The Shannon hydroelectric Scheme was a major development by the
Irish Free State
The Irish Free State (6 December 192229 December 1937), also known by its Irish-language, Irish name ( , ), was a State (polity), state established in December 1922 under the Anglo-Irish Treaty of December 1921. The treaty ended the three-ye ...
in the 1920s to harness the power of the
River Shannon
The River Shannon ( or archaic ') is the major river on the island of Ireland, and at in length, is the longest river in the British Isles. It drains the Shannon River Basin, which has an area of , – approximately one fifth of the area of I ...
. Its product, the Ardnacrusha power plant, is a
hydroelectric
Hydroelectricity, or hydroelectric power, is Electricity generation, electricity generated from hydropower (water power). Hydropower supplies 15% of the world's electricity, almost 4,210 TWh in 2023, which is more than all other Renewable energ ...
power station located near
Ardnacrusha
Ardnacrusha () is a village in County Clare, Ireland, located on the northern bank of the River Shannon. By road, it is north of Limerick. The name derives from the phrase ''Ard na Croise'' meaning "the height of the cross", due to a large cro ...
within
County Clare
County Clare () is a Counties of Ireland, county in the Provinces of Ireland, province of Munster in the Southern Region, Ireland, Southern part of Republic of Ireland, Ireland, bordered on the west by the Atlantic Ocean. Clare County Council ...
approximately from the Limerick border. It is
Ireland
Ireland (, ; ; Ulster Scots dialect, Ulster-Scots: ) is an island in the North Atlantic Ocean, in Northwestern Europe. Geopolitically, the island is divided between the Republic of Ireland (officially Names of the Irish state, named Irelan ...
's largest river hydroelectric scheme and is operated on a purpose built headrace connected to the River Shannon. The plant includes fish ladders so that returning fish, such as
salmon
Salmon (; : salmon) are any of several list of commercially important fish species, commercially important species of euryhaline ray-finned fish from the genera ''Salmo'' and ''Oncorhynchus'' of the family (biology), family Salmonidae, native ...
, can climb the river safely past the power station.
Completed within 7 years of
Irish independence in 1922 at a cost which was equivalent to one fifth of the Irish state's annual budget, the plant enabled an enormous surge in demand for electricity across the country and demonstrated the ability of the new government to develop during a difficult financial period. The plant was constructed by the German company
Siemens-Schuckert
Siemens-Schuckert (or Siemens-Schuckertwerke) was a German electrical engineering company headquartered in Berlin, Erlangen and Nuremberg that was incorporated into the Siemens AG in 1966.
Siemens Schuckert was founded in 1903 when Siemens & H ...
, although much of the design was done by Irish engineers and Ireland provided most of the labour force. The scheme involved changes to the flow of the whole river, multiple dams and bridges and the construction of a national power grid.
The generating plant at Ardnacrusha is composed of three vertical-shaft
Francis turbine
The Francis turbine is a type of water turbine. It is an inward-flow reaction turbine that combines radial and axial flow concepts. Francis turbines are the most common water turbine in use today, and can achieve over 95% efficiency.
The pro ...
generators (commissioned in 1929) and one vertical-shaft
Kaplan turbine
The Kaplan turbine is a propeller-type water turbine which has adjustable blades. It was developed in 1913 by Austrian professor Viktor Kaplan, who combined automatically adjusted propeller blades with automatically adjusted wicket gates to a ...
generator (commissioned in 1934) operating under an average head of 28.5 metres. The scheme originally was designed for six turbines, with four turbines fitted. The 85 MW of generating plant in Ardnacrusha was adequate to meet the electricity demand of the entire country in the early years. The full output equates to about 332,000 MWh generated on an annual basis. Ardnacrusha generates at 10.5 kilovolts (kV) but this is transformed to 38 kV for local distribution and to 110 kV for long distance transmission.
Background
The first plan to harness the Shannon's power between
Lough Derg and
Limerick
Limerick ( ; ) is a city in western Ireland, in County Limerick. It is in the Provinces of Ireland, province of Munster and is in the Mid-West Region, Ireland, Mid-West which comprises part of the Southern Region, Ireland, Southern Region. W ...
was published in 1844 by Sir
Robert Kane. Inspired by
Nikola Tesla
Nikola Tesla (;["Tesla"](_blank)
. ''Random House Webster's Unabridged Dictionary''. ; 10 July 1856 – 7 ...
's 1896 project at
Niagara Falls
Niagara Falls is a group of three waterfalls at the southern end of Niagara Gorge, spanning the Canada–United States border, border between the Provinces and territories of Canada, province of Ontario in Canada and the state of New York (s ...
, "Frazer's Scheme" proposed a head-race canal ending at Doonass, and was sanctioned by the (
1 Edw. 7. c. cxxxvi). This envisaged a seasonal scheme with a back-up steam turbine to generate electricity in the summer, but the overall cost was considered too great and the scheme was shelved. In 1902 S. F. Dick proposed a sharper fall at Doonass. The British Board of Trade appointed a committee in 1918 which approved proposals by Theodore Stevens and published a report in 1922. This envisaged altering upper lake levels to create extra storage of 10,000 million cubic feet, at a cost of £2.6m.

At the end of 1923, the engineer
Thomas McLaughlin approached the new
Irish Free State
The Irish Free State (6 December 192229 December 1937), also known by its Irish-language, Irish name ( , ), was a State (polity), state established in December 1922 under the Anglo-Irish Treaty of December 1921. The treaty ended the three-ye ...
's Minister for Industry and Commerce
Patrick McGilligan with a proposal for a much more ambitious project. McLaughlin had started working for
Siemens-Schuckert
Siemens-Schuckert (or Siemens-Schuckertwerke) was a German electrical engineering company headquartered in Berlin, Erlangen and Nuremberg that was incorporated into the Siemens AG in 1966.
Siemens Schuckert was founded in 1903 when Siemens & H ...
, a large German engineering firm, in late 1922, and his scheme would exploit the full height difference between Lough Allen and the sea. He drew on the analysis of 25 years of flow at the weir at Killaloe published by John Chaloner Smith, an engineer with the
Commissioners of Public Works. McGilligan was enthusiastic although the
President of the Executive Council,
W. T. Cosgrave, was more cautious. The scheme was published by Siemens in September 1924 and the government appointed a team of experts from Norway and Switzerland to check its viability. It caused considerable political controversy as the cost of £5.2m was a large part of the new state's entire budget in 1925 of £25m and interests in Dublin preferred a more localised solution. But the experts supported the centralised solution which would require a distribution grid all over the country but recommended a two-stage implementation of the power generators. The government accepted this and by April 1925 had introduced the Shannon Electricity Act, 1925 in the
Dáil.
Construction
In 1925 Siemens started the works with Dr. McLaughlin as managing director and Professor Frank Sharman Rishworth, who took a leave of absence from
University College Galway
The University of Galway () is a public university, public research university located in the city of Galway, Republic of Ireland, Ireland.
The university was founded in 1845 as "Queen's College, Galway". It was known as "University College, Ga ...
, as chief civil engineer. A completion time limit of three and a half years, with penalty clauses for failure of adherence to this limit, was written into the contract.
[The Engineers Journal, Engineers Ireland, Volume 58, November 2004] Around 150 of the skilled workers and engineers on the power station were Germans. A camp was set up for the workers that included living quarters for 750 men and a dining room that seated 600. Initially employment for 700 was provided, whilst at its peak there were 5,200 employed during the construction phase, with this dropping back to 2,500 near completion.
[
Siemens had to import a vast array of machinery from ]Bremen
Bremen (Low German also: ''Breem'' or ''Bräm''), officially the City Municipality of Bremen (, ), is the capital of the States of Germany, German state of the Bremen (state), Free Hanseatic City of Bremen (), a two-city-state consisting of the c ...
and Hamburg
Hamburg (, ; ), officially the Free and Hanseatic City of Hamburg,. is the List of cities in Germany by population, second-largest city in Germany after Berlin and List of cities in the European Union by population within city limits, 7th-lar ...
and built a 96 km narrow gauge railway to transport workers and supplies around the site, which included 76 steam locomotives. The government made good the local roads which were in an appalling state. The headrace involved building embankments up to 25m high over a distance of 10 km and many unforeseen geological problems were encountered. of soil had to be moved and of rock. Four major bridges were built and nine rivers diverted as well as numerous streams. Three large Parsons turbine
A steam turbine or steam turbine engine is a machine or heat engine that extracts thermal energy from pressurized steam and uses it to do mechanical work utilising a rotating output shaft. Its modern manifestation was invented by Sir Charles Pars ...
s were installed at the base of the dam which could generate 35MW, more than the entire public supply of the time. In addition a supply network of 110kV power lines was installed to Dublin, Cork and other centres.
The construction project was not without controversy. Unskilled labourers were only paid agricultural wages producing strikes, national and governmental debate over wages, conditions, and spending over-runs. Despite this, there was a final cost overrun for Siemens of £150,000.[
The site attracted a huge number of sightseers, transported by excursion trains from all parts of Ireland. By 1929 it reckoned that 250,000 spectators had been guided over the works.
]
Electrifying Ireland
In 1927, the Electricity Supply Board
The Electricity Supply Board (ESB; ) is a state owned (95%; the rest are owned by employees) electricity company based in Ireland with operations worldwide. While historically a monopoly, the ESB now operates as a commercial semi-state concer ...
(ESB) was established and took control of the scheme and electricity supply and generation generally. McLaughlin became the managing director.
The Shannon Scheme was officially opened at Parteen Weir on 22 July 1929. One of the largest engineering projects of its day, it served as a model for large-scale electrification projects worldwide. Operated by the ESB, it had an immediate impact on the social, economic and industrial development of Ireland. By 1935, it was producing 80 per cent of Ireland's electricity. It continues to supply this power in the 21st century although its contribution is only 2% as of 2017. At the time, it was the largest hydroelectric station in the world, though this was soon superseded by the Hoover Dam
The Hoover Dam is a concrete arch-gravity dam in the Black Canyon of the Colorado, Black Canyon of the Colorado River (U.S.), Colorado River, on the border between the U.S. states of Nevada and Arizona. Constructed between 1931 and 1936, d ...
, which commenced construction in 1930.
The London Financial Times
The ''Financial Times'' (''FT'') is a British daily newspaper printed in broadsheet and also published digitally that focuses on business and economic Current affairs (news format), current affairs. Based in London, the paper is owned by a Jap ...
was highly impressed with the result, commenting:
:''They have thrown on their shoulders the not easy task of breaking what is in reality an enormous inferiority complex and the Shannon Scheme is one - and probably the most vital - of their methods of doing it.''
Within three years the demand for electricity in Ireland had expanded so much that stage 2 was initiated. Instead of the planned three extra penstocks, only one was used but it used a new 30 MW Kaplan turbine
The Kaplan turbine is a propeller-type water turbine which has adjustable blades. It was developed in 1913 by Austrian professor Viktor Kaplan, who combined automatically adjusted propeller blades with automatically adjusted wicket gates to a ...
with seven blades which produces high efficiency on the relatively small head and therefore increased the capacity of the station to 75 MW by 1933. In 1937, the Poulaphouca Reservoir hydroelectric plant on the River Liffey
The River Liffey (Irish language, Irish: ''An Life'', historically ''An Ruirthe(a)ch'') is a river in eastern Ireland that ultimately flows through the centre of Dublin to its mouth within Dublin Bay. Its major Tributary, tributaries include t ...
in County Wicklow
County Wicklow ( ; ) is a Counties of Ireland, county in Republic of Ireland, Ireland. The last of the traditional 32 counties, having been formed as late as 1606 in Ireland, 1606, it is part of the Eastern and Midland Region and the Provinces ...
was constructed, adding another 35 MW.
In 2002, on the 75th anniversary of the plant, its historic status was recognised by the Institute of Electrical and Electronics Engineers
The Institute of Electrical and Electronics Engineers (IEEE) is an American 501(c)(3) public charity professional organization for electrical engineering, electronics engineering, and other related disciplines.
The IEEE has a corporate office ...
, in partnership with the American Society of Civil Engineers
The American Society of Civil Engineers (ASCE) is a tax-exempt professional body founded in 1852 to represent members of the civil engineering profession worldwide. Headquartered in Reston, Virginia, it is the oldest national engineering soci ...
, who marked the facility as an Engineering Milestone of the 20th century.
Ardnacrusha Power Station Construction - canal.jpg, Canal construction
Ardnacrusha Power Station Construction - tail race.jpg, Head-race canal
Ardnacrusha electricity transmission towers.png, types of transmission towers used. Most of them were manufactured in Germany and transported to ireland
Shannon-scheme power pylon for 1 circuit.png, Typical 38 kV transmission tower for one circuit
Shannon-scheme power pylon for 2 circuits.png, Typical 38 kV transmission tower for two circuits
Shannon Scheme power substation.png, Electrical substation from 1929 with original gantry tower in front
Environmental consequences
The opening of the scheme had, and continues to have, a significant environmental effect on the part of the Shannon bypassed by the head-race canal, from Parteen Villa north of O'Brien's Bridge to about a mile north of Limerick
Limerick ( ; ) is a city in western Ireland, in County Limerick. It is in the Provinces of Ireland, province of Munster and is in the Mid-West Region, Ireland, Mid-West which comprises part of the Southern Region, Ireland, Southern Region. W ...
city. This length of river, especially that running past Castleconnell and the Falls of Doonass was in the nineteenth and early twentieth centuries world-famous for fishing, particularly salmon
Salmon (; : salmon) are any of several list of commercially important fish species, commercially important species of euryhaline ray-finned fish from the genera ''Salmo'' and ''Oncorhynchus'' of the family (biology), family Salmonidae, native ...
fishing. The diverting of water to the power station had a disastrous effect on this, for two main reasons: Initially, there was no fish pass at Ardnacrusha to allow the salmon to migrate further up the river; this was later rectified. Secondly, the reduction in water flow down the natural channel encouraged more fish to either migrate towards the head-race canal, or to the Mulkear River
The River Mulcair, or Mulkear, rises in the Slieve Felim Mountains and Silvermine Mountains in Ireland, and flows through the east of County Limerick before joining the River Shannon near Annacotty. It flows through Counties Limerick and Tippe ...
instead. The problem continues to this day, and the salmon fishing is no longer comparable with the period up to the 1920s, with stocks reduced by about 90%. The conservation status of the critically other species of native fish have also been hurt by the low water levels, such as the critically endangered eel.[Are Ireland’s large hydroelectric schemes sustainable?](_blank)
, ecofact.ie
Effects on the bypassed river channel
Reduction in water flow
Once opened, the great majority of the Shannon's water was diverted via the head-race canal to the power station. The ESB are required by law to allow 10 cubic meters per second (10 m3/s) to flow down the natural channel. This is roughly what the natural flow would be during dry summer periods prior to the weir being built. All surplus water can be diverted for power generation. The maximum capacity of Ardnacrusha is approximately 400 m3/s, 40 times that which is required to flow down the natural channel (although the power station does not necessarily run at this capacity at all times). For the first few years after the opening of the scheme, water was diverted to the power station only as necessary for the electricity demand at the time, and thus the impact on the river was not initially severe. However, as demand increased, more and more water was diverted, until eventually a situation was reached where, at all times, all available water was diverted for power generation, and the natural channel was permanently reduced to the minimum water flow allowed (except during extreme conditions). In exceptionally wet periods, the flow of water out of Lough Derg is greater than 400 m3/s, and it is then necessary for the surplus to be released down the natural channel through Castleconnell. During these brief periods, the Falls of Doonass are temporarily restored to their former glory. How often this occurs depends on seasonal weather patterns: some years there is no increase above the minimum flow at all. This has led to a substantially dried-up riverbed. The most obvious result on the river south of Parteen Villa always being kept at summer levels is the silting of many of the old salmon pools, and the growth of trees and bushes in many parts of the former riverbed, thus significantly altering both the appearance and ecosystem of the river.
When built, Ardnacrusha had the capacity to supply power for the entire country. Currently, it accounts for around 2-3% of the ESB's overall power output.[ESB Power stations output](_blank)
, ESB Website Given the small overall amount of power produced per cubic meter, there is a substantial case for increasing water flow to the natural channel, now that Arnacrusha is producing so small a proportion of ESB's power. For example, increasing the flow of the river to 50 m3/s would reduce Ardnacrusha's capacity by 1/10 (flow reduced by 40 m3/s), or 8 megawatts; less than 0.3% of ESB's national capacity, whilst increasing the water flow to the natural channel 5-fold. This would have a major beneficial effect on the condition of the river south of O'Briens Bridge.
Navigation
The navigable section of water from the southern end of the Killaloe Canal to World's End, Castleconnell, was linked to Limerick via the lateral Plassey-Errina canal which had six locks. This became redundant with the construction of the new canal to Ardnacrusha, was dewatered and subsequently became derelict. Recently, several sections have been cleared, and it is now possible to walk from O'Briens Bridge to Errina lock along the old tow path.
As there is no lock at Parteen weir linking the natural channel to Lough Derg, it is no longer possible for any watercraft to enter, by water, this part of the Shannon.[The Shannon Navigation, Ruth Delany, 2007]
Navigation of the Shannon is now by the head-race canal which is wide. When all turbines are operating, the speed of the water is which can be challenging in both directions. This leads to the double lock at Ardnacrusha, which will take boats long and wide. The two locks have a combined drop of up to .
Shannon Eel Management Programme
A trap and transport scheme is in force on the Shannon as part of an eel
Eels are ray-finned fish belonging to the order Anguilliformes (), which consists of eight suborders, 20 families, 164 genera, and about 1000 species. Eels undergo considerable development from the early larval stage to the eventual adult stage ...
management programme following the discovery of a reduced eel population. This scheme ensures safe passage for young eels past Ardnacrusha.
Effects upriver from the scheme
Flooding
The maximum capacity of Ardnacrusha is approximately 400 m3/s. As this is much greater than is available during summer months, during the early years of operation water was stored in the major lakes on the Shannon, Lough Derg, Lough Ree and Lough Allen because Ardnacrusha provided a significant contribution to meeting the nation's electricity requirements during that period. By holding these lakes at a higher than natural level, by means of weirs, water accumulated during the wet winter months could be released during much drier periods to maintain supply to the power station. Weirs already existed at Killaloe and Athlone to control lake levels in Lough Derg and Lough Ree respectively. Upon completion of Ardnacrusha, the weir at Athlone was modified and brought under ESB control, and a new weir built at the mouth of Lough Allen to further regulate water levels (the weir at Killaloe was removed, as Lough Derg's water level is now controlled by Parteen weir itself). In more recent decades Ardnacrusha's significance for electricity production has decreased, and water is no longer stored on the Shannon lakes for electricity generation.
Navigation
The scheme simplified navigation between Killaloe and Limerick, as watercraft need to traverse just one double lock at Ardnacrusha. The majority of the Killaloe canal was submerged under the new lake (the 'flooded section') south of Killaloe, allowing direct access to the head-race canal. The ESB is responsible for maintaining water levels for navigation throughout the Shannon to between predetermined limits, but they have the right to prioritise levels for electricity generation, should water shortages arise.
See also
* River Shannon to Dublin pipeline
References
External links
Electricity Supply Board - background on establishment
{{Authority control
Buildings and structures in County Clare
Hydroelectric power stations in the Republic of Ireland
Historic Civil Engineering Landmarks
River Shannon