History
The line became China's first national "Worker Pioneer" metro line on the 11th October, 2009.Construction accident
On August 20, 2001, on 20.10 at construction site during excavating the foundation pit, earthmoving sudden landslide, killing four people died who were buried in the landslide. At 4 o'clock in the morning on July 1, 2003, the Pudongnan Road-Nanpu Bridge section of Line 4 suddenly saw water seepage during the construction of the connecting passage between the upper and lower tunnels. After that, a large amount of quicksand poured into the tunnel, causing internal and external pressure imbalance, which caused partial collapse of the tunnel. It has a funnel-shaped settlement. At 9 o'clock in the morning, the podium of a nearby building on South Zhongshan Road collapsed; beginning in the early morning of the July 2, the flood wall of Dongjiadu Waima Road section began to sink and crack due to the settlement. The embankment collapsed in a serious accident. The Linjiang Garden Building near the scene also experienced subsidence, the most serious settlement exceeded in an hour, and the cumulative settlement reached . This incident affected the plan for the opening of the entire line of Line 4. In August 2004, the Dongjiadu section restoration project was started and it was restored with the opening of the second section in July 2007. On November 5, 2004, the Shanghai Second Intermediate People's Court issued a judgement on the deputy project manager of the subcontractor for the construction of the intermediate air shaft and side channel freezing method. The court convicted him for the crime of a major liability accident which has a fixed-term imprisonment of two years and six months and a probation of three years. The project director representative has a fixed-term imprisonment of six-month with a probation period of two years. The general contractor's project manager for two years with a fixed-term imprisonment of one year and six months. At unbalanced subsidence was discovered. From January 22 to January 28, 2012, it was closed for an overhaul.Stations
Service routes
Important stations
*: Interchange with line 3. To transfer to line 1, passengers need to exit through a tunnel inside Shanghai railway station and purchase a ticket to re-enter the station. *: Interchange with lines 2 and 3. *: Interchange with lines 2, 6 and 9. It is Shanghai's first 4-line interchange station. *: The first platform-to-platform interchange station in theStation name change
* On 28 October 2006, Dongfang Road was renamed as the after station renovation for line 2 and the opening of line 4.Headways
Technology
Signaling
Line 4 has been operating over capacity due to large passenger flows for a number of years. With the continuous extensions of operating time, the problems of aging equipment and increasing passenger demand will further increase the operating pressure of the two lines. In June 2021 it was announced that Shanghai Metro has started to update of the signal system and finish before December 31, 2024. These are the last lines in the system that are equipped with fixed block Alstom URBALISTM 200 system, not equipped with CBTC systems capable of headways as low as 90 seconds. CASCO successfully won the bid for the renewal and transformation of the signaling using Qiji TACS system.Rolling Stock
The line operates with 6-car Class A trains.References
{{DEFAULTSORT:Shanghai Metro, Line 4 Shanghai Metro lines Railway loop lines Railway lines opened in 2005 2005 establishments in Shanghai 1500 V DC railway electrification