A mobile launcher platform (MLP), also known as mobile launch platform, is a structure used to support a large multistage
space vehicle A space vehicle is the combination of a spacecraft and its launch vehicle which carries it into space. The earliest space vehicles were expendable launch systems, using a single or multistage rocket to carry a relatively small spacecraft in pr ...
which is assembled (stacked) vertically in an integration facility (e.g. the
Vehicle Assembly Building The Vehicle Assembly Building (originally the Vertical Assembly Building), or VAB, is a large building at NASA's Kennedy Space Center (KSC), designed to assemble large pre-manufactured space vehicle components, such as the massive Saturn V and t ...
) and then transported by a
crawler-transporter The crawler-transporters, formally known as the Missile Crawler Transporter Facilities, are a pair of tracked vehicles used to transport spacecraft from NASA's Vehicle Assembly Building (VAB) along the Crawlerway to Launch Complex 39. They we ...
(CT) to a
launch pad A launch pad is an above-ground facility from which a rocket-powered missile or space vehicle is vertically launched. The term ''launch pad'' can be used to describe just the central launch platform ( mobile launcher platform), or the entir ...
. This becomes the support structure for launch. Alternatives to this method include horizontal assembly and transport to the pad, as used by Russia; and assembling the vehicle vertically on the launch pad, as the United States used for smaller launch vehicles. The use of mobile launcher platform is a part of the Integrate-Transfer-Launch (ITL) system, which involves vertical assembly, transport, and launch of rockets. The concept was first implemented in the 1960s for the
United States Air Force The United States Air Force (USAF) is the air service branch of the United States Armed Forces, and is one of the eight uniformed services of the United States. Originally created on 1 August 1907, as a part of the United States Army Si ...
's Titan III rocket, and it was later used by
NASA The National Aeronautics and Space Administration (NASA ) is an independent agency of the US federal government responsible for the civil space program, aeronautics research, and space research. NASA was established in 1958, succeedin ...
for their
Saturn V Saturn V is a retired American super heavy-lift launch vehicle developed by NASA under the Apollo program for human exploration of the Moon. The rocket was human-rated, with multistage rocket, three stages, and powered with liquid-propellant r ...
rocket vehicle.


Kennedy Space Center

From 1967 to 2011, three platforms were used at the LC-39 to support NASA's launch vehicles. Formerly called Mobile Launchers (ML), the mobile launcher platforms were constructed for transporting and launching the
Saturn V Saturn V is a retired American super heavy-lift launch vehicle developed by NASA under the Apollo program for human exploration of the Moon. The rocket was human-rated, with multistage rocket, three stages, and powered with liquid-propellant r ...
rocket for the Apollo program lunar landing missions of the 1960s and 1970s. Each ML originally had a single exhaust vent for the Saturn V's engines. The Mobile Launchers also featured a Launch Umbilical Tower (LUT) with nine swing arms that permitted servicing of the vehicle on the launch pad, and swung away from it at launch. The Mobile Launchers were built by Ingalls Iron Works. The swing arms were constructed by Hayes International. After the Apollo program, the bases of the Mobile Launchers were modified for the
Space Shuttle The Space Shuttle is a retired, partially reusable low Earth orbital spacecraft system operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration (NASA) as part of the Space Shuttle program. Its official program n ...
. The Launch Umbilical Towers from ML-2 and ML-3 were removed. Portions of these tower structures were erected at the two launch pads, 39A and 39B. These permanent structures were known as the Fixed Service Structures (FSS). The LUT from ML-1 was taken apart and stored in the Kennedy Space Center's industrial area. Efforts to preserve the LUT in the 1990s failed due to a lack of funding, and it was scrapped. In addition to removal of the umbilical towers, each Shuttle-era MLP was extensively reconfigured with the addition of two Tail Service Masts (TSM), one on either side of the main engine exhaust vent. These masts contained the feed lines through which liquid hydrogen (LH2) and liquid oxygen (LOX) were loaded into the shuttle's external fuel tank, as well as electrical hookups and flares that were used to burn off any ambient hydrogen vapors at the launch site immediately prior to Main Engine start. The main engines vented their exhaust through the original opening used for the Saturn rocket exhaust. Two additional exhaust ports were added to vent exhaust from the
Space Shuttle Solid Rocket Booster The Space Shuttle Solid Rocket Booster (SRB) was the first solid-propellant rocket to be used for primary propulsion on a vehicle used for human spaceflight. A pair of these provided 85% of the Space Shuttle's thrust at liftoff and for the first ...
s (SRBs) that flanked the external fuel tank. The Space Shuttle assembly was held to the MLP at eight holddown points using large studs, four on the aft skirt of each Solid Rocket Booster. Immediately before SRB ignition,
frangible nut The frangible nut is a component used in many industries, but most commonly by NASA, to sever mechanical connections. It is, by definition, an explosively-splittable nut. The bolt remains intact while the nut itself is split into two or more p ...
s attached to the top of these studs were detonated, releasing the Shuttle assembly from the platform. Each MLP weighed unloaded and roughly with an unfueled Shuttle aboard, measured , and was high. They were carried by one of two
crawler-transporter The crawler-transporters, formally known as the Missile Crawler Transporter Facilities, are a pair of tracked vehicles used to transport spacecraft from NASA's Vehicle Assembly Building (VAB) along the Crawlerway to Launch Complex 39. They we ...
s (CT), which measure , and high. Each crawler weighs about unloaded, has a maximum speed of about loaded, and has a leveling system designed to keep the launch vehicle vertical while negotiating the 5 percent grade leading to the top of the launch pad. Two diesel engines power each crawler. The MLPs were designed as part of NASA's strategy for vertical assembly and transport of space vehicles. Vertical assembly allows the preparation of the spacecraft in a ready-for-launch position, and avoids the additional step of lifting or craning a horizontally-assembled vehicle onto the launchpad (as the engineers of the Soviet space program chose to do).


Mobile Launcher Platform-1

Construction of the Mobile Launcher Platform-1 (MLP-1) (formerly called the Mobile Launcher-3 or ML-3) began in 1964 and was completed with the installation of the Launch Umbilical Tower
hammerhead crane A crane is a type of machine, generally equipped with a hoist rope, wire ropes or chains, and sheaves, that can be used both to lift and lower materials and to move them horizontally. It is mainly used for lifting heavy objects and transporti ...
on 1 March 1965. The swing arms were added at a later date. The ML-3 was used for five crewed
Apollo Apollo, grc, Ἀπόλλωνος, Apóllōnos, label=genitive , ; , grc-dor, Ἀπέλλων, Apéllōn, ; grc, Ἀπείλων, Apeílōn, label=Arcadocypriot Greek, ; grc-aeo, Ἄπλουν, Áploun, la, Apollō, la, Apollinis, label= ...
launches;
Apollo 10 Apollo 10 (May 18–26, 1969) was a human spaceflight, the fourth crewed mission in the United States Apollo program, and the second (after Apollo8) to orbit the Moon. NASA described it as a "dress rehearsal" for the first Moon landing, and ...
,
Apollo 13 Apollo 13 (April 1117, 1970) was the seventh crewed mission in the Apollo space program and the third meant to land on the Moon. The craft was launched from Kennedy Space Center on April 11, 1970, but the lunar landing was aborted aft ...
,
Apollo 15 Apollo 15 (July 26August 7, 1971) was the ninth crewed mission in the United States' Apollo program and the fourth to land on the Moon. It was the first J mission, with a longer stay on the Moon and a greater focus on science than ear ...
,
Apollo 16 Apollo 16 (April 1627, 1972) was the tenth human spaceflight, crewed mission in the United States Apollo program, Apollo space program, administered by NASA, and the fifth and penultimate to Moon landing, land on the Moon. It was the second o ...
and
Apollo 17 Apollo 17 (December 7–19, 1972) was the final mission of NASA's Apollo program, the most recent time humans have set foot on the Moon or traveled beyond low Earth orbit. Commander Gene Cernan and Lunar Module Pilot Harrison Schmitt walke ...
. Following the launch of Apollo 17, the ML-3 was the first of the Mobile Launchers to be converted for use by the Space Shuttle. The Launch Umbilical Tower was dismantled and later partially reassembled on LC-39A as that pad's Fixed Service Structure (FSS) and the base of the launch platform was modified to accommodate the locations of engines on the Shuttle. The platform was redesignated MLP-1. In total, the MLP-1 was used for 52 Shuttle launches between 1981 and 2009. It was used for the first Space Shuttle launch, STS-1, in April 1981. Following the launch of
STS-119 STS-119 ( ISS assembly flight 15A) was a Space Shuttle mission to the International Space Station (ISS) which was flown by space shuttle Discovery during March 2009. It delivered and assembled the fourth starboard Integrated Truss Segment (S ...
in March 2009, it was transferred to the
Constellation program The Constellation program (abbreviated CxP) was a crewed spaceflight program developed by NASA, the space agency of the United States, from 2005 to 2009. The major goals of the program were "completion of the International Space Station" and a ...
. The platform was used only for the
Ares I-X Ares I-X was the first-stage prototype and design concept demonstrator of Ares I, a launch system for human spaceflight developed by the National Aeronautics and Space Administration (NASA). Ares I-X was successfully launched on October 28, ...
and the MLP-1 suffered substantial damage. The canceled Ares I-Y would have used the same MLP. However, the Constellation program was canceled and the MLP was left unused. Following the STS-135, usable parts from the MLP-1 were removed and stored in the Vehicle Assembly Building, with no plans to use the MLP again. In 2021, NASA began rolling out Mobile Launch Platform-1 on Crawler transporter-2 with a concrete ballast on the top to condition the crawlerway to handle the combined weight of the Space Launch System and Orion spacecraft in the future. NASA stated that re-conditioning of the crawlerway will be required periodically in the future, and MLP-1 will be retained for that purpose. MLP-1 will be stored in High Bay 1 of the Vehicle Assembly Building when not in use for crawlerway maintenance.


Mobile Launcher Platform-2

Mobile Launcher Platform-2 (MLP-2) (formerly called the Mobile Launcher-2 or ML-2) was used for the uncrewed Apollo 6 mission, followed by three crewed
Apollo Apollo, grc, Ἀπόλλωνος, Apóllōnos, label=genitive , ; , grc-dor, Ἀπέλλων, Apéllōn, ; grc, Ἀπείλων, Apeílōn, label=Arcadocypriot Greek, ; grc-aeo, Ἄπλουν, Áploun, la, Apollō, la, Apollinis, label= ...
launches;
Apollo 9 Apollo 9 (March 313, 1969) was the third human spaceflight in NASA's Apollo program. Flown in low Earth orbit, it was the second crewed Apollo mission that the United States launched via a Saturn V rocket, and was the first flight of the ful ...
,
Apollo 12 Apollo 12 (November 14–24, 1969) was the sixth crewed flight in the United States Apollo program and the second to land on the Moon. It was launched on November 14, 1969, by NASA from the Kennedy Space Center, Florida. Commander Charles ...
and
Apollo 14 Apollo 14 (January 31, 1971February 9, 1971) was the eighth crewed mission in the United States Apollo program, the third to land on the Moon, and the first to land in the lunar highlands. It was the last of the " H missions", landings at ...
. It was subsequently used for the launch of
Skylab Skylab was the first United States space station, launched by NASA, occupied for about 24 weeks between May 1973 and February 1974. It was operated by three separate three-astronaut crews: Skylab 2, Skylab 3, and Skylab 4. Major operations ...
on a Saturn V in 1973. Following the launch of Skylab, ML-2 was the second of the Mobile Launchers to be converted for use by the Space Shuttle. The Launch Umbilical Tower was dismantled and partially reassembled to become the LC-39B Fixed Service Structure (FSS), and the base of the launch platform was modified to accommodate the locations of engines on the Shuttle. The platform was redesignated MLP-2. In total, MLP-2 was used for 44 Shuttle launches, starting in 1983. All of the orbiters except made their maiden flights from MLP-2. It was also the launch site for the ill-fated
STS-51L STS-51-L was the 25th mission of the NASA Space Shuttle program and the final flight of Space Shuttle ''Challenger''. Planned as the first Teacher in Space Project flight in addition to observing Halley's Comet for six days and performing a ...
mission, when disintegrated shortly after launch, killing all seven crew members. Following the
Space Shuttle retirement The retirement of NASA's Space Shuttle fleet took place from March to July 2011. ''Discovery'' was the first of the three active Space Shuttles to be retired, completing its final mission on March 9, 2011; '' Endeavour'' did so on June 1. The ...
, NASA kept the MLP-2 for
liquid-propellant rocket A liquid-propellant rocket or liquid rocket utilizes a rocket engine that uses liquid propellants. Liquids are desirable because they have a reasonably high density and high specific impulse (''I''sp). This allows the volume of the propellant ta ...
s, but in January 2021, NASA announced that due to lack of storage space, the massive structure would be demolished.


Mobile Launcher Platform-3

The first launch from the Mobile Launcher Platform-3 (MLP-3) (formerly called the Mobile Launcher-1 or ML-1) was the maiden flight of the Saturn V, and the first launch from LC-39, Apollo 4. Following this, it was used for two crewed
Apollo Apollo, grc, Ἀπόλλωνος, Apóllōnos, label=genitive , ; , grc-dor, Ἀπέλλων, Apéllōn, ; grc, Ἀπείλων, Apeílōn, label=Arcadocypriot Greek, ; grc-aeo, Ἄπλουν, Áploun, la, Apollō, la, Apollinis, label= ...
launches:
Apollo 8 Apollo 8 (December 21–27, 1968) was the first crewed spacecraft to leave low Earth orbit and the first human spaceflight to reach the Moon. The crew orbited the Moon ten times without landing, and then departed safely back to Earth. The ...
and
Apollo 11 Apollo 11 (July 16–24, 1969) was the American spaceflight that first landed humans on the Moon. Commander Neil Armstrong and lunar module pilot Buzz Aldrin landed the Apollo Lunar Module ''Eagle'' on July 20, 1969, at 20:17 UTC, ...
. After NASA decided to move Saturn IB launches from
LC-34 Launch Complex 34 (LC-34) is a deactivated launch site on Cape Canaveral Space Force Station, Florida. LC-34 and its companion LC-37 to the north were used by NASA from 1961 through 1968 to launch Saturn I and IB rockets as part of the Apollo ...
to LC-39B, the ML-1 was modified by the addition of a structure known as the ''Milkstool'', which allowed the Saturn IB to use the same Launch Umbilical Tower as the much larger Saturn V. Three manned flights to
Skylab Skylab was the first United States space station, launched by NASA, occupied for about 24 weeks between May 1973 and February 1974. It was operated by three separate three-astronaut crews: Skylab 2, Skylab 3, and Skylab 4. Major operations ...
, and the Apollo launch for the Apollo-Soyuz Test Project, were conducted from the ML-1 using the ''Milkstool''. Prior to the scrapping of the LUT in 2004, there was a campaign to rebuild and preserve it as a memorial to Project Apollo. The crew access arm is preserved at the Kennedy Space Center Visitor Complex on the upper level of the gift shop. Following the launch of Apollo-Soyuz, ML-1 was the last Mobile Launcher to be converted for use by the Space Shuttle. The LUT and ''Milkstool'' were dismantled and placed into storage, and the base of the launch platform was modified to accommodate the locations of engines on the shuttle. The platform was redesignated MLP-3. In total, MLP-3 was used for 29 Shuttle launches, starting in 1990. It was the least used of the three MLPs. Following the
Space Shuttle retirement The retirement of NASA's Space Shuttle fleet took place from March to July 2011. ''Discovery'' was the first of the three active Space Shuttles to be retired, completing its final mission on March 9, 2011; '' Endeavour'' did so on June 1. The ...
, NASA kept the MLP-3 for
solid-propellant rocket A solid-propellant rocket or solid rocket is a rocket with a rocket engine that uses solid propellants ( fuel/oxidizer). The earliest rockets were solid-fuel rockets powered by gunpowder; they were used in warfare by the Arabs, Chinese, Pe ...
s. Usage of MLP-3 to launch the
OmegA Omega (; capital: Ω, lowercase: ω; Ancient Greek ὦ, later ὦ μέγα, Modern Greek ωμέγα) is the twenty-fourth and final letter in the Greek alphabet. In the Greek numeric system/ isopsephy ( gematria), it has a value of 800. The ...
rocket was granted to Orbital ATK (later bought out by
Northrop Grumman Northrop Grumman Corporation is an American multinational aerospace and defense technology company. With 90,000 employees and an annual revenue in excess of $30 billion, it is one of the world's largest weapons manufacturers and military tech ...
) following discussions in 2016, and later formalized through a Reimbursable Space Act Agreement in August 2019. Under the Agreement,
Vehicle Assembly Building The Vehicle Assembly Building (originally the Vertical Assembly Building), or VAB, is a large building at NASA's Kennedy Space Center (KSC), designed to assemble large pre-manufactured space vehicle components, such as the massive Saturn V and t ...
High Bay 2 would be used to assemble the rocket, while MLP-3 and
crawler-transporter The crawler-transporters, formally known as the Missile Crawler Transporter Facilities, are a pair of tracked vehicles used to transport spacecraft from NASA's Vehicle Assembly Building (VAB) along the Crawlerway to Launch Complex 39. They we ...
1 would be used to move the rocket to LC-39B for launch. From 2019 to 2020, the OmegA launch tower was under construction on MLP-3. Following the cancellation of OmegA in September 2020, work began to demolish the half-completed launch tower. As of January 2021, MLP-3 is planned to be placed in storage in High Bay 2 of the Vehicle Assembly Building.


Space Launch System

Between 2009 and 2010, a mobile launcher platform called the Mobile Launcher-1 (ML-1) was constructed as part of the
Constellation program The Constellation program (abbreviated CxP) was a crewed spaceflight program developed by NASA, the space agency of the United States, from 2005 to 2009. The major goals of the program were "completion of the International Space Station" and a ...
. Since the cancellation of the program in 2010, ML-1 was converted for the
Space Launch System The Space Launch System (SLS) is an American super heavy-lift expendable launch vehicle developed by NASA. As of 2022, SLS has the highest payload capacity of any rocket in operational service, as well as the greatest liftoff thrust of any ...
Block 1, with various phases of construction between 2013 and 2018. The total cost of the ML-1 is estimated to be $1 billion. The biggest modification to the ML-1 was on the platform's base, where engineers increased the size of a exhaust duct to a rectangle stretching and strengthened the surrounding structure. The SLS will weigh more than twice as much as the planned
Ares I Ares I was the crew launch vehicle that was being developed by NASA as part of the Constellation program. The name "Ares" refers to the Greek deity Ares, who is identified with the Roman god Mars. Ares I was originally known as the "Crew Launc ...
rocket. The Ares I rocket would have featured a single solid-fueled first stage, while the SLS will include two large solid rocket boosters and a powerful core with four RS-25 engines. The base of the ML-1 is high, long, and wide. The ML-1 also features a Launch Umbilical Tower (LUT) with several arms that will permit servicing of the SLS on the launch pad, and will swing away from it at launch. In June 2019, NASA awarded a contract for the design and construction of the Mobile Launcher-2 (ML-2) for SLS Block 1B. Construction of the ML-2 began in July 2020, with the planned completion in 2023. The total cost of the ML-2 is estimated to be $450 million.


Cape Canaveral


Atlas V

The
Atlas V Atlas V is an expendable launch system and the fifth major version in the Atlas launch vehicle family. It was originally designed by Lockheed Martin, now being operated by United Launch Alliance (ULA), a joint venture between Lockheed Mart ...
utilizes an MLP when launching from
SLC-41 Space Launch Complex 41 (SLC-41), previously Launch Complex 41 (LC-41), is an active launch site at Cape Canaveral Space Force Station. As of 2020, the site is used by United Launch Alliance (ULA) for Atlas V launches. Previously, it had been us ...
. The rocket is stacked on its MLP in the Vertical Integration Facility (VIF), and is then rolled-out over to the launch pad. The design of this MLP is derived from the MLPs used by the Titan III and IV rockets.


Titan III and Titan IV

Titan III and
Titan IV Titan IV was a family of heavy-lift space launch vehicles developed by Martin Marietta and operated by the United States Air Force from 1989 to 2005. Launches were conducted from Cape Canaveral Air Force Station, Florida and Vandenberg Air Forc ...
rockets launched from SLC-40 and
SLC-41 Space Launch Complex 41 (SLC-41), previously Launch Complex 41 (LC-41), is an active launch site at Cape Canaveral Space Force Station. As of 2020, the site is used by United Launch Alliance (ULA) for Atlas V launches. Previously, it had been us ...
utilized MLPs to decouple assembly of the launch vehicle from launch. This was meant to enable simultaneous assembly of multiple launch vehicles as part of the Titan's Integrate-Transfer-Launch (ITL) concept, allowing a high flight rate from a small number of launch pads.


Vulcan

United Launch Alliance United Launch Alliance (ULA), legally United Launch Alliance, LLC, is an American spacecraft launch service provider that manufactures and operates a number of rocket vehicles that are capable of launching spacecraft into orbits around Earth, a ...
's Vulcan will use an MLP similar in design to the one used by the Atlas V when launching from SLC-41, altered to support the former's larger design. The VLP (Vulcan Launch Platform) stands tall, and when complete will weigh . It will be equipped with various electronics, power-lines, and cables to support and control the rocket. For the initial Vulcan-Centaur configuration, the MLP will supply
liquefied natural gas Liquefied natural gas (LNG) is natural gas (predominantly methane, CH4, with some mixture of ethane, C2H6) that has been cooled down to liquid form for ease and safety of non-pressurized storage or transport. It takes up about 1/600th the vol ...
and liquid oxygen to the first stage, and liquid hydrogen and liquid oxygen to the Centaur upper stage. the basic structure has been completed, but the umbilicals and equipment have yet to be installed.


Other uses

Japanese
H-IIA H-IIA (H-2A) is an active expendable launch system operated by Mitsubishi Heavy Industries (MHI) for the Japan Aerospace Exploration Agency. These liquid fuel rockets have been used to launch satellites into geostationary orbit; lunar o ...
and
H-IIB H-IIB (H2B) was an expendable space launch system jointly developed by the Japanese government's space agency JAXA and Mitsubishi Heavy Industries. It was used to launch the H-II Transfer Vehicle (HTV, or ''Kōnotori'') cargo spacecraft for ...
rockets utilize an MLP when launching from the
Yoshinobu Launch Complex Yoshinobu Launch Complex (LC-Y) is a rocket launch site at the Tanegashima Space Center on Tanegashima. The site and its collection of facilities were originally built for the H-II launch vehicle and later used for H-IIA and H-IIB launches. I ...
. The
PSLV The Polar Satellite Launch Vehicle (PSLV) is an expendable medium-lift launch vehicle designed and operated by the Indian Space Research Organisation (ISRO). It was developed to allow India to launch its Indian Remote Sensing (IRS) satellites ...
, GSLV, and
GSLV Mark III The Launch Vehicle Mark-3 (LVM 3), previously referred to as the Geosynchronous Satellite Launch Vehicle Mark III (GSLV Mk3), is a three-stage medium-lift launch vehicle developed by the Indian Space Research Organisation (ISRO). Primarily desi ...
rockets utilize an MLP called the Mobile Launch Pedestal. The rockets are stacked on the Mobile Launch Pedestal in the Vehicle Assembly Building (VAB; not to be confused with the NASA building with the same name), and are then rolled-out towards the launch pad.


Sound suppression system

Once delivered to the pad, the mobile launcher platform is connected to the larger sound suppression system by large pipes which deliver a deluge of water from an adjacent water tower. Six towers known as "rainbirds" spray water over the MLP and into the flame deflector trenches below it, absorbing acoustic waves. The suppression system reduced the acoustic sound level to approximately 142 dB.