The reorder point (ROP), also reorder level (ROL) or "optimal re-order level", is the level of
inventory Inventory (British English) or stock (American English) is a quantity of the goods and materials that a business holds for the ultimate goal of resale, production or utilisation. Inventory management is a discipline primarily about specifying ...
which triggers an action to replenish that particular inventory. It is a minimum amount of an item which a firm holds in stock, such that, when stock falls to this amount, the item must be reordered. It is normally calculated as the forecast usage during the replenishment
lead time A lead time is the latency between the initiation and completion of a process. For example, the lead time between the placement of an order and delivery of new cars by a given manufacturer might be between 2 weeks and 6 months, depending on vari ...
plus safety stock. In the EOQ (Economic Order Quantity) model, it was assumed that there is no time lag between ordering and receipt of materials.


Continuous review system

The reorder point for replenishment of stock occurs when the level of inventory drops down to zero. In a model with instantaneous replenishment of stock the level of inventory jumps to the original level from zero level. In real life situations there is never a zero
lead time A lead time is the latency between the initiation and completion of a process. For example, the lead time between the placement of an order and delivery of new cars by a given manufacturer might be between 2 weeks and 6 months, depending on vari ...
: there is always a time lag from the date of placing an order for material to the date on which materials are received. As a result, the reorder point is always higher than zero, and if the firm places the order when the inventory reaches the reorder point, the new goods will arrive before the firm runs out of goods to sell. The decision on how much stock to hold is generally referred to as the order point problem, that is, how low should the inventory be depleted before it is reordered. The two factors that determine the appropriate order point are the delivery time stock, which is the inventory needed during the lead time (i.e., the difference between the order date and the receipt of the inventory ordered), and the
safety stock Safety stock is a term used by logistics, logisticians to describe a level of extra inventory, stock which is maintained to mitigate the risk of stockouts, which can be caused, for example, by shortfalls in raw material availability or uncertainty ...
, which is the minimum level of inventory that is held as a protection against shortages due to fluctuations in demand. Therefore:
Reorder Point = Normal consumption during lead-time + Safety Stock .
Several factors determine how much delivery time stock and safety stock should be held. In summary, the efficiency of a replenishment system affects how much delivery time is needed. Since the delivery time stock is the expected inventory usage between ordering and receiving inventory, efficient replenishment of inventory would reduce the need for delivery time stock. And the determination of level of safety stock involves a basic trade-off between the risk of
stockout A stockout, or out-of-stock (OOS) event is an event that causes inventory to be exhausted. While out-of-stocks can occur along the entire supply chain, the most visible kind are retail out-of-stocks in the fast-moving consumer goods industry (e.g. ...
, resulting in possible customer dissatisfaction and lost sales, and the increased costs associated with carrying additional inventory. Another method of calculating reorder level involves the calculation of usage rate per day, lead time which is the amount of time between placing an order and receiving the goods and the safety stock level expressed in terms of several days' sales.
Reorder level = Average daily usage rate × lead-time in days .
From the above formula it can be easily deduced that an order for replenishment of materials be made when the level of inventory is just adequate to meet the needs of production during lead-time.


Example

If the average daily usage rate of a material is 50 units and the lead-time is seven days, then:
Reorder level = Average daily usage rate × Lead time in days = 50 units per day × 7 days = 350 units.
When the inventory level reaches 350 units an order should be placed for material. By the time the inventory level reaches zero towards the end of the seventh day from placing the order materials will reach and there is no cause for concern. Reorder point = Average Lead Time*Average Demand + Service Level* Reorder point = S × L + J (S × R × L) where *S = Usage in units per day *L = Lead time in days *R = Average number of units per order *J = Stock out acceptance factor The stock-out acceptance factor, 'J', depends on the stock-out percentage rate specified and the
probability distribution In probability theory and statistics, a probability distribution is a Function (mathematics), function that gives the probabilities of occurrence of possible events for an Experiment (probability theory), experiment. It is a mathematical descri ...
of usage (which is assumed to follow a
Poisson distribution In probability theory and statistics, the Poisson distribution () is a discrete probability distribution that expresses the probability of a given number of events occurring in a fixed interval of time if these events occur with a known const ...
).


See also

* *


References


Resources


Reorder Point Software freeware
Used for simulations and studies. {{DEFAULTSORT:Reorder Point Inventory