History
The TGV POS project was a unique extension of the TGV Duplex order. Alstom delivered to SNCF 38 new tri-current power cars and 19 sets of double-deck Duplex passenger carriages. The tri-current power cars were paired with the 19 sets of single-level passenger carriages from TGV Réseau trainsets, while the two-level Duplex passenger carriages were paired with the 38 dual-current power cars from the Réseau trainsets. The tri-current function was necessary for the LGV Est, which ends at the German border, where the electrification switches to the system. Meanwhile, the heavily congested lines where the Réseau trainsets were used needed the additional passenger capacity provided by the Duplex passenger carriages. The project allowed SNCF to receive the tri-current power cars needed ahead of the opening of the LGV Est, without slowing the production of the Duplex trainsets. The TGV POS power cars have a total power output of under , and under 15 kV 16.7 Hz AC, with a top speed of under either system. Each TGV POS trainset weighs and is numbered in the 4400 series. The livery is the same as that of TGV Réseau sets (silver and blue). From 2013 to 2019, all of the TGV POS trainsets were shifted from LGV Est to the TGV Lyria service (a joint-venture by SNCF and the Swiss Federal Railways) betweenGallery
World rail speed record
On 3 April 2007 a train using both power cars of the TGV POS trainset number 4402 set a new world speed record for travel on conventional rails. The Project V150 train reached . As part of a series of increasingly faster runs that culminated in the official record attempt, it set an unofficial speed record of on 13 February 2007. Between the TGV POS power cars were three specially modified Duplex cars. The cars closest to the locomotive were each fitted with two powered bogies, similar to the AGV prototype (four Alstom 12 LCS 3550 C traction motors), providing four more powered axles than the trainset used during the 1990 TGV world speed record, and had a theoretical maximum power output of . The train set ran with larger wheels, and the voltage of the overhead lines was increased to 31 kV from the standard 25 kV. The maximum speed was achieved near kilometer post 193 on the LGV Est betweenSee also
*References
{{High-speed rail Pos Passenger trains running at least at 300 km/h in commercial operations Electric multiple units with locomotive-like power cars 15 kV AC multiple units 25 kV AC multiple units Alstom multiple units