Morena Dam
   HOME

TheInfoList



OR:

Morena Dam is a rockfill dam across Cottonwood Creek, a tributary of the
Tijuana River , name_etymology = , image = Presa Tij 1.jpg , image_size = , image_caption = Dam on the Tijuana River in Mexico. , map = Tijuana River Basin.svg , map_size = 250 , map_caption ...
, in southern
San Diego County San Diego County (), officially the County of San Diego, is a county in the southwestern corner of the U.S. state of California. As of the 2020 census, the population was 3,298,634, making it California's second-most populous county and the f ...
,
California California is a state in the Western United States, located along the Pacific Coast. With nearly 39.2million residents across a total area of approximately , it is the most populous U.S. state and the 3rd largest by area. It is also the m ...
in the
United States The United States of America (U.S.A. or USA), commonly known as the United States (U.S. or US) or America, is a country Continental United States, primarily located in North America. It consists of 50 U.S. state, states, a Washington, D.C., ...
. Originally completed in 1912 and raised several times afterward, the dam is one of the oldest components of the city of
San Diego San Diego ( , ; ) is a city on the Pacific Ocean coast of Southern California located immediately adjacent to the Mexico–United States border. With a 2020 population of 1,386,932, it is the eighth most populous city in the United States ...
's municipal water system, providing between of water per year. It is one of the few facilities in the San Diego water supply system that relies entirely on local runoff.


Dimensions

Morena Dam is located in the
Cleveland National Forest Cleveland National Forest encompasses 460,000 acres (), mostly of chaparral, with a few riparian areas. A warm dry mediterranean climate prevails over the forest. It is the southernmost U.S. National Forest of California. It is administered by ...
at the headwaters of Cottonwood Creek, about east of downtown San Diego. The dam is high from the riverbed and long, with a height of from the foundations. Altogether the dam contains of earth and rock fill. At its full height, the reservoir can hold of water, covering . The drainage area above the dam is and includes the tributary Morena Creek, for which the dam and reservoir are named. Water is released via a long tunnel, fed by an intake tower that can draw up to water from different elevations of the reservoir. The
spillway A spillway is a structure used to provide the controlled release of water downstream from a dam or levee, typically into the riverbed of the dammed river itself. In the United Kingdom, they may be known as overflow channels. Spillways ensure th ...
is located on the north side of the dam and has a crest long, topping out at above sea level. Flood flows through the spillway are controlled by steel flash gates high. The spillway has a capacity of approximately .


Usage

The Morena reservoir serves primarily for long-term storage of winter flood flows in Cottonwood Creek, and is the uppermost of a chain of three reservoirs – Lower Otay, Barrett and Morena – that provide water to the city of San Diego. Water released from Morena Dam travels several miles down Cottonwood Creek to Barrett Lake, where it is diverted to Lower Otay via the long Dulzura Conduit. From Lower Otay Reservoir the water enters the Otay Water Treatment Plant, before flowing into the municipal water network. The entire project is known as the Cottonwood-Otay Water System. Originally providing the city's main water supply, it was relegated to a secondary role after the city began importing water from the
Colorado River The Colorado River ( es, Río Colorado) is one of the principal rivers (along with the Rio Grande) in the Southwestern United States and northern Mexico. The river drains an expansive, arid watershed that encompasses parts of seven U.S. s ...
in 1939. The reservoir now provides a backup water supply that is drawn down during dry years, when stored local water provides a much cheaper alternative than imported water – costing $240 per acre-foot whereas Colorado River water typically costs about $800 per acre-foot. On average, Morena provides only about 3 percent of the city's total supply. As Morena Reservoir has a larger surface area and thus greater evaporative losses than Barrett Lake, the city generally prioritizes storage in Barrett. Water is moved downstream from Morena as often as possible, if storage space is available in the lower reservoir. In addition, the watershed above Morena generally does not produce enough runoff to fill the reservoir, except in very wet years. Inflows average per year, or barely a fifth of the storage capacity. As a result, Morena only reaches spillway level about once per decade.


History

The dam was first proposed in the 1880s by the Southern California Mountain Water Company, which envisioned a system of reservoirs and connecting pipelines to transport water from the Tijuana and Otay river basins to San Diego. A
bond issue In finance, a bond is a type of security under which the issuer (debtor) owes the holder ( creditor) a debt, and is obliged – depending on the terms – to repay the principal (i.e. amount borrowed) of the bond at the maturity date as well as ...
was approved in 1896 for construction of the Morena Dam, which would form the highest and most remote of the reservoirs. Construction began in fall 1896, directed by San Diego city engineer Edwin Capps. The initial construction was fraught with problems caused by leakage and poor engineering, and work stopped in April 1898. It was not until May 1909 when construction resumed, under engineer
Michael O'Shaughnessy Michael Maurice O'Shaughnessy (28 May 1864 – 12 October 1934) was an Irish civil engineer who became city engineer for the city of San Francisco during the early twentieth century and developed both the San Francisco Municipal Railway (Muni) a ...
. The job was finally finished in 1912, at a cost of about $1.5 million. The city of San Diego purchased the dam from Mountain Water Company in 1914. Since then it has been raised several times to increase its capacity – in 1917, in 1923, in 1930 and in 1946. The spillway was rebuilt and widened in 1946 to increase its safety margin in floods. Because the dam was built in a high mountain area with some of the highest annual rainfall in San Diego County, it was anticipated that its reservoir would fill every year. However, the early 1900s saw continuous drought conditions in Southern California, and the reservoir did not fill to more than a third of its capacity in the first few years of operations. It was not until 1916 (see below) when Morena reached capacity for the first time.


The "Rainmaker"

In 1916 the city of San Diego hired Charles Hatfield, a man known as the "Rainmaker", who had offered to fill Morena Reservoir at a cost of $10,000. Although the city council doubted his ability, Hatfield was hired and set to work "rainmaking" on January 1. By January 10, flooding rains began to fall throughout San Diego County. Rising at a peak rate of two feet (0.6 m) per hour, Morena Reservoir filled and spilled on January 26, a mere from the top of the dam. In the rest of the county, flooding washed out bridges, inundated neighborhoods and killed over 50 people. The city subsequently deemed the rains an "act of God" and determined that if Hatfield were to collect the fee for filling Morena reservoir he would also have to pay for the damages caused by the rains. Hatfield never took the money.


References


External links


Daily water levels table
for Morena and other San Diego County lakes {{Tijuana River Watershed Dams in California Dams completed in 1912 Rock-filled dams United States local public utility dams 1912 establishments in California