The Hualong One ( zh , c=华龙一号 , p=Huálóng yī hào , l=China Dragon №1) is a Chinese Generation III pressurized water nuclear reactor jointly developed by the
China General Nuclear Power Group China General Nuclear Power Group (CGN) (), formerly China Guangdong Nuclear Power Group (), is a Chinese state-owned energy corporation under the State-owned Assets Supervision and Administration Commission of the State Council (SASAC). , CGN i ...
(CGN) and the
China National Nuclear Corporation The China National Nuclear Corporation (CNNC; ) is a state-owned enterprise founded in 1955 in Beijing. CNNC's president and vice-president are appointed by the Premier of the People's Republic of China. CNNC oversees all aspects of China's civ ...
(CNNC). The CGN version, and its derived export version, is called HPR1000. It is commonly mistakenly referred to in media as the "ACPR1000" and "ACP1000", which are in fact earlier reactors design programs by CGN and CNNC. Unit 5 of the
Fuqing Nuclear Power Plant The Fuqing Nuclear Power Plant () is a nuclear power plant in Fuqing, Fujian Province, China. The plant is located on the coast of Xinghua Bay, near Qianxue Village, Sanshan Town. The station has four 1,089 megawatt (MW) CPR-1000 pressuri ...
was the first Hualong One to enter commercial service on 30 January 2021.


Design

Hualong One is jointly developed by the
China National Nuclear Corporation The China National Nuclear Corporation (CNNC; ) is a state-owned enterprise founded in 1955 in Beijing. CNNC's president and vice-president are appointed by the Premier of the People's Republic of China. CNNC oversees all aspects of China's civ ...
(CNNC) and
China General Nuclear Power Group China General Nuclear Power Group (CGN) (), formerly China Guangdong Nuclear Power Group (), is a Chinese state-owned energy corporation under the State-owned Assets Supervision and Administration Commission of the State Council (SASAC). , CGN i ...
(CGN), based on the three-loop ACP1000 of CNNC and ACPR1000 of CGN, which in turn are based on the French M310.


Merger of ACP-1000 and ACPR-1000 into Hualong One

Since 2012, CNNC has been progressively merging its ACP-1000 nuclear power station design with the
CGN CGN may refer to: * CGN, a gene that encodes for the protein cingulin *the Chapman code for Ceredigion, formerly ''Cardiganshire'', a historic county in Wales * China General Nuclear Power Group, a Chinese energy company * ''Compagnie Générale d ...
ACPR-1000 design, while allowing some differences, under direction of the Chinese nuclear regulator. Both are three-loop designs originally based on the same French M310 design used in
Daya Bay Daya Bay (), formerly known as Bias Bay, is a bay of the South China Sea on the south coast of Guangdong Province in China. It is bordered by Shenzhen's Dapeng Peninsula to the west and Huizhou to the north and east. History The bay was a hideo ...
with 157 fuel assemblies, but went through different development processes (CNNC's ACP-1000 has a more domestic design with 177 fuel assemblies while CGN's ACPR-1000 is a closer copy with 157 fuel assemblies). In early 2014, it was announced that the merged design was moving from preliminary design to detailed design. Power output will be 1150 MWe, with a 60-year design life, and would use a combination of passive and active safety systems with a double containment. CNNC's 177 fuel assembly design was retained. Initially the merged design was to be called the ACC-1000, but ultimately it was named Hualong One. In August 2014 the Chinese nuclear regulator review panel classified the design as a
Generation III reactor Generation III reactors, or Gen III reactors, are a class of nuclear reactors designed to succeed Generation II reactors, incorporating evolutionary improvements in design. These include improved fuel technology, higher thermal efficiency, signi ...
design, with independently owned intellectual property rights. As a result of the success of the merger, ACP-1000 and ACPR-1000 designs are no longer being offered. After the merger, both companies retain their own supply chain and their versions of the Hualong One will differ slightly (units built by CGN will retain some features from the ACPR1000) but the design is considered to be standardised. CNNC version emphasizes more passive safety due to influence from Westinghouse AP1000, with increased containment volume and two active safety trains, while CGN version has three active safety trains due to influence from Areva EPR. Some 90% of its components will be made domestically. The Hualong One power output will be 1170 MWe gross, 1090 MWe net, with a 60-year design life, and would use a combination of passive and active safety systems with a double containment. It has a 177 assembly core design with an 18-month refuelling cycle. The power plant's utilisation rate is as high as 90%. CNNC has said its active and passive safety systems, double-layer containment and other technologies meet the highest international safety standards. According to CNNC, the Hualong One has a construction cost of CNY17,000 per kW. A the end of August 2014, Chinese regulators were satisfied that Hualong One was a Generation III design and that intellectual property rights were fully held in China. Chinese media reports that all core components are manufactured in China and that 17 universities and research institutions, 58 state-owned enterprises and over 140 private firms across China worked on Hualong One's development to ensure all core components were able to be produced domestically.


EU approval

In November 2021, the European Utility Requirements (EUR) organisation formally certified the Hualong One (HPR1000) as compliant after a four-step process which began in August 2017. The requirements covered a broad range of conditions for nuclear power plants to operate efficiently and safely.


UK approval

In February 2022, UK regulators announced that the Hualong One (HPR1000) had passed the four-step Generic Design Assessment (GDA) which started in August 2017 and was thus suitable for construction in the UK, possibly in the Bradwell B nuclear power station project. The
Office for Nuclear Regulation The Office for Nuclear Regulation (ONR) is the regulator for the nuclear industry in the United Kingdom.< ...
issued a Design Acceptance Confirmation (DAC) and the UK Environment Agency issued a Statement of Design Acceptability (SoDA).


Construction

The first units to be constructed will be
Fuqing (,Foochow Romanized: Hók-chiăng; also romanized as Hokchia) is a coastal county-level city under the jurisdiction of Fuzhou, the capital of Fujian Province, China. Covering 1,432 square kilometers and home to over 1.46 million residents ( ...
5 and 6 (Fujian Province), followed by
Fangchenggang Fangchenggang ( "Port of Fangcheng") is a prefecture-level city in the south of Guangxi Zhuang Autonomous Region, People's Republic of China. Fangchenggang is the southernmost port in China and is located in Fangcheng. It primarily service ...
3 and 4 (Guangxi),
Zhangzhou Zhangzhou (, ) is a prefecture-level city in Fujian Province, China. The prefecture around the city proper comprises the southeast corner of the province, facing the Taiwan Strait and (with Quanzhou) surrounding the prefecture of Xiamen. Nam ...
1 and 2 (Fujian), Taipingling 1 and 2 (Guangdong), and San'Ao 1 and 2 (Zhejiang). Fuqing 5 began commercial operation on 30 January 2021. CGN's first Hualong One reactor (HPR1000) was connected to the grid on 10 January 2023. China's State Council approved the construction of six Hualong One units for Ningde (5 & 6), Shidaowan (1 & 2), and Zhangzhou (3 & 4). There are five Hualong One reactors planned for
Pakistan Pakistan, officially the Islamic Republic of Pakistan, is a country in South Asia. It is the List of countries and dependencies by population, fifth-most populous country, with a population of over 241.5 million, having the Islam by country# ...
, four reactors are planned at
Karachi Nuclear Power Complex The Karachi Nuclear Power Plant (or KANUPP) is a large commercial nuclear power plant located at the Paradise Point in Karachi, Sindh, Pakistan. Officially known as Karachi Nuclear Power Complex, the power generation site is composed of three ...
and one reactor at
Chashma Nuclear Power Plant The Chashma Nuclear Power Plant (or CHASNUPP) is a large commercial nuclear power plant located at Chashma in Mianwali, Punjab, Pakistan. Officially known as Chashma Nuclear Power Complex, the nuclear power plant is generating energy for in ...
, out of which two are under construction at Karachi. Construction of another Hualong One reactor was planned to start in 2020 in
Argentina Argentina, officially the Argentine Republic, is a country in the southern half of South America. It covers an area of , making it the List of South American countries by area, second-largest country in South America after Brazil, the fourt ...
, but was stalled during negotiation. The project was reactivated in 2021 and expected to start construction in mid 2022, with completion date by 2028.


China


Pakistan


International marketing

In December 2015, CGN and CNNC agreed to create Hualong International Nuclear Power Technology Co as a joint venture to promote the Hualong One in overseas markets, which was officially launched in March 2016. On 19 January 2017, the
United Kingdom The United Kingdom of Great Britain and Northern Ireland, commonly known as the United Kingdom (UK) or Britain, is a country in Northwestern Europe, off the coast of European mainland, the continental mainland. It comprises England, Scotlan ...
Office for Nuclear Regulation The Office for Nuclear Regulation (ONR) is the regulator for the nuclear industry in the United Kingdom.< ...
(ONR) started their
Generic Design Assessment The Office for Nuclear Regulation (ONR) is the regulator for the nuclear industry in the United Kingdom.< ...
process for the Hualong One, expected to be completed in 2021, in advance of possible deployment at the
Bradwell nuclear power station Bradwell nuclear power station is a Magnox-design nuclear power station that is undergoing decommissioning. It is located on the Dengie peninsula at the mouth of the River Blackwater, Essex. In 2019, it was the first nuclear power station in ...
site. On 16 November 2017, the ONR and the Environment Agency announced they are progressing to the next phase of their Generic Design Assessment of the UK HPR1000 reactor. Step 2 formally commenced on this day and is planned to take about 12 months. The targeted timescale for the UK HPR1000 GDA process is about five years from the start of Step 1.


Hualong Two

CNNC plans to start building a follow-on version, named Hualong Two, by 2024. It will be a more economical version using similar technology, reducing build time from 5 years to 4, and reducing costs by around a fourth from 17,000 yuan per kW to 13,000 yuan per kW.


See also

*
Generation III reactor Generation III reactors, or Gen III reactors, are a class of nuclear reactors designed to succeed Generation II reactors, incorporating evolutionary improvements in design. These include improved fuel technology, higher thermal efficiency, signi ...
*
Nuclear power in China According to the National Nuclear Safety Administration of China, as of 2024 Dec 31, there are 58 nuclear power-plants operating in mainland China, second only to the US which has 94. The installed power sits at 60.88 GW, ranked third after ...