Lötschberg Line The Lötschberg is an Alpine mountain massif and usually associated with a major, historically important transit axis of the Alps in Switzerland with, at its core, the Lötschen Pass (german: Lötschenpass, Swiss German: ''Lötschepass''). The mou ...
, location = Traversing the
Bernese Alps , topo_map= Swiss Federal Office of Topography swisstopo , photo=BerneseAlps.jpg , photo_caption=The Eiger, Mönch, and Jungfrau , country= Switzerland , subdivision1_type= Cantons , subdivision1= , parent= Western Alps , borders_on= , ...
in
Switzerland ). Swiss law does not designate a ''capital'' as such, but the federal parliament and government are installed in Bern, while other federal institutions, such as the federal courts, are in other cities (Bellinzona, Lausanne, Luzern, Neuchâtel ...
, coordinates = – , system = BLS, SBB CFF FFS , status = , start =
Frutigen Frutigen is a municipality in the Bernese Oberland in the canton of Bern in Switzerland. It is the capital of the Frutigen-Niedersimmental administrative district. History The area around Frutigen may have been settled since possibly the Bro ...
,
canton of Bern The canton of Bern or Berne (german: Kanton Bern; rm, Chantun Berna; french: canton de Berne; it, Canton Berna) is one of the 26 cantons forming the Swiss Confederation. Its capital city, Bern, is also the ''de facto'' capital of Switzerland. ...
, , end =
Raron Raron (french: Rarogne) is a municipality in the district of Raron in the canton of Valais in Switzerland. History Raron is first mentioned around 1101–1200 as ''Rarogni''. In 1146 it was mentioned as ''Rarun''. A settlement on the Heidnis ...
,
canton of Valais Valais ( , , ; frp, Valês; german: Wallis ), more formally the Canton of Valais,; german: Kanton Wallis; in other official Swiss languages outside Valais: it, (Canton) Vallese ; rm, (Chantun) Vallais. is one of the cantons of Switzerland, 26 ...
, , stations = , startwork = 5 July 1999 , opened = 14 June 2007 , closed = , owner = BLS NETZ AG , operator = BLS , traffic = Railway , character = Passenger, Freight , length = , linelength = , tracklength = , notrack = One single-track tube for 20km, two single-track tubes for 14km , gauge = (
standard gauge A standard-gauge railway is a railway with a track gauge of . The standard gauge is also called Stephenson gauge (after George Stephenson), International gauge, UIC gauge, uniform gauge, normal gauge and European gauge in Europe, and SGR in E ...
) , el = 15 kV 16.7 Hz , speed = , hielevation = , lowelevation = (south portal) , height = , grade = 3–13 ‰ , map = The Lötschberg Base Tunnel (LBT) is a railway
base tunnel A base tunnel is a type of tunnel, mainly a railway tunnel, that is built through the base of a mountain pass. This type of tunnel typically connects two valleys at about the same altitudes. When originally constructed, classical railway lines ...
on the BLS AG's
Lötschberg line The Lötschberg is an Alpine mountain massif and usually associated with a major, historically important transit axis of the Alps in Switzerland with, at its core, the Lötschen Pass (german: Lötschenpass, Swiss German: ''Lötschepass''). The mou ...
cutting through the
Bernese Alps , topo_map= Swiss Federal Office of Topography swisstopo , photo=BerneseAlps.jpg , photo_caption=The Eiger, Mönch, and Jungfrau , country= Switzerland , subdivision1_type= Cantons , subdivision1= , parent= Western Alps , borders_on= , ...
of
Switzerland ). Swiss law does not designate a ''capital'' as such, but the federal parliament and government are installed in Bern, while other federal institutions, such as the federal courts, are in other cities (Bellinzona, Lausanne, Luzern, Neuchâtel ...
some below the existing
Lötschberg Tunnel , line = Lötschberg Line , location = Circumventing the Lötschen Pass in the Bernese Alps in Switzerland(Canton of Bern, canton of Valais) , coordinates = – , system = BLS, SBB CFF FFS , status = , st ...
. It runs between
Frutigen Frutigen is a municipality in the Bernese Oberland in the canton of Bern in Switzerland. It is the capital of the Frutigen-Niedersimmental administrative district. History The area around Frutigen may have been settled since possibly the Bro ...
,
Berne Bern () or Berne; in other Swiss languages, gsw, Bärn ; frp, Bèrna ; it, Berna ; rm, Berna is the ''de facto'' Capital city, capital of Switzerland, referred to as the "federal city" (in german: Bundesstadt, link=no, french: ville fédérale ...
, and
Raron Raron (french: Rarogne) is a municipality in the district of Raron in the canton of Valais in Switzerland. History Raron is first mentioned around 1101–1200 as ''Rarogni''. In 1146 it was mentioned as ''Rarun''. A settlement on the Heidnis ...
,
Valais Valais ( , , ; frp, Valês; german: Wallis ), more formally the Canton of Valais,; german: Kanton Wallis; in other official Swiss languages outside Valais: it, (Canton) Vallese ; rm, (Chantun) Vallais. is one of the 26 cantons forming the S ...
. The Lötschberg Base Tunnel was built as one of the two centrepieces of the
NRLA The New Railway Link through the Alps (NRLA; german: Neue Eisenbahn-Alpentransversale, NEAT, french: nouvelle ligne ferroviaire à travers les Alpes, NLFA, it, Nuova ferrovia transalpina, NFTA), is a Swiss construction project for faster north� ...
project (the New Railway Link through the Alps). Construction of the LBT commenced in 1999 and achieved breakthrough during 2005. A ceremony to mark its completion was held in June 2007; the first train operations began in December 2007. Within only a few years of opening, the LBT had become saturated because of a single-track section present; without the completion of the second bore, its overall capacity has been greatly reduced. During 2016, a planning contract was awarded for the completion of the second track of the LBT, which has been estimated to cost 1 billion Swiss francs. The resulting plan was presented in Spring 2019. A decision between a full or partial completion of the second tube of the Lötschberg Base Tunnel is expected in 2023.


Construction


Initial construction

The LBT was principally constructed to ease lorry traffic on the Swiss road network by providing faster routes for rail-based freight as an alternative. Reportedly, between the 1980s and 2000s, traffic on the north-south European axis (North Sea Ports to/from Northern Italy and along the Blue Banana) had increased more than tenfold, necessitating infrastructure investments to better cope with rising demands. Accordingly, the LBT allows a substantial number of trucks and trailers to be loaded onto trains in Germany, pass through Switzerland on rail and be unloaded in Italy (
rolling highway In rail transportation, a rolling highway or rolling road is a form of combined transport involving the conveying of road trucks by rail, referred to as Ro-La trains. The concept is a form of piggyback transportation. The technical challen ...
or trailer-on-flatcar respectively). It also cuts down travel time for German tourists going to Swiss ski resorts, and puts the
Valais Valais ( , , ; frp, Valês; german: Wallis ), more formally the Canton of Valais,; german: Kanton Wallis; in other official Swiss languages outside Valais: it, (Canton) Vallese ; rm, (Chantun) Vallais. is one of the 26 cantons forming the S ...
into commuting distance to
Bern german: Berner(in)french: Bernois(e) it, bernese , neighboring_municipalities = Bremgarten bei Bern, Frauenkappelen, Ittigen, Kirchlindach, Köniz, Mühleberg, Muri bei Bern, Neuenegg, Ostermundigen, Wohlen bei Bern, Zollikofen , website ...
by reducing travel time by 50%. The total cost was
SFr SFR (; ''Société française du radiotéléphone'', ) is a French telecommunications company. As of December 2015, it had 21.9 million customers in Metropolitan France for mobile services, and provided 6.35 million households with high-spee ...
4.3 billion (as of 2007, corrected to 1998 prices). This and the
Gotthard Base Tunnel , rm, Tunnel da basa dal Sogn Gottard , image = 20141120 gotthard-basistunnel02-wikipedia-hannes-ortlieb.jpg , image_size = 250 , caption = Turnout at Faido multifunction station , line = Gotthard Line , location = Switzerland ( Uri, Grisons and ...
are the two centerpieces of the Swiss
NRLA The New Railway Link through the Alps (NRLA; german: Neue Eisenbahn-Alpentransversale, NEAT, french: nouvelle ligne ferroviaire à travers les Alpes, NLFA, it, Nuova ferrovia transalpina, NFTA), is a Swiss construction project for faster north� ...
project. In 1994, early drilling was conducted in the area. During 1999, full-scale construction work on the LBT commenced. It was largely excavated using a combination of traditional techniques, including drilling and blasting. Roughly 80% of the tunnel was built using these conventional practices. The remaining 20% was excavated using
tunnel boring machine A tunnel boring machine (TBM), also known as a "mole", is a machine used to excavate tunnels with a circular cross section through a variety of soil and rock strata. They may also be used for microtunneling. They can be designed to bore thro ...
s (TBMs). The excavation work was conducted from both the north and south portals. During April 2005, the construction process reached a milestone when breakthrough was achieved; the event was attended by 1,000 guests. The excavation process reportedly used of explosives, while the material extracted would have filled a freight train that was in length. Work over the following year centered on the fitting-out process, installing all of the operational systems, including the track itself. In July 2006, track construction in the LBT was declared complete. Extensive testing then took place, including more than 1,000 test runs, which focused among other things on the use of the ETCS Level 2 system. Once satisfied that all systems had been validated, an official opening ceremony for the LBT was held during June 2007; at this event, the tunnel was recognised as the longest land tunnel anywhere in the world. The LBT overran its budget of roughly $2.7 billion by around $840 million, which has impacted its operation. On 9 December 2007, the LBT was declared operational. Initially, only regular freight services traversed the LBT, along with a minority of international and InterCity passenger trains (without stops between Spiez and Brig); passenger trains continued to operate on the old timetable (the travel time between Spiez and Brig was considered to be 56 minutes until December 2007, even if actual travel time through the LBT was only about 30 minutes). Since February 2008, the LBT has been routinely used for normal InterCity routes. Travel time between Visp and Spiez is about 28 minutes, of which 16 minutes is spent inside the LBT.


Additional phases

As a consequence of spiraling costs attributable to the overall NRLA project, it was decided to redirect funds from the Lötschberg tunnel to the
Gotthard Base Tunnel , rm, Tunnel da basa dal Sogn Gottard , image = 20141120 gotthard-basistunnel02-wikipedia-hannes-ortlieb.jpg , image_size = 250 , caption = Turnout at Faido multifunction station , line = Gotthard Line , location = Switzerland ( Uri, Grisons and ...
. This funding decision leaves the LBT in a partially-completed state for a protracted period. Once fully complete, the LBT will consist of two single track bores side by side from portal to portal, connected about every with cross cuts, enabling the other tunnel to be used for escape. Currently, from South to North, a third of the tunnel is
double track A double-track railway usually involves running one track in each direction, compared to a single-track railway where trains in both directions share the same track. Overview In the earliest days of railways in the United Kingdom, most li ...
, a third is single track with the second bore in place but not equipped, and a third is only a single track tunnel with the parallel exploration
adit An adit (from Latin ''aditus'', entrance) is an entrance to an underground mine which is horizontal or nearly horizontal, by which the mine can be entered, drained of water, ventilated, and minerals extracted at the lowest convenient level. Adit ...
providing the emergency egress. This unused western bore has been used by maintenance crews as a means of accessing the active eastern tunnel; an adjacent exploratory bore driven during the early 1990s has also proved useful for such purposes. The construction process was divided into three phases, of which only phase one has been completed to date: *''Phase one'': construction of about 75% of the length of the West tube and the complete East tube of the main tunnel, the Engstlige tunnel, the two bridges across the Rhône, and the branch bore from Steg. Tracks are laid in the Eastern tubes of the LBT and Engstlige tunnels, and for some in the western tube of LBT, starting from the South. *''Phase two'': laying of tracks in the bored but not equipped part of the western tube of LBT, and in the western tube of Engstlige tunnel. *''Phase three'': construction of the remaining of the western tube, laying tracks on the Steg branch, and connection of this branch to the main line Brig-Lausanne, but towards Lausanne. Phases two and three may be performed concurrently or separately. The cost of completing work on the LBT has been estimated to be around one billion
Swiss franc The Swiss franc is the currency and legal tender of Switzerland and Liechtenstein. It is also legal tender in the Italian exclave of Campione d'Italia which is surrounded by Swiss territory. The Swiss National Bank (SNB) issues banknotes and the ...
s. The project also includes two parallel bridges over the river Rhône in canton Valais, the Engstlige tunnel (built with
cut-and-cover A tunnel is an underground passageway, dug through surrounding soil, earth or rock, and enclosed except for the entrance and exit, commonly at each end. A pipeline is not a tunnel, though some recent tunnels have used immersed tube cons ...
method; the two tracks are separated by a wall). A planning contract for phases two and three was awarded in 2016 to the Swiss engineering consortium IG Valbt, headed by SRP Ingenieur. The resulting plan was presented for review in early 2019, and a decision between funding only Phase two or both Phase two and three is expected in 2023. The first option is naturally cheaper and is two years faster, but it provides a much lower capacity and needs an eight months closure of the line.


Operation

Its owner, BLS NETZ AG, presents the LBT as one of the safest, most modern and most technically complex rail tunnels in the world. The company has attributed the tunnel's congestion to the combination of the rapid growth of passenger and freight traffic with the presence of a single track section, which severely limits its overall capacity; it views the implementation of double-track running as being "absolutely essential". Operation of the LBT allegedly has an impact on the timetable reliability and flexibility across the entire Swiss rail network, as well as facilitating a reduction in production costs via the freight traffic it carries. The of single track, which lack
passing loop A passing loop (UK usage) or passing siding (North America) (also called a crossing loop, crossing place, refuge loop or, colloquially, a hole) is a place on a single line railway or tramway, often located at or near a station, where trains or ...
s, greatly complicates operations. Despite its relatively recent completion date, the LBT has already become a major bottleneck for rail freight traversing the Alps. Typically, trains using the LBT are scheduled together in batches that run in each direction separated by long intervals; trains more than seven minutes late are either routed via the old line or must wait for the next available timetable slot in their direction in the LBT, incurring long further delays in either case. By 2019, around 110 trains per day were using the LBT, while a further 66 have continued to use the old mountain tunnel largely due to the base tunnel's current capacity constraints. Of these 110, 30 were passenger services and 80 were hauling various types of freight, including
intermodal freight transport Intermodal freight transport involves the transportation of freight in an intermodal container or vehicle, using multiple modes of transportation (e.g., rail, ship, aircraft, and truck), without any handling of the freight itself when changing ...
and long-distance heavy freight trains. Heavy freight trains up to a maximum weight of and a maximum length of have to use the LBT, as they are above the maximum gauge of the pre-existing mountain track. By 2017, the LBT reportedly facilitated the movement of of rail freight. The LBT is operated and monitored from a dedicated control centre based at nearby Spiez. The tunnel incorporates various measures for handling emergency situations; for use in such circumstances, a pair of intermediate access tunnels connect with the main bores at a series of underground emergency stations. Trains can also be moved between the two bores via multiple cross-over links spread throughout its length. On 13 March 2020, the second bore of the LBT was temporarily closed to all traffic following the discovery of ingress by both water and sand while remedial work was performed to address this. In addition to cleaning the tunnel interior, removing the sand and excess water via
suction Suction is the colloquial term to describe the air pressure differential between areas. Removing air from a space results in a pressure differential. Suction pressure is therefore limited by external air pressure. Even a perfect vacuum cannot ...
, and the flushing out of its drainage system, temporary steel tanks have been installed in the bore with regular inspections of the tunnel with a particular focus on this issue. Furthermore, solutions to prevent reoccurrence in the long term have been identified and are to be compiled into a plan for approval by the Federal Office for Transport during late 2020; if approved, sections of the LBT shall be modified accordingly. On 27 April 2020, it was announced that the LBT had been fully reopened.


Travel speeds

* Regular freight trains: * Qualified freight trains: * Passenger trains: * Tilting passenger trains:


Geothermal energy

Warm groundwater continuously drains from the LBT. The warmth of this water flowing out of the tunnel is used to heat the Tropenhaus Frutigen, a tropical greenhouse producing exotic fruit,
sturgeon Sturgeon is the common name for the 27 species of fish belonging to the family Acipenseridae. The earliest sturgeon fossils date to the Late Cretaceous, and are descended from other, earlier acipenseriform fish, which date back to the Early ...
meat and
caviar Caviar (also known as caviare; from fa, خاویار, khâvyâr, egg-bearing) is a food consisting of salt-cured roe of the family Acipenseridae. Caviar is considered a delicacy and is eaten as a garnish or a spread. Traditionally, the te ...
.


See also

*
Lötschberg The Lötschberg is an Alpine mountain massif and usually associated with a major, historically important transit axis of the Alps in Switzerland with, at its core, the Lötschen Pass (german: Lötschenpass, Swiss German: ''Lötschepass''). The mo ...
*
Lötschberg Tunnel , line = Lötschberg Line , location = Circumventing the Lötschen Pass in the Bernese Alps in Switzerland(Canton of Bern, canton of Valais) , coordinates = – , system = BLS, SBB CFF FFS , status = , st ...
*
Simplon Tunnel , it, Galleria del Sempione , line = Simplon line, (Lötschberg railway line) , location = Traversing the Lepontine Alps between Switzerland and Italy , coordinates = – , system = Swiss Federal Railways (SBB CFF  ...
*
NRLA The New Railway Link through the Alps (NRLA; german: Neue Eisenbahn-Alpentransversale, NEAT, french: nouvelle ligne ferroviaire à travers les Alpes, NLFA, it, Nuova ferrovia transalpina, NFTA), is a Swiss construction project for faster north� ...
*
List of longest tunnels This list of longest tunnels ranks tunnels that are at least long. Only continuous tunnels are included. Pipelines, even those that are buried, are excluded. The longest tunnels have been constructed for water distribution, followed by tunnels ...
*
List of tunnels by location The list of tunnels includes any road tunnel, railway tunnel or waterway tunnel anywhere in the world. Afghanistan * Salang Tunnel Albania Andorra * Envalira Tunnel, road * Pont Pla Tunnel, 1.26 km, road * Sant Antoni Tunnel, 280&nb ...


Notes and references


External links


Official project site

Official site of the "ARGE Bahntechnik Lötschberg" the general contractor for the railway technology

AlpTransit Portal
of the
Swiss Federal Archives The Swiss Federal Archives (german: Schweizerisches Bundesarchiv, french: Archives fédérales suisses, it, Archivio federale svizzero, rm, Archiv federal svizzer) are the national archives of Switzerland. Additionally, the cantons have offic ...

Site with a movie documentation about the engineering and the works
(railway technology)
Rail Technology in the Lötschberg Base Tunnel


{{DEFAULTSORT:Lotschberg Base Tunnel Railway tunnels in Switzerland Bernese Oberland Buildings and structures in Valais High-speed railway lines in Switzerland Tunnels completed in 2007 Transport in the canton of Bern Bern–Valais border Tunnels in the Alps Base tunnels