The Salvador LRT (), also known as Salvador and Metropolitan Region LRT or Suburban LRT, is a
Brazil Brazil, officially the Federative Republic of Brazil, is the largest country in South America. It is the world's List of countries and dependencies by area, fifth-largest country by area and the List of countries and dependencies by population ...
ian
urban rail transit Urban rail transit is a wide term for various types of local rail systems providing passenger service within and around urban or suburban areas. The set of urban rail systems can be roughly subdivided into the following categories, which som ...
system
public transport Public transport (also known as public transit, mass transit, or simply transit) are forms of transport available to the general public. It typically uses a fixed schedule, route and charges a fixed fare. There is no rigid definition of whic ...
, based on light rail transport (LRT) system, currently under construction in
Salvador Salvador, meaning "salvation" (or "saviour") in Catalan, Spanish, and Portuguese may refer to: * Salvador (name) Arts, entertainment, and media Music *Salvador (band), a Christian band that plays both English and Spanish music ** ''Salvador'' ( ...
and Simões Filho, municipalities in the Metropolitan Region of Salvador,
Bahia Bahia () is one of the 26 Federative units of Brazil, states of Brazil, located in the Northeast Region, Brazil, Northeast Region of the country. It is the fourth-largest Brazilian state by population (after São Paulo (state), São Paulo, Mina ...
. The system was conceived to replace and expand the old Suburban Train of Salvador, or "Suburban Train." Initially proposed in 2015 and bid in 2017 without participants, a public-private partnership was signed in 2019 with BYD under the consortium ''Skyrail Bahia'' for an elevated
monorail A monorail is a Rail transport, railway in which the track consists of a single rail or beam. Colloquially, the term "monorail" is often used to describe any form of elevated rail or people mover. More accurately, the term refers to the style ...
system of 36.4 kilometers, comprising three sections and 34 stops. The system is expected to be fully integrated with
Salvador Metro The Salvador Metro (Brazilian Portuguese: ''Metrô de Salvador'', commonly called ''Metrô or Sistema Metropolitano Salvador-Lauro de Freitas'') is a rapid transit system serving Salvador city, the state capital of Bahia and the fifth largest c ...
system, transforming Bahia capital city mass transport. Construction on the monorail "began" in February 2021 with an anticipated completion in 2027. The old train system was dismantled, but the contract with ''Skyrail Bahia'' was canceled in 2023 due to project delays and irregularities. Following the cancellation, a new tender for an LRT project was issued at the end of 2023, new contracts were signed, and construction resumed in 2024, with an anticipated completion date of 2027 or 2028.


History


Background and the former Suburban Train

Originating in the 1940s, the Suburban Train of Salvador saw occasional modernization investments by the federal government, but lack of funding for ongoing maintenance eventually left the transport system in poor condition. Beginning in the early 2000s, the federal government and Salvador’s city government discussed the modernization and transfer of its administration from CBTU to the city. Initiated in 2000 with the creation of the municipal public company Companhia de Transporte de Salvador (CTS), the process concluded in 2005 with a substantial upgrade to trains and stations. At the same time, a proposal to replace the old suburban train with light rail was raised.


The first LRT proposal

CTS began developing the LRT project, which was transferred to Bahia’s state government in 2013. Renamed Companhia de Transportes do Estado da Bahia (CTB), the project gained momentum. In 2015, an 18.5-kilometer line with 21 stops from Comércio to Paripe along Avenida São Luis was presented, projected to carry 150,000 passengers daily at a cost of R$ 1 billion. Lacking resources to implement the project, the Bahia government restructured it as a public-private partnership (PPP) and issued a bid in 2017, but there were no participants, and the project was shelved.


BYD Skyrail Monorail proposal

The Chinese company BYD later proposed converting the LRT project into an
ALWEG Alweg was a transportation company based in Germany known for pioneering straddle-beam monorails. History Alweg was founded by Sweden, Swedish industrial magnate Dr. Axel Wenner-Gren, Axel Lennart Wenner-Gren in January 1953 as Alweg-Forsch ...
-standard monorail, supported by a PPP with Bahia’s state government. A contract was signed in February 2019. Although BYD proposed an elevated monorail, Bahia’s government decided against conducting new studies (including EIA and
RIMA Rima, also known as Rima the Jungle Girl, is the fictional heroine of W. H. Hudson's 1904 novel '' Green Mansions: A Romance of the Tropical Forest''. In it, Rima, a primitive girl of the shrinking rain forest of South America, meets Abel, a pol ...
), signing the contract based on slightly different studies. The project was termed “light transport vehicle” (VLT) to bypass legal challenges. In April 2021, BYD announced its first SkyRail for Salvador. This autonomous, futuristic SkyRail would link Salvador’s central business district with Ilha de São João over 14.5 miles (23.26 km). The project was part of BYD's global initiative to offer sustainable transit solutions, such as its proposal for a monorail in
Los Angeles Los Angeles, often referred to by its initials L.A., is the List of municipalities in California, most populous city in the U.S. state of California, and the commercial, Financial District, Los Angeles, financial, and Culture of Los Angeles, ...
. The monorail, priced at $750 million and developed over five years, included 28 train units. However, significant difficulties arose: delays in licensing processes added 12 months, environmental permits raised costs by R$ 200 million, and rerouting required by the National Historic and Artistic Heritage Institute (IPHAN) increased costs by R$ 300 million. This, combined with new phases, escalated costs from R$ 1.5 billion to R$ 5.2 billion. In 2024, the Bahia State Audit Court (TCE-BA) deemed the previous LRT contract illegal and forwarded findings to the Bahia State Public Prosecutor's Office (MP-BA) and the Bahia State Legislative Assembly (ALBA). The government rescinded the contract with Skyrail in August 2023.


New bid and expanded LRT

Following the cancellation, a new bid for the Salvador LRT was issued in December 2023, with the project divided into three segments and an estimated cost of nearly R$ 4 billion, projected for completion in 2027. In March 2024, the Bahia State Court of Justice (TJ-BA) suspended the bid due to alleged irregularities.


LRT train agreement with Mato Grosso

On July 9, 2024, the states of Bahia and Mato Grosso finalized an agreement for the transfer of 40 trains (comprising 280 cars) from the unused Cuiabá LRT project in
Mato Grosso Mato Grosso ( – ) is one of the states of Brazil, the List of Brazilian states by area, third largest by area, located in the Central-West Region, Brazil, Central-West region. The state has 1.66% of the Brazilian population and is responsible ...
State. These trains, manufactured by CAF, will undergo technical restoration and operational adjustments at CAF’s facility in
Hortolândia Hortolândia is a Brazilian municipality in the interior of the state of São Paulo. It is part of the Metropolitan Region of Campinas and the List of microregions of São Paulo (state), Mesoregion and Microregion of Campinas. It is located northw ...
, São Paulo, to prepare them for the Salvador and Metropolitan Region LRT system. The process of shipping the refurbished trains to Salvador is expected to begin in the second half of 2025. This transfer of assets is part of a larger agreement between the two states to optimize public resources. The acquisition from Mato Grosso reportedly resulted in a cost-saving of R$ 846 million, representing a 15.6% reduction in the total budget of the Salvador LRT project.


System specifications

The Salvador Metropolitan LRT, also known as the Suburban LRT, is designed to replace the Suburban Train of Salvador, creating a modern 36.4-kilometer (km) system with 34 stations. This electric-powered, eco-friendly transit system is expected to serve around 100,000 daily passengers. The total investment across the three segments exceeds R$ 5 billion, marking a major public infrastructure effort aimed at enhancing urban mobility in the region.


Stations and lines

The project includes three main lines: * First Line: São João Island ⇔ Calçada — Covers 16.66 km with 18 stations. Starting from São João Island in Simões Filho and ending at Calçada in
Salvador Salvador, meaning "salvation" (or "saviour") in Catalan, Spanish, and Portuguese may refer to: * Salvador (name) Arts, entertainment, and media Music *Salvador (band), a Christian band that plays both English and Spanish music ** ''Salvador'' ( ...
, this line serves as a crucial link for suburban commuters. * Second Line: São Luiz ⇔ Águas Claras — Spanning 9.2 km, this line includes 8 stations, providing connections to areas like Hospital do Subúrbio and Valéria, and terminating at Águas Claras, where it integrates with the Salvador metro system. * Third Line: Águas Claras ⇔ Piatã — The third segment extends over 10.52 km with 9 stations, connecting key residential and commercial zones in Salvador, including a terminus near the beachfront at Piatã. In addition to the tracks, significant components including the overhead catenary system, substations, track-switching apparatus, and telecommunications infrastructure have been shipped to Bahia from
Mato Grosso Mato Grosso ( – ) is one of the states of Brazil, the List of Brazilian states by area, third largest by area, located in the Central-West Region, Brazil, Central-West region. The state has 1.66% of the Brazilian population and is responsible ...
and are scheduled for phased delivery through March 2025.


Economic and social impact

The Salvador LRT project is expected to play a transformative role in the region's urban mobility, providing a safe, fast, and comfortable alternative to existing transport methods and stimulating economic development. According to Ana Cláudia Nascimento, president of the Companhia de Transportes do Estado da Bahia (CTB), the LRT represents a historic urban development initiative. "The LRT will be more than just a transit system; it will mark a true urban transformation for Salvador and its Metropolitan Region, enhancing the quality of life for thousands of Bahia residents," she stated.


Future extensions

The Bahia government is conducting feasibility studies for further extensions to the Salvador LRT, including potential new lines to reach the Comércio area and Itapagipe Peninsula. This expansion aims to bring greater coverage and connectivity across Salvador’s urban and suburban areas, addressing future transit needs and fostering sustainable development.


See also

*
Rail transport in Brazil Rail transport in Brazil began in the 19th century and there were many different railway companies. The railways were nationalised, nationalized under RFFSA (Rede Ferroviária Federal, Sociedade Anônima) in 1957. Between 1999 and 2007, RFFSA ...
*
Salvador Metro The Salvador Metro (Brazilian Portuguese: ''Metrô de Salvador'', commonly called ''Metrô or Sistema Metropolitano Salvador-Lauro de Freitas'') is a rapid transit system serving Salvador city, the state capital of Bahia and the fifth largest c ...


References


External links


SkyRail Bahia – Salvador LRT Official Website

Bahia Department of Urban Development (SEDUR) Documentation

Project profile at Inter-American Development Bank
{{Authority control Monorails