Line 8 is a north-south line of the
Shanghai Metro
The Shanghai Metro (; Shanghainese: ''Zaon6he5 Di6thiq7'') is a rapid transit system in Shanghai, operating urban and suburban transit services to 14 of its 16 List of township-level divisions of Shanghai, municipal districts and to the neighb ...
network. It runs from , in
Yangpu District
Yangpu () is one of the 16 districts of Shanghai. It is located in the northeastern part of downtown Shanghai, bordering the Huangpu River on the east and south, Hongkou on the west, and Baoshan on the north. The southern part of Yangpu Dist ...
to , in
Minhang. The line is colored blue on system maps.
History
The subway line's first phase began trial operation on September 17, 2007 and officially opened on December 29, 2007, running between and . The second phase, from Yaohua Road to began operation on July 5, 2009.
Two stations opened later than the rest of the line: in September 2012 and opened in April 2011.
On May 4, 2017 it was announced the third phase had been renamed the
Pujiang line, and will be a new long
automated people mover line running from
Shendu Highway station to
Huizhen Road station. It will use rubber tire Bombardier Innovia APM 300 technology. On January 13
Bombardier delivered the first out of 44 autonomous people movers to Shanghai. It opened on March 31, 2018.
Controversy
Even though Line 8 is a heavy rail rapid transit line, Class C trains designed for
light metro
A medium-capacity system (MCS), also known as light rapid transit or light metro, is a rail transport system with a capacity greater than light rail, but less than typical heavy-rail rapid transit. MCS trains are usually 1 to 4 cars. Most medi ...
lines consisting of 6 or 7 cars are being used throughout the line. Due to the trains relatively smaller
loading gauge
A loading gauge is a diagram or physical structure that defines the maximum height and width dimensions in railway vehicles and their loads. Their purpose is to ensure that rail vehicles can pass safely through tunnels and under bridges, and k ...
and capacity compared to Class A trains used on other Shanghai Metro lines, the line is extremely crowded. This has caused much doubt among the public in Shanghai Metro's ability to accurately predict passenger flows for future lines.
It was revealed that Line 8 originally was forecasted to have a short term daily ridership of 400,000-500,000 people/day, which warrants the use of larger Class A trains on other Shanghai Metro lines. This is not surprising given Line 8 is planned to serve some of Shanghai's densest neighborhoods and several major attractions. However the forecast was revised many times and finally downgraded to 200,000 people/day through "internal negotiation and coordination", which allowed Shanghai
Alstom
Alstom SA () is a French multinational rolling stock manufacturer which operates worldwide in rail transport markets. It is active in the fields of passenger transportation, signaling, and locomotives, producing high-speed, suburban, regional ...
, a company interested in manufacturing and selling Class C trains in Shanghai, to build trains for Line 8.
Chief designer Yu Jiakang noted that in addition to short term solutions such as operating 7 car trains and reducing headways, last resort is to rebuild Line 8 as the loading gauges of Class C trains are incompatible with Class C trains. Additionally, parallel relief bus services have started operating.
The initial 28 trainsets were 6-car consists. Due to overcrowding, subsequent train purchases (62 sets) were 7-car sets. There was a canceled plan to expand 08C01 stocks from the 6-car sets to 7-car sets.
Stations
Service routes
Important stations
* - At this station, passengers can transfer to
line 3. Previously they must exit and re-enter the station, but a new linkway has been built via the shopping center.
* - Passengers can interchange to lines
1 and
2. This is also a very important station, as it is located at a major financial district as well as near many tourist attractions.
*: The first platform to platform interchange station in the
Shanghai Metro
The Shanghai Metro (; Shanghainese: ''Zaon6he5 Di6thiq7'') is a rapid transit system in Shanghai, operating urban and suburban transit services to 14 of its 16 List of township-level divisions of Shanghai, municipal districts and to the neighb ...
network. Interchange with
line 4.
Station name change
* On May 7, 2011,
Jiyang Road was renamed .
* On June 9, 2013, the
Aerospace Museum was renamed .
Headways
Technology
Signalling
From June 19 to July 1, 2009, during the second phase of line 8 signal commissioning (upgrade from fully manual driving to CBTC semi-automatic driving), the first phase of operation efficiency was unstable, and trains stopped frequently. As a result, the driving time was much longer than normal, resulting in passenger congestion and seven consecutive large-scale failures. After investigation by the Shanghai Metro, it was found that the main reason for the stoppage of the train on Line 8 was that the communication transmission time set by the CBTC on-board software was too short, which caused the train to transmit too much data to the central computer, and the train was unable to accurately receive wireless signals. On July 2, 2009, after all the on-board software of the train was updated to resolve this issue.The second phase of the trial operation of Line 8 tomorrow will find and eliminate the cause of the previous operational disorder.
(originally published in "Youth Daily"). news.xinmin.cn. 2009-07-04.
Rolling Stock
The designed speed of the train is 80 km/h, the length is 19.49 meters (Tc)/19.44 meters (Mp, M) (compare to longer, more common Class A carriages at 23 meters), and the width is 2.6 meters (Class A carriages are wider at 3.0 meters).
File:Shanghai Metro Line 8 AC07.JPG, 08C01 train
File:Shanghai Metro Line 8 AC15.jpg, 08C02 train
References
{{DEFAULTSORT:Shanghai Metro, Line 8
Shanghai Metro lines
Railway stations in Shanghai opened in 2007