operation to due to silting. The maximum elevation of the reservoir is above MSL and the minimum operating elevation is above MSL. The catchment area upriver of the Tarbela Dam is spread over of land largely supplemented by snow and glacier melt from the southern slopes of the
Himalayas The Himalayas, or Himalaya (; ; ), is a mountain range in Asia, separating the plains of the Indian subcontinent from the Tibetan Plateau. The range has some of the planet's highest peaks, including the very highest, Mount Everest. Over list ...
. There are two main Indus River tributaries upstream of the Tarbela Dam. These are the
Shyok River The Shyok River is a tributary of the Indus River that flows through northern Ladakh and enters Gilgit–Baltistan, spanning some . The Shyok River originates at the Rimo Glacier, one of the tongues of Siachen Glacier. Its alignment is ver ...
, joining near Skardu, and the Siran River near Tarbela.


Background

Tarbela Dam was constructed as part of the
Indus Basin Project The Indus Basin Project is a water control project that resulted from a treaty, Indus Waters Treaty, signed between India and Pakistan in 1960 that guaranteed that Pakistan would receive water from the Indus River independent from upstream control ...
after signing of the 1960 Indus Waters Treaty between
India India, officially the Republic of India ( Hindi: ), is a country in South Asia. It is the seventh-largest country by area, the second-most populous country, and the most populous democracy in the world. Bounded by the Indian Ocean on the ...
and
Pakistan Pakistan ( ur, ), officially the Islamic Republic of Pakistan ( ur, , label=none), is a country in South Asia. It is the world's fifth-most populous country, with a population of almost 243 million people, and has the world's second-la ...
. The purpose was to compensate for the loss of water supplies of the eastern rivers (
Ravi Ravi may refer to: People * Ravi (name), including a list of people and characters with the name * Ravi (composer) (1926–2012), Indian music director * Ravi (Ivar Johansen) (born 1976), Norwegian musical artist * Ravi (music director) (1926� ...
, Sutlej and Beas) that were designated for exclusive use by
India India, officially the Republic of India ( Hindi: ), is a country in South Asia. It is the seventh-largest country by area, the second-most populous country, and the most populous democracy in the world. Bounded by the Indian Ocean on the ...
per terms of the treaty. By the mid-1970s, power generation capacity was added in three subsequent hydro-electrical project extensions which were completed in 1992, installing a total of 3,478 MW generating capacity.


Construction

Construction of Tarbela Dam was carried out in three stages to meet the diversion requirements of the river. Construction was undertaken by the Italian firm Salini Impregilo.


Stage 1

In the first stage, the Indus River was allowed to flow in its natural channel, while construction works commenced on the right bank where a 1500 feet (457 meters) long and 694.8 feet (212 meters) wide diversion channel was being excavated along with a 105 feet (32 meter) high buttress dam that was also being constructed. Stage 1 construction lasted approximately 2.5 years.


Stage 2

The main embankment dam and the upstream blanket were constructed across the main valley of the river Indus as part of the second stage of construction. During this time, water from the Indus river remained diverted through the diversion channel. By the end of construction works in stage 2, tunnels had been built for diversion purposes. Stage 2 construction took 3 years to complete.


Stage 3

Under the third stage of construction, works were carried out on the closure of diversion channel and construction of the dam in that portion while the river was made to flow through diversion tunnels. The remaining portion of upstream blanket and the main dam at higher levels was also completed as part of stage 3 works, which were concluded in 1976.


Re-settlement of people affected by Tarbela Dam

An area of about 260 square kilometers and about of land was acquired for construction. The large reservoir of the dam submerged 135 villages, which resulted in displacement of a population of about 96,000 people, many of whom were relocated to townships surrounding the Tarbela Reservoir or in adjacent higher valleys. For the land and built-up property acquired under the Land Acquisition Act of 1984, a cash compensation of Rs 469.65 million was paid to those affected. In the absence of a national policy, the resettlement concerns of the people displaced by the Tarbela Dam were addressed on an ad hoc basis. In 2011, many such people had still not been resettled or given land in compensation for their losses by the government of Pakistan, in accordance with its contractual obligations with the World Bank.


Lifespan

Because the source of the Indus River is glacial meltwater from the
Himalayas The Himalayas, or Himalaya (; ; ), is a mountain range in Asia, separating the plains of the Indian subcontinent from the Tibetan Plateau. The range has some of the planet's highest peaks, including the very highest, Mount Everest. Over list ...
, the river carries huge amounts of
sediment Sediment is a naturally occurring material that is broken down by processes of weathering and erosion, and is subsequently transported by the action of wind, water, or ice or by the force of gravity acting on the particles. For example, san ...
, with an annual suspended sediment load of 200 million tons. Live storage capacity of Tarbela reservoir had declined more than 33.5 per cent to 6.434 million acre feet (MAF) against its original capacity of 9.679 MAF because of sedimentation over the past 38 years. The useful life of the dam and reservoir was estimated to be approximately 50 years. However, sedimentation has been much lower than predicted, and it is now estimated that the useful lifespan of the dam will be 85 years, to about 2060. Pakistan plans to construct several large dams upstream of Tarbela, including the Diamer-Bhasha Dam. Upon completion of the Diamer-Bhasha dam, sediment loads into Tarbela will be decreased by 69%.


Project benefits

In addition to fulfilling the primary purpose of the dam, i.e., supplying water for irrigation, Tarbela Power Station has generated 341.139 billion kWh of hydro-electric energy since commissioning. A record annual generation of 16.463 billion kWh was recorded during 1998–99. Annual generation during 2007–08 was 14.959 billion kWh while the station shared peak load of 3702 MW during the year, which was 23.057% of total WAPDA system peak.


Tarbela-IV Extension Project

Tarbela dam extension-IV was planned in June, 2012, and PC-1 was developed for the project . US ambassador Richard Olson offered aid for construction of this project during his visit to Pakistan, in March, 2013. In September 2013, Pakistan's Water and Power Development Authority signed a Rs. 26.053 billion contract with Chinese firm Sinohydro and Germany's Voith Hydro for executing civil works on the 1,410 MW Tarbela-IV Extension Project. Construction commenced in February 2014, and was completed in February 2018. This project was constructed on Tunnel No. 4 of Tarbela Dam. It consists of three turbine-generator units, each with a capacity of 470 MW. The project is expected to provide an average of 3.84 billion units of electricity annually to the National Grid. It is intended to help supplement electricity supply during the high-demand summer months. Annual benefits of the project were estimated at about Rs. 30.7 billion. On an annual basis, over 70% of water passing through Tarbela is discharged over spillways, while only a portion of the remaining 30% is used for hydropower generation. The Water and Power Development Authority in Pakistan says the third and last unit at its 1,410-MW Tarbela 4th Extension Hydropower Project has been synchronized with the National Grid.With this extension, the installed capacity of the Tarbela Hydel Power Station has increased to 4,888 MW.


Financing

The project's cost was initially estimated to be $928 million, but the cost was revised downwards to $651 million. The
World Bank The World Bank is an international financial institution that provides loans and grants to the governments of low- and middle-income countries for the purpose of pursuing capital projects. The World Bank is the collective name for the Inter ...
had agreed to provide an $840 million loan for the project in June 2013. The loan had two components: The first is a $400 million International Development Association loan, which will be lent as a concessional loan at low interest rates. The second portion consists of a $440 million from the World Bank's International Bank for Reconstruction and Development. Pakistan's Water and Power Development Authority was to provide the remaining $74 million required for construction, before the project's cost was downwardly revised by $277 million. Interest costs for the loans are estimated to cost $83.5 million. Because of revised lower costs to $651 million from $928 million, the World Bank permitted Pakistani officials to expedite completion of the project by 8 months at a cost of an additional $51 million. Pakistani officials were also permitted to divert $126 million towards the Tarbela-V Extension Project.


Tarbela-V Extension Project

The Tarbela Dam was built with five original tunnels, with the first three dedicated to hydropower generation, and the remaining two slated for irrigation use. The fourth phase extension project uses the first of the two irrigation tunnels, while the fifth phase extension will use the second irrigation tunnel. Pakistan's Water and Power Development Authority sought expressions of interest for the Tarbela-V Extension Project in August 2014, and was given final consent for construction in September 2015. Construction is yet to begin in July 2021 but will require an estimated 3.5 years for completion. The project will require installation of three turbines with a capacity of 470 MW each in Tarbela's fifth tunnel which was previously dedicated to agricultural use. Upon completion, the total power generating capacity of Tarbela Dam will be increased to 6,298 MW. The hydro power project of tunnel 5 has two major components: power generation facilities and power evacuation facilities. The major works included under the project are modifications to tunnel 5 and building a new power house and its ancillaries to generate about 1,800GWh of power annually, a new 50 km of 500kV double-circuit transmission line from Tarbela to the Islamabad West Grid Station for power evacuation, and a new 500kV Islamabad West Grid Station.


Financing

In November 2015, the
World Bank The World Bank is an international financial institution that provides loans and grants to the governments of low- and middle-income countries for the purpose of pursuing capital projects. The World Bank is the collective name for the Inter ...
affirmed that it would finance at least $326 million of the project's estimated $796 million cost which includes $126 million of funding that was diverted from the $840 million fourth phase extension project after costs for that project were revised downwards. In September 2016, the World Bank approved an additional financing of $390 million for the fifth extension hydropower project of Tarbela dam that will support the scaling up of the power generation capacity by adding 1,410 megawatts to the existing tunnel 5. The project will be financed by the International Bank for Reconstruction and Development (IBRD), with a variable spread and 20-year maturity, including a six-year grace period. This will be the first World Bank-supported project in South Asia to be jointly financed with the Asian Infrastructure Investment Bank (AIIB) which will be providing $300m and the Government of Pakistan $133.5m. The total cost of the project is $823.5m.


See also

*
List of dams and reservoirs in Pakistan This page shows the Province-wise list of dams and reservoirs in Pakistan According to the International Commission on Large Dams73 dams and reservoirsin Pakistan are over in height. Tarbela Dam is the largest earth-filled dam in the world ...
* List of barrages and headworks in Pakistan *
List of power stations in Pakistan Pakistan has a total installed power generation capacity of 43,775 MW as on 30 June 2022. Which includes 26,683 MW thermal, 10,635 MW hydroelectric, 1,838 MW wind, 530 MW solar, 369 MW bagasse and 3,620 MW nuclear. Thermal In service Currentl ...
* Satpara Dam * Allai Khwar Hydropower Project *
Gomal Zam Dam Gomal Zam Dam ( ur, ) is a multi-purpose gravity dam in South Waziristan Tribal District of Khyber Pakhtunkhwa, Pakistan. The dam impounds the Gomal River, a tributary of the Indus River, at Khjori Kach, where the Gomal River passes through a na ...
* Katzarah Dam


External links


A trip to Tarbela Dam by Shaikh Muhammad Ali


Notes

{{Authority control Dams in Pakistan Swabi District Haripur District Hydroelectric power stations in Pakistan Geography of Khyber Pakhtunkhwa Dams completed in 1974 Dams on the Indus River Earth-filled dams Dams in Khyber Pakhtunkhwa