The King Street Bridge carries King Street over the
Yarra River The Yarra River or historically, the Yarra Yarra River, (Kulin languages: ''Berrern'', ''Birr-arrung'', ''Bay-ray-rung'', ''Birarang'', ''Birrarung'', and ''Wongete'') is a perennial river in south-central Victoria, Australia. The lower st ...
in
Melbourne Melbourne ( ; Boonwurrung/Woiwurrung: ''Narrm'' or ''Naarm'') is the capital and most populous city of the Australian state of Victoria, and the second-most populous city in both Australia and Oceania. Its name generally refers to a metrop ...
, Australia. The bridge continues south as an elevated viaduct, with the Crown Casino built around it in later years. As originally constructed, the bridge had eight lanes across the Yarra River, two through lanes in each direction connecting King Street to Kings Way, in addition to two lanes on each side that connected to Yarra Bank Road. At the south end north facing on and off ramps connected to Whiteman Street, and the running lanes from the viaduct descend to ground level, with tram route 58 emerging from City Road to the median strip. In the 1990s, the development of Crown Casino closed Yarra Bank Road, and the bridge ramps were connected to the basement carpark of the complex. The south end of the bridge has been undergoing differential settlement between the approach ramps resting on fill, and the suspended section supported by bored piles.


History

The
Country Roads Board The Country Roads Board was a government authority responsible for the construction and maintenance of main roads in the state of Victoria, Australia between 1913 and 1983. History The Country Roads Board (CRB) was formed to take over responsi ...
(later
VicRoads VicRoads is a government joint venture in the state of Victoria, Australia. In the state, it is responsible for driver licensing and vehicle registration. It is owned and operated through a joint venture between the Victorian government and ...
), under instructions from the government, prepared specifications in 1956, with expectations of world-wide tenders, for the design and construction of a bridge long and wide, with a continued elevated structure long and wide over the
Yarra River The Yarra River or historically, the Yarra Yarra River, (Kulin languages: ''Berrern'', ''Birr-arrung'', ''Bay-ray-rung'', ''Birarang'', ''Birrarung'', and ''Wongete'') is a perennial river in south-central Victoria, Australia. The lower st ...
at King Street, together with a viaduct crossing above the
Port Melbourne Port Melbourne is an inner-city suburb in Melbourne, Victoria, Australia, south-west of Melbourne's Central Business District, located within the Cities of Melbourne and Port Phillip local government areas. Port Melbourne recorded a populati ...
and
St Kilda railway line The St Kilda railway line is a former railway line in Melbourne, Australia. Operation The line was opened by the Melbourne and Hobson's Bay Railway Company in 1857. It ran for 4.5 kilometres from the Melbourne (or City) Terminus (on the site o ...
s, Whiteman Street, Queensbridge Street, City Road and Hanna Street, and returning to the present level of Hanna Street (later Kings Way) near Grant Street, South Melbourne. Together with the construction of the Flinders Street overpass, the whole project was estimated to cost 3.5mil. Seven tenderers submitted a total of 14 tenders for the work when tenders closed on 29 January 1957, and after examination by the Board's officers, the government accepted the tender of Utah Australia. Contractors from Utah Australia began their operations on the site on 25 November 1957, building a temporary bridge to give access to the eventual location of the bridge's piers over the river. The passing of the ''King-street Bridge Act 1957''King-street Bridge Act 1957
/ref> through the
Parliament of Victoria The Parliament of Victoria is the bicameral legislature of the Australian state of Victoria that follows a Westminster-derived parliamentary system. It consists of the King, represented by the Governor of Victoria, the Legislative Assembly ...
on 18 December, 1957, granted formal permission for the bridge to be built, gave the Country Roads Board powers to take ownership of relevant lands and not to inhibit the operations of the
Port Melbourne Port Melbourne is an inner-city suburb in Melbourne, Victoria, Australia, south-west of Melbourne's Central Business District, located within the Cities of Melbourne and Port Phillip local government areas. Port Melbourne recorded a populati ...
and
St Kilda railway line The St Kilda railway line is a former railway line in Melbourne, Australia. Operation The line was opened by the Melbourne and Hobson's Bay Railway Company in 1857. It ran for 4.5 kilometres from the Melbourne (or City) Terminus (on the site o ...
s during construction, declared the road a "public highway" once completed, and apportioned the total cost of to be borne as follows: 65% by the
Victorian government The Victoria State Government, also referred to as just the Victorian Government, is the state-level authority for Victoria, Australia. Like all state governments, it is formed by three independent branches: the executive, the judicial, and t ...
, 30% by the
City of Melbourne The City of Melbourne is a local government area in Victoria, Australia, located in the central city area of Melbourne. In 2018, the city has an area of and had a population of 169,961. Estimated resident population, 30 June 2018. The ci ...
, and 5% by the
City of South Melbourne The City of South Melbourne was a local government area about south of Melbourne, the state capital of Victoria, Australia, on the south bank of the Yarra River. The city covered an area of , and existed from 1855 until 1994. The council are ...
. The King Street Bridge was designed in 1959 by Hardcastle & Richards, consulting engineers for Utah Australia, on behalf of the Country Roads Board, and constructed over the next two years. (accessed via FoI by Channel 7 news) The substructure of the main bridge was completed in November 1959, and the east and west lanes of the low-level bridge over the Yarra were completed except for handrailing and lighting. Traffic commenced using the east and west lanes of the low-level bridge in November 1960, and on 12 April 1961, the main bridge was opened by the
Premier of Victoria The premier of Victoria is the head of government in the Australian state of Victoria. The premier is appointed by the governor of Victoria, and is the leader of the political party able to secure a majority in the Victorian Legislative Assem ...
Henry Bolte Sir Henry Edward Bolte GCMG (20 May 1908 – 4 January 1990) was an Australian politician who served as the 38th Premier of Victoria. To date he is the longest-serving Victorian premier, having been in office for over 17 consecutive years. ...
. It is of a welded, steel girder concrete deck cantilever-suspended span construction with suspended spans up to approximately long.


Collapse

Soon after completion, on 10 July 1962, one span collapsed under the weight of a 47-ton semi-trailer, though the weight was within the bridge limits. The following, except for the "
Reconstruction Reconstruction may refer to: Politics, history, and sociology *Reconstruction (law), the transfer of a company's (or several companies') business to a new company *''Perestroika'' (Russian for "reconstruction"), a late 20th century Soviet Union ...
" section, is taken from the report of the Royal Commission.


Short history

*September 1956. Design and construct tenders called by the Country Roads Board of Victoria (CRB) as the Constructing Authority. *May 1957. Tenders awarded. *September 1957. Work started. *April 1961. Open to traffic. *October 1961. Bridge handed over to
Melbourne and Metropolitan Board of Works The Melbourne and Metropolitan Board of Works (MMBW) was a public utility board in Melbourne, Australia, set up in 1891 to provide water supply, sewerage and sewage treatment functions for the city. In 1992, the MMBW was merged with a number of sm ...
(MMBW) as a metropolitan highway. *July 1962. Bridge collapsed. *September 1962 to August 1963. Royal Commission into the Failure of Kings Bridge.


Participants for construction

*CRB – Constructing authority and contract principal *UTAH Aust Ltd – Principal contractor *J&W Johns & Waygood – Subcontractor to Utah for fabrication, erection and painting of girders *H&R Hardcastle & Richards, consulting engineers, subcontractor to Utah for detailed design of superstructure *
BHP BHP Group Limited (formerly known as BHP Billiton) is an Australian multinational mining, metals, natural gas petroleum public company that is headquartered in Melbourne, Victoria, Australia. The Broken Hill Proprietary Company was founded ...
Broken Hill Propriety Ltd. for supply of steel


Design

The superstructure design by H&R incorporated standard design details for girders and cover plates as was common at the time for mild steel construction. CRB had allowed in the tender the use of high tensile steel to British Standard BS 968:1941. H&R chose to use this steel to reduce weight, so economising on the cost of the foundations. Design and construction of the foundations was undertaken by UTAH. Included in the CRB tender documents were comprehensive specifications for fabrication in high tensile steel to be read in conjunction with and additional to those of BS 968 -1941. (It was suggested that the Standard may have had erroneous guidelines that were not supported by experience, and that were relied upon for this design).Verbal briefing from Johns & Waygood circa 1967 Neither UTAH nor J&W ever really appreciated the differences that high tensile steel presented in its fabrication, particularly with regards to welding. Therein started the road to failure.


Material supply

J&W, when placing their order for steel from BHP, failed to require additional tests as per the CRB specifications. As a result, BHP only supplied ladle analyses. BHP even stated to J&W at some stage that
Izod test The Izod impact strength test is an ASTM standard method of determining the impact resistance of materials. A pivoting arm is raised to a specific height (constant potential energy) and then released. The arm swings down hitting a notched sample ...
s for
ductility Ductility is a mechanical property commonly described as a material's amenability to drawing (e.g. into wire). In materials science, ductility is defined by the degree to which a material can sustain plastic deformation under tensile stres ...
as per the CRB specifications were useless. Not all tensile and Izod tests for different plate thicknesses were carried out. Steel supplied by BHP was generally very close to the maximum tolerances regarding chemical composition. It was later revealed that the chemical composition of plates sometimes exceeded specification even when ladle analysis was within specification. BHP also did not appreciate the welding requirements for high tensile steel and even advised J&W on occasion that even when the chemical composition shown by ladle analysis exceeded specification, the steel was still weldable. Brittleness was of prime importance and under test, some samples did not even show a yield point.


Cover plates and welding

H&R placed the transverse welded ends of cover plates of tension flanges in regions of low stress as permitted by the specifications. Had proper consideration been given during fabrication to weld preparation, the failure of the bridge may not have occurred. The greatest oversight appeared to be the lack of, or insufficient, preheat around the weld area to limit the intensity of residual stresses in the heat affected zone. In these circumstances, brittle fracture was almost guaranteed. In fact, all the cracks occurred in the HAZ of the plate material. (On the other hand it appears unlikely that preheating could be consistently applied, and that difficulties in application could have resulted in variations in the properties of the steel, including strength loss and stress inconsistencies over the affected or nearby areas – possibly causing similar or other types of failure, such as long term fatigue). Izod tests for plate and welds were specified. Many Izod tests, particularly for welds, were repeated after an initial failure until a pass was achieved . The Commission Report stated that "A more callous disregard of the value of acceptance tests it would be difficult to imagine."


Fabrication inspection

During final inspection of girders, under significant pressure of time and very unsatisfactory circumstances, it was likely that the cracks which eventually caused the bridge to fail were missed. As J&W were responsible for all plate tests, for which they were not particularly convinced were necessary, there was a great deal of bickering between CRB inspectors and J&W shop staff. The Commissioners in their report made the statement that "We hardly know whom to blame the more, J&W for its cavalier attitude or CRB for putting up with it."


Reconstruction

As authority in charge of the bridge at time of failure, MMBW was responsible for the design of the reconstruction method. MMBW Highways Division carried out this work. The engineering staff were William (Bill) Burren, chief engineer, Highways Division; Stan Long, 2nd in charge, Bruce Day, chief structural engineer; Shandor Mokos and Tom Dobson, senior structural engineers; and Graham Ebbage, assistant structural engineer. All are deceased (2020) bar Ebbage who went on to design bridges in Melbourne, Brisbane and Hong Kong. It had to be assumed that all girders contained cracks, whether presently detected or not. It was therefore decided to post tension all girders so as to leave no parts in tension. As each span consisted of four girders, it was decided to construct large heavily reinforced concrete blocks at the ends of each pair of girders. These were to house the anchor blocks of the post tensioning cables. These blocks were held between the girders by heavy high tensile rods passing through each block from girder to girder, averaging about 19 rods each. The cables were of the Freyssinet type with cast iron wedges fastening each cable into a mating block. Each cable was made up of a number of strands each containing seven high tensile wires. As an example, on span no. 11, 110 feet long, the total prestressing force employed amounted to about 11000 tonnes. To protect the cables from corrosion, the cables were enclosed in fibre cement ducts and then high pressure grouted. These are what some people now see as pipes under the bridge. The reconstruction was carried out by John Holland Constructions. Bruce Day was MMBW site engineer for the contract.


References


Further reading


"Report of Royal Commission into the Failure of Kings Bridge"
National Library of Australia The National Library of Australia (NLA), formerly the Commonwealth National Library and Commonwealth Parliament Library, is the largest reference library in Australia, responsible under the terms of the ''National Library Act 1960'' for "mainta ...


External links

*
Transporting of girder through South Melbourne
State Library of Victoria State Library Victoria (SLV) is the state library of Victoria, Australia. Located in Melbourne, it was established in 1854 as the Melbourne Public Library, making it Australia's oldest public library and one of the first free libraries in th ...
{{Yarra River Crossings Bridges in Melbourne Bridges over the Yarra River 1961 establishments in Australia Bridges completed in 1961 Bridge disasters in Australia Bridge disasters caused by engineering error Victoria (Australia) royal commissions Buildings and structures in the City of Melbourne (LGA) Transport in the City of Melbourne (LGA) Southbank, Victoria