HOME

TheInfoList



OR:

The Renewable Energy Sources Act or EEG (german: Erneuerbare-Energien-Gesetz) is a series of German laws that originally provided a
feed-in tariff A feed-in tariff (FIT, FiT, standard offer contract,Couture, T., Cory, K., Kreycik, C., Williams, E., (2010)Policymaker's Guide to Feed-in Tariff Policy Design National Renewable Energy Laboratory, U.S. Dept. of Energy advanced renewable tariff, ...
(FIT) scheme to encourage the generation of
renewable electricity Renewable energy is energy that is collected from renewable resources that are naturally replenished on a human timescale. It includes sources such as sunlight, wind, the movement of water, and geothermal heat. Although most renewable energy ...
. The specified the transition to an
auction An auction is usually a process of buying and selling goods or services by offering them up for bids, taking bids, and then selling the item to the highest bidder or buying the item from the lowest bidder. Some exceptions to this definition ex ...
system for most technologies which has been finished with the current version EEG 2017. The EEG first came into force on 1April 2000 and has been modified several times since. The original legislation guaranteed a grid connection, preferential dispatch, and a government-set feed-in tariff for 20years, dependent on the technology and size of project. The scheme was funded by a surcharge on electricity consumers, with electricity-intensive manufacturers and the railways later being required to contribute as little as 0.05¢/kWh. For 2017, the unabated EEG surcharge is . In a study in 2011, the average retail price of electricity in Germany, among the highest in the world, stood at around . The EEG was preceded by the Electricity Feed-in Act (1991) which entered into force on 1January 1991. This law initiated the first
green electricity Low-carbon power is electricity produced with substantially lower greenhouse gas emissions than conventional fossil fuel power generation. The energy transition to low-carbon power is one of the most important actions required to limit climate ...
feed-in tariff scheme in the world. The original EEG is credited with a rapid uptake of
wind power Wind power or wind energy is mostly the use of wind turbines to generate electricity. Wind power is a popular, sustainable, renewable energy source that has a much smaller impact on the environment than burning fossil fuels. Historically ...
and photovoltaics (PV) and is regarded nationally and internationally as an innovative and successful energy policy measure. The act also covers biomass (including
cogeneration Cogeneration or combined heat and power (CHP) is the use of a heat engine or power station to generate electricity and useful heat at the same time. Cogeneration is a more efficient use of fuel or heat, because otherwise- wasted heat from elec ...
),
hydroelectricity Hydroelectricity, or hydroelectric power, is electricity generated from hydropower (water power). Hydropower supplies one sixth of the world's electricity, almost 4500 TWh in 2020, which is more than all other renewable sources combined an ...
, and geothermal energy. A significant revision to the EEG came into effect on 1August 2014. The prescribed feed-in tariffs should be gone for most technologies in the near future. Specific deployment corridors now stipulate the extent to which renewable electricity is to be expanded in the future and the funding rates are no longer set by the government, but are determined by
auction An auction is usually a process of buying and selling goods or services by offering them up for bids, taking bids, and then selling the item to the highest bidder or buying the item from the lowest bidder. Some exceptions to this definition ex ...
. Plant operators market their production directly and receive a market premium to make up the difference between their bid price and the average monthly spot market price for electricity. The EEG surcharge remains in place to cover this shortfall. This new system was rolled out in stages, starting with ground-mounted photovoltaics in the 2014 law. More legislative revisions for the other branches were introduced with the current EEG on 1January 2017. The current EEG has been criticized for setting the deployment corridors (see
table Table may refer to: * Table (furniture), a piece of furniture with a flat surface and one or more legs * Table (landform), a flat area of land * Table (information), a data arrangement with rows and columns * Table (database), how the table data ...
) too low to meet Germany's long-term climate protection goals, particularly given the likely electrification of the transport sector. The government target for the share of renewables in power generation is at least 80% by 2050. The controversial EEG surcharge (or levy) on consumer power bills was removed, effective 1July 2022. As a result, the average German household is expected to save around peryear. Payment obligations will now be met from proceeds from emissions trading and from the federal budget. Guaranteed tariffs for renewables project will continue to be offered going forward.


Background

The pioneer EEG (spanning 2001–2014) and its predecessor the Electricity Feed-in Act (1991) (spanning 1991–2001) class as
feed-in tariff A feed-in tariff (FIT, FiT, standard offer contract,Couture, T., Cory, K., Kreycik, C., Williams, E., (2010)Policymaker's Guide to Feed-in Tariff Policy Design National Renewable Energy Laboratory, U.S. Dept. of Energy advanced renewable tariff, ...
(FIT) schemes, a policy mechanism designed to accelerate the uptake of renewable energy technologies. The scheme offers long-term contracts to renewable energy producers, based on the cost of generation of the particular technology in question. In addition, a grid connection and preferential dispatch are also guaranteed. The tariffs (''Einspeisevergütungen'') themselves are funded by a levy or surcharge (''EEG-Umlage'') on electricity consumers, with electricity-intensive manufacturers being largely exempted. The EEG surcharge is based on the difference between the specified feed-in tariffs paid under the EEG and the sale of the renewable energy at the EEX energy exchange by the grid operators (also known as
transmission system operator File:Electricity grid simple- North America.svg, 380px, Simplified diagram of AC electricity grid from generation stations to consumers rect 2 243 235 438 Power station rect 276 317 412 556 Transformer rect 412 121 781 400 Electric power transmis ...
s or TSO). , the TSOs comprise 50Hertz Transmission, Amprion, Tennet TSO, and TransnetBW. Amendments to the original EEG added the concept of a market premium in 2012. And the use of deployment corridors and
auctions An auction is usually a process of buying and selling goods or services by offering them up for bids, taking bids, and then selling the item to the highest bidder or buying the item from the lowest bidder. Some exceptions to this definition ex ...
to set the levels of uptake and remuneration, respectively, in 2014. The EEG has generally been regarded as a success. The EEG (2000) led to the particularly rapid uptake of two renewable energy technologies:
wind power Wind power or wind energy is mostly the use of wind turbines to generate electricity. Wind power is a popular, sustainable, renewable energy source that has a much smaller impact on the environment than burning fossil fuels. Historically ...
and photovoltaics. The high growth of photovoltaics in Germany is set against its relatively poor solar resource. As the US NREL observed: The share of electricity from renewable energy sources has risen dramatically since the introduction of the EEG in 2000. The average annual growth rate is around 9billion kWh and almost all of this increase is due to electricity generation that qualifies for EEG payments. The EEG is also responsible for 88.3 Mt eq of avoided emissions in 2014, thus making a significant contribution to Germany's climate protection targets. The following table summarizes the remarkable uptake of renewables and in particular photovoltaics: Under the legislation, hydropower includes "wave, tidal, salinity gradient and marine current energy". The use of biomass for electricity generation has also grown as a result of the EEG. Biomass includes: "
biogas Biogas is a mixture of gases, primarily consisting of methane, carbon dioxide and hydrogen sulphide, produced from raw materials such as agricultural waste, manure, municipal waste, plant material, sewage, green waste and food waste. It is a ...
, biomethane, landfill gas and sewage treatment gas and from the biologically degradable part of waste from households and industry".
Mine gas Firedamp is any flammable gas found in coal mines, typically coalbed methane. It is particularly found in areas where the coal is bituminous. The gas accumulates in pockets in the coal and adjacent strata and when they are penetrated the releas ...
is in a separate category. Germany's national energy policy is set out in the government's ''Energy Concept'' released on 28September 2010. On 6June 2011, following
Fukushima may refer to: Japan * Fukushima Prefecture, Japanese prefecture ** Fukushima, Fukushima, capital city of Fukushima Prefecture, Japan ***Fukushima University, national university in Japan *** Fukushima Station (Fukushima) in Fukushima, Fukushim ...
, the government removed the use of nuclear power as a bridging technology and reintroduced a nuclear phase-out. Boosting renewable electricity generation is an essential part of national policy (see
table Table may refer to: * Table (furniture), a piece of furniture with a flat surface and one or more legs * Table (landform), a flat area of land * Table (information), a data arrangement with rows and columns * Table (database), how the table data ...
). The EEG is also a key element in the implementation of EU Directive 2009/28/EC on the promotion of the use of energy from renewable sources. This directive requires Germany to produce 18% of its gross final energy consumption (including heat and transport) from renewable energy sources by 2020. In this endeavour, the EEG is complemented by the Renewable Energies Heat Act (''Erneuerbare-Energien-Wärmegesetz'' or ''EEWärmeG''). A chart overviewing German energy
legislation Legislation is the process or result of enrolling, enacting, or promulgating laws by a legislature, parliament, or analogous governing body. Before an item of legislation becomes law it may be known as a bill, and may be broadly referred to ...
in 2016 is available.


Legislation

The first discussions on feed-in tariffs in the German parliament began in the 1980s. The Association for the Promotion of Solar Power (SFV), Eurosolar, and the Federal Association of German Hydroelectric Power Plants (BDW) floated early concepts for a FIT scheme. The Economics Ministry and the CDU/ CSU and FDP parties opposed non-market measures and argued for voluntary renewables quotas instead. In the late 1980s, CDU/CSU and
Green Green is the color between cyan and yellow on the visible spectrum. It is evoked by light which has a dominant wavelength of roughly 495570 nm. In subtractive color systems, used in painting and color printing, it is created by a combi ...
politicians drafted a feed-in tariff bill and sought parliamentary and external support. The newly formed Environment Ministry backed the proposal. The incumbent electricity producers did not devote much effort to counter the bill because they believed its effects would be minimal and their lobby effort was preoccupied with the takeover of the East German electricity system following German reunification in 1989. The bill became the Electricity Feed-in Act (1991). Prior to the Electricity Feed-in Act, operators of small power plants could only obtain access to the grid at the behest of the grid owners and were sometimes refused entirely. Remuneration was based on the averted costs faced by the energy utilities, yielding low rates and unattractive investment conditions. Government support for renewable electricity before the act was primarily through R&D programs administered by the Federal Ministry for Research and Technology (BMFT).


Electricity Feed-in Act (1991)

Germany first began promoting renewable electricity using feed-in tariffs with the Electricity Feed-in Act (''Stromeinspeisungsgesetz'' or ''StrEG''). The long title is the law on feeding electricity from renewable energy sources into the public grid. The law entered into force on 1January 1991. This legislation was the first
green electricity Low-carbon power is electricity produced with substantially lower greenhouse gas emissions than conventional fossil fuel power generation. The energy transition to low-carbon power is one of the most important actions required to limit climate ...
feed-in tariff scheme in the world. The law obliged grid companies to connect all renewable power plants, to grant them priority dispatch, and pay them a guaranteed feed-in tariff over 20years. While the Electricity Feed-in Act did much to promote wind power, the installed capacity of photovoltaic installations remained low (see
table Table may refer to: * Table (furniture), a piece of furniture with a flat surface and one or more legs * Table (landform), a flat area of land * Table (information), a data arrangement with rows and columns * Table (database), how the table data ...
). The remuneration for photovoltaics was simply too little in most settings. Low-interest loans were then offered under additional government programs. Beginning in 1998, the Electricity Feed-in Act was challenged under European Union anti-subsidy rules by
PreussenElektra PreussenElektra (''Preußische Elektrizitäts AG'') was a German electric company that existed from 1927 to 2000. From its founding until around 1970, it was owned (directly or indirectly) by the Republic of Prussia and the Federal Republic of G ...
(an E.ON predecessor). The European Court of Justice (ECJ) found that the arrangements did not constitute state aid. The court concluded: The Electricity Feed-in Act suffered from structural flaws. First, the coupling of feed-in tariffs to the electricity price proved too volatile to ensure investment security. Second, the distribution of burdens was uneven, with grid operators in high-wind regions having to pay out more. In light of this latter concern, the act was amended in 1998 to introduce, among other things, a double 5% cap on feed-in purchases. This ceiling slowed uptake in some regions. The Electricity Feed-in Act was enacted by a CDU/ CSU/ FDP coalition
government A government is the system or group of people governing an organized community, generally a state. In the case of its broad associative definition, government normally consists of legislature, executive, and judiciary. Government is ...
.


Renewable Energy Sources Act (2000)

The Electricity Feed-in Act was replaced by the Renewable Energy Sources Act (2000), also known as the EEG (2000), and came into force on 1April 2000. The legislation is available in English. The long title is an act on granting priority to renewable energy sources. The three principles of the act are: * Investment protection through guaranteed feed-in tariffs and connection requirement. Every kilowatt-hour generated from a renewable electricity facility receives a confirmed technology-specific feed-in tariff for 20years. Grid operators are required to preferentially dispatch this electricity over electricity from conventional sources like nuclear power, coal, and gas. As a result, small and medium enterprises were given new access to the electricity system, along with energy cooperatives (''Genossenschaft''), farmers, and households. * No charge to German public finances. The remuneration payments are not considered public subsidies since they are not derived from taxation but rather through an EEG surcharge on electricity consumers. In 2015, the aggregate EEG surcharge totalled €21.8billion and the EEG surcharge itself was 6.17¢/kWh. The EEG surcharge can be substantially reduced for electricity-intensive industries under the 'special equalization scheme' (''Besonderen Ausgleichsregelung'') (introduced in a 2003 amendment). * Innovation by decreasing feed-in-tariffs. The feed-in tariffs decrease at regular intervals to exert a downwards cost pressure on plant operators and technology manufacturers. This decrease, known as a 'degression', applies to new installations. It is expected that technologies become more cost efficient with time and the legislation captures this view: Unlike the preceding Electricity Feed-in Act, feed-in tariffs were now specified in absolute terms and no longer tied to the prevailing electricity price. The tariffs also differentiated between scale (larger plants received less) and electricity yield (wind turbines in low-wind areas received more). The new tariffs were based on cost-recovery plus profit and increased substantially. For instance, photovoltaic remuneration rose from 8.5¢/kWh to a maximum of 51¢/kWh. Offshore wind, geothermal energy, and
mine gas Firedamp is any flammable gas found in coal mines, typically coalbed methane. It is particularly found in areas where the coal is bituminous. The gas accumulates in pockets in the coal and adjacent strata and when they are penetrated the releas ...
were included for the first time. The concept of an annual reduction or 'degression' was introduced, with annual degression rates varying between 1% for biomass and 5% for photovoltaics. Photovoltaics installations were capped at 350MWp to control costs (later raised to 1000MWp in 2002 and removed in 2004). The new act introduced a nationwide compensation scheme with the aim of spreading the remuneration burden on grid operators across all electricity utilities. This included a new EEG surcharge (''EEG-Umlage'') to fund the feed-in remunerations. The previous double-5% cap was duly removed. The new act also introduced the 100,000 roofs program (''100.000-Dächer-Programm''). This ran until 2003 and offered low-interest loans for photovoltaic installations below 300MWp. It proved highly successful in combination with the FIT scheme and led to a rapid increase in photovoltaic capacity. The first EEG amendment, effective from 16July 2003, introduced the 'special equalisation scheme' (''Besondere Ausgleichsregelung''), designed to unburden electricity-intensive industries from the rising EEG surcharge. To be eligible, companies had to fulfil the following criteria: electricity consumption of more than 100GWh/a, electricity expenses of more than 20% of gross value added, and a considerable impairment of competitiveness. Exempted firms pay only 0.05¢/kWh. As a result, non-privileged consumers faced a higher EEG surcharge. Arbitration on eligibility was by the
Federal Office of Economics and Export Control The Federal Office for Economic Affairs and Export Control (Bundesamt für Wirtschaft und Ausfuhrkontrolle, short BAFA) is a German federal agency. The BAFA is authorised to make the final decision on whether German goods are permitted for expor ...
(''Bundesamt für Wirtschaft und Ausfuhrkontrolle''). The EEG was built on experience gained under the Electricity Feed-in Act. Without the prior act, the EEG would not have been as sophisticated or as far reaching. Notwithstanding, the Economics Ministry remained hostile to the concept of feed-in tariffs and refused to help with legal drafting. An SPD/ Greens coalition
government A government is the system or group of people governing an organized community, generally a state. In the case of its broad associative definition, government normally consists of legislature, executive, and judiciary. Government is ...
, elected in 1998, paved the way for the reform of the Electricity Feed-in Act to give the EEG (2000).


PV Interim Act (2003)

The PV Interim Act (2003) raised photovoltaic tariffs from 1January 2004 and in particular for small rooftop installations, to compensate for the ending of low-interest loans under the expiring 100,000 roofs program. The limit on free-standing photovoltaic systems exceeding 100kWp and the 1000MWp cap on photovoltaic installations in total were both removed.


Renewable Energy Sources Act (2004)

An amended version of the EEG came into force on 1August 2004. While the basic framework remained unchanged, this act introduced a substantially modified and differentiated tariff structure, to better match the economic viabilities of the technologies concerned. Tariffs for biomass, photovoltaics, and geothermal energy were increased. Detailed measures were introduced to deal with market complexities, windfall profits, and the incentives for innovation and cost reduction. Eligible projects may no longer degrade ecologically sensitive areas. Exemptions for industry from the EEG surcharge under the special equalization scheme were extended considerably. The minimum electricity consumption requirement was reduced to 10GWh/a, the share of electricity costs relative to gross value added was reduced to 15%, and the impairment of competitiveness criteria was removed altogether. Railways were now automatically exempt, being regarded as an environmentally friendly form of transport. Renewable targets were now defined in the act for the first time: 12.5% for the share of renewable energy in gross final electricity consumption by 2010 and at least 20% by 2020. Thus the EEG (2004) resulted in significantly better conditions for photovoltaics, biomass (including small farm systems and new technologies), offshore wind, and geothermal energy, while onshore wind and small hydroelectric plant largely retained their former standing. The new special equalization scheme lead to wider benefits for industry. Only about 40 companies complied under the previous rules, mostly from the chemical, steel, and metals industries. That number climbed to between 120 and 350 with the new rules. The
European Union Emission Trading Scheme The European Union Emissions Trading System (EU ETS) is a "cap and trade" scheme where a limit is placed on the right to emit specified pollutants over an area and companies can trade emission rights within that area. It covers around 45% of th ...
(EUETS) entered into effect on 1January 2005. Many industry lobbyists argued that the emissions trading transcended the need for a renewable electricity feed-in tariff scheme and that the EEG should therefore be scrapped. In December 2005 the
European Commission The European Commission (EC) is the executive of the European Union (EU). It operates as a cabinet government, with 27 members of the Commission (informally known as "Commissioners") headed by a President. It includes an administrative body ...
released a report preferring feed-in tariffs for national renewable electricity support. The 2004 legislation was overseen by an SPD/ Greens coalition
government A government is the system or group of people governing an organized community, generally a state. In the case of its broad associative definition, government normally consists of legislature, executive, and judiciary. Government is ...
.


Renewable Energy Sources Act (2009)

The 2009 amendments were undertaken alongside a boom in renewable electricity uptake. In 2009, renewables accounted for 16.3% of total electricity generation, up from 9.3% in 2004. Over the same period, the EEG surcharge climbed from 0.54¢/kWh to 1.32¢/kWh. For further context, the European Union climate and energy package, approved on 17December 2008, contained a year 2020 national target for Germany of 18% renewable energy in its total energy consumption. The 2009 amendments yielded improvements for the entire range of renewables, increased the renewables target considerably, introduced new sustainability criteria for bioenergy, and extended industry privileges. Flexible degression rates were also introduced, which can now be adjusted without reference to the
Bundestag The Bundestag (, "Federal Diet") is the German federal parliament. It is the only federal representative body that is directly elected by the German people. It is comparable to the United States House of Representatives or the House of Common ...
. The legislation came into force on 1January 2009. More specifically, the photovoltaic tariffs were reduced somewhat, but not enough to affect uptake. The degression for PV was tightened from 5% to 8–10%, depending on the size of installation. A new 'self-consumption incentive' granted a fixed tariff of 25.01¢/kWh for electricity consumed by a PV operator within their own house. A 'flexible degression cap' was introduced, under which the degression rate could be adjusted to keep the uptake of photovoltaics within a specified corridor. The support for onshore wind improved. The initial tariff was raised, the repowering (when old turbines are replaced by new) bonus (''Repoweringbonus'') was increased, and an additional system service bonus was granted for specified technical contributions (''Systemdienstleistungen'' or ''SDL''), including the ability to maintain voltage if the transmission grid fails. The tariff for offshore wind was raised substantially. An additional 'early starter bonus' was offered for offshore wind farms entering operation before 2015. In parallel to the EEG, a separate loan program of €5 billion was established, to be administered by the state-owned
KfW The KfW, which together with its subsidiaries DEG, KfW IPEX-Bank and FuB forms the KfW Bankengruppe ("banking group"), is a German state-owned investment and development bank, based in Frankfurt. As of 2014, it is the world's largest national d ...
bank, with the goal of reaching 25GW installed capacity for wind by 2030. Support of biomass was also increased, with special bonuses for a number of different biomass types. Biomass must also comply with specified ecological requirements to be eligible, these requirements being contained in a separate 'sustainability ordinance' (''Nachhaltigkeitsverordnung'' or ''BioSt-NachV''). The hydroelectricity tariffs were raised considerably and particularly for micro and small power plants. The tariffs for geothermal energy were raised considerably too, as was the cogeneration bonus. An additional 'early starter bonus' was introduced for geothermal projects put into operation before 2016. A 'green power privilege' (''Grünstromprivileg'') was introduced, which exempted electricity suppliers with a minimum quota of renewables from the EEG surcharge under certain circumstances. New measures allowed grid operators to temporarily limit wind turbine output in times of network congestion, with compensation payable to the plant owner for lost remuneration. The renewable targets in the new law were increased to at least 35% (previously 20%) of total electricity production by 2020, 50% by 2030, 65% by 2040, and 80% by 2050. The 2009 legislation was overseen by a CDU/ CSU/ SPD grand coalition
government A government is the system or group of people governing an organized community, generally a state. In the case of its broad associative definition, government normally consists of legislature, executive, and judiciary. Government is ...
. The government launched its national ''Energy Concept'' in September 2010. This represents a significant milestone in the development of energy policy in Germany. On 6June 2011, following
Fukushima may refer to: Japan * Fukushima Prefecture, Japanese prefecture ** Fukushima, Fukushima, capital city of Fukushima Prefecture, Japan ***Fukushima University, national university in Japan *** Fukushima Station (Fukushima) in Fukushima, Fukushim ...
, the government removed the use of nuclear power as a bridging technology as part of their policy.


PV Act (2010)

It was becoming clear that action on the photovoltaic remuneration was necessary. The growth in photovoltaics had exceeded all expectations. In 2009 alone, MWp of capacity was installed. As a result, the support costs had skyrocketed. The government responded with the PV Act (2010) which entered into force retrospectively with effect from 1July 2010. The legislation introduced a dramatic reduction in photovoltaic tariffs, cutting these between 8 and 13% depending on the installation type, followed by a second cut of 3%. The deployment corridor was doubled to between 2500 and 3500MWp, along with tighter growth-dependent degression rates of 1–12%, in addition to the ordinary degression of 9%. The self-consumption incentive was significantly raised to around 8¢/kWh and eligibility extended to systems up to 500kWp. The feed-in rate itself was dependent on the system size and the proportion of demand that was consumed on-site. Free-standing systems were excluded from using agricultural land.


PV Interim Act (2011)

The PV Interim Act (2011) introduced the possibility of further downward adjustments for the photovoltaic tariffs during the year. If the installed capacity during the first months of the year exceeded the equivalent of 3,500 MWp per year, feed-in tariffs would be lowered by 1July 2011 for rooftop systems and 1September 2011 for free-standing systems. It also modified the flexible cap to better control the growth of photovoltaics. In application of the EEG (2009) version in force at the time, no further adjustment to the feed-in tariffs occurred in 2011. This is explained because the installed capacity between 28 February 2011 and 1 June 2011 was less than 875 MWp (which multiplied by 4, is below the 3,500 MWp threshold).


Renewable Energy Sources Act (2012)

The act was again modified and came into force on 1January 2012. The new EEG sought to advance the dynamic expansion of renewable electricity generation, control the rising costs associated with the scheme, and enhance market and grid integration, while adhering to the principles of a feed-in system. The revised system includes a market premium scheme, the market premium was intended to prepare renewables for the market and to eventually lower their dependence on explicit policy measures. The rising shares of variable renewable generation had led to concerns about the ability of the electricity system to cope. The new act included measures for the grid integration of photovoltaic systems. Grid operators could now limit the feed-in of photovoltaics in times of grid overload, with the plant operators receiving compensation for their loss of revenue. A new ordinance required the retrofitting of photovoltaic systems to avoid the 50.2Hz problem – the risk of widespread blackouts as PV systems simultaneously tripped in the face of frequencies above 50.2Hz. Free-standing photovoltaic systems on nature conservation areas were excluded from remuneration. The tariff structure for onshore wind was basically maintained, but the degression was tightened from 1% to 1.5% to incentivize efficiency improvements. The system services bonus for onshore wind was extended and the repowering bonus was improved. Offshore wind gained through improved early starter provisions. The start of the degression was postponed until 2018, but increased from 5% to 7%. Starter tariffs were increased but now last 8 rather than 12years. Biomass tariffs were lowered by 10–15% on average, particularly for small systems. The biomass tariff system itself was greatly simplified, with now four size categories and two fuel categories. The degression for biomass was increased from 1% to 2%. The tariffs for hydroelectricity were simplified, the funding period now uniformly 20years, and the degression rate set at 1%. The tariffs for geothermal energy were raised and the start of the degression postponed until 2018, albeit at an increased rate. Electricity storage facilities were fully exempted from grid charges and are to be supported by a special research program. Industry privileges under the special equalisation scheme were extended to include more companies and the tariff reductions further improved. The eligibility requirements were lowered from 10GWh/a to 1GWh/a and the electricity expenses threshold in terms of gross value added lowered from 15% to 14%. As a result, the number of exempt firms rose from 734 in 2012 to about 2057 in 2013. The exempted electricity load rose from 84.7TWh to 97TWh, a relatively modest increase due to the smaller sizes of the newly exempted firms. Industrial self-consumption, previously exempted from the EEG surcharge, was now subject to the surcharge if the public grid was used, except in special circumstances. This measure was aimed at preventing abuse through contracting. The introduction of an optional market premium was designed to support demand-oriented electricity generation. The market premium is the difference between the EEG tariff and the average spot market price. An additional management premium reimbursed administration costs and mitigated against market risks. For large biogas plants over 750kW, the use of direct marketing was made compulsory from 2014 onwards. An additional flexibility premium was introduced for gas storage at biogas facilities. The details of the market premium were to be provided in a following governmental directive, following parliamentary approval. The green power privilege was also modified. Energy suppliers whose portfolio comprised more than 50% EEG-funded renewables had their surcharge reduced by 2¢/kWh, previously they had been fully exempt. In addition, a minimum share of 20% of fluctuating sources, namely wind and PV, was required. The renewables targets remained unchanged and are identical to those specified in the 2010 ''Energy Concept''. In 2013, after numerous complaints, the
European Commission The European Commission (EC) is the executive of the European Union (EU). It operates as a cabinet government, with 27 members of the Commission (informally known as "Commissioners") headed by a President. It includes an administrative body ...
opened an in-depth state aid investigation into the EEG surcharge exemptions for energy-intensive companies and into the green power privilege. The Commission nonetheless accepted that the underlying feed-in tariff and market premium schemes were compliment. On 10May 2016 the EU General Court sided with the Commission and determined that the EEG (2012) involved state aid as indicated. (The next EEG (2014) was specifically designed to resolve these difficulties.) The 2012 legislation was overseen by a CDU/ CSU/ FDP coalition
government A government is the system or group of people governing an organized community, generally a state. In the case of its broad associative definition, government normally consists of legislature, executive, and judiciary. Government is ...
.


PV Act (2013)

Despite the cutbacks in photovoltaic support, photovoltaic installations continued to boom. In December 2011 alone, 3000MWp were added in an effort to beat the tariff reductions beginning in 2012. Moreover, the EEG surcharge had grown to 3.53¢/kWh for 2011, with the largest component being photovoltaic remuneration. The EEG surcharge was projected to grow considerably, despite the falling tariff structure. For the first time, cost control became the "determining factor" in the political debate over the EEG. This was despite the fact that the
merit order The merit order is a way of ranking available sources of energy, especially electrical generation, based on ascending order of price (which may reflect the order of their short-run marginal costs of production) and sometimes pollution, together w ...
effect had been depressing electricity spot prices. The merit order effect occurs when preferentially dispatched wind and photovoltaic generation displaces more expensive fossil fuel generation from the margin – often gas-fired combined cycle plant – thereby driving down the cleared price. This effect is more pronounced for photovoltaics because their midday peak correlates with the maximum generation requirement on the system. The merit order effect also lowers the revenues for conventional power plants and makes them less economically viable. A 2007 study finds that "in the case of the year 2006, the volume of the merit order effect exceeds the volume of the net support payments for renewable electricity generation which have to be paid by consumers". A 2013 study estimates the merit order effect of both wind and photovoltaic electricity generation for the years 2008–2012: the combined merit order effect of wind and photovoltaics ranges from 0.5¢/kWh in 2010 to more than 1.1¢/kWh in 2012. The PV Act (2013) came into force retrospectively on 1April 2012. The tariff cuts were up to 30%, with the tariff cuts scheduled in the EEG (2012) for 1July 2012 advanced and tightened from their original 15%. The system size categories were changed, now up to 10, 40, 1000, and kWp. A new category of 10–40kWp was introduced, while free-standing systems were limited to 10MWp. The regular standard degression was set to 1% per month, equal to 11.4% per year, and replacing the previous six-monthly adjustment. The flexible cap for the deployment corridor remained unchanged at 2500 to 3500MWp per year. If new additions exceed this corridor, the degression rises by 1.0% up to 2.8%. A hard cap on the total photovoltaic capacity was introduced, set at 52GWp. The self-consumption privilege was removed for new installations, as grid parity was already met: the feed-in tariff for roof systems at 19.5¢/kWh was now lower than the average electricity price for households at 23¢/kWh. Changes to the market integration model reduced the eligibility for remuneration of systems between 10 and 1000kWp to 90% of their electricity production from 2014 onwards. The residual electricity could either be self-consumed or sold on the electricity market.


Renewable Energy Sources Act (2014)

The EEG (2014) is sometimes known as the EEG2.0 due to its marked departure from earlier legislation. This revision took effect from 1August 2014. The act is available in English. The act requires operators of new plant to market their electricity themselves. In turn they receive a market premium from the grid operator to compensate for the difference between the fixed EEG payment and the average
spot price In finance, a spot contract, spot transaction, or simply spot, is a contract of buying or selling a commodity, security or currency for immediate settlement (payment and delivery) on the spot date, which is normally two business days after the ...
for electricity. The act also paved the way for a switch from specified feed-in tariffs to a system of tendering.


Purpose and aim

The purpose of the EEG (2014) is stated in the legislation: The EEG (2014) also contains statutory targets for the share of renewable energy in gross final electricity consumption (the targets are additional to those set out in the government's 2010 ''Energy Concept'' statement):


Deployment corridors

The EEG (2014) specifies binding trajectories for the following individual technologies:


Details

The level of remuneration is still prescribed under the EEG until 2017. However the way that new installations receive their remuneration has changed. Most plant operators must now directly market their output, for which they get an additional market premium payment instead of an explicit feed-in tariff. This premium is the difference between the average monthly wholesale price at the EEX energy exchange and the fixed remuneration stated in the EEG. Installations under 100kW are exempt from these provisions and existing installations will continue to operate under the rules under which they were established. From 2014 to 2017 onwards, defined remuneration rates will be replaced by competitive bidding, also known as auctions or tenders. Those investors offering the lowest prices will then receive support. The new act does not specify the auction model in detail, but potential designs were piloted in 2015 using ground-mounted photovoltaic systems. The flexible cap mechanism for expansion corridors was replaced with set annual targets for the addition of wind, photovoltaic, and biogas capacity. The government hopes these new corridors will lead to a better coordination between renewables and the use and expansion of the transmission network, as well as improving planning security for conventional generators. The target corridor for photovoltaics is set at 2.4 to 2.6GWp per year and the hard cap of 52GWp (introduced in 2013) remains in place. Photovoltaic installations beyond this upper bound will not receive funding under the EEG. The remuneration for photovolatic installations is reduced 0.50 percent every month, unless the installed capacity in the preceding months is below or above the installed capacity target. The degression rate can increase or decrease according to the deviation from the 2,500 MWp goal during the twelve months prior to the beginning of each quarter. The corresponding degression rate is then used during the three months of the quarter, in the following way: * If installed capacity exceeds the target by more than 4,900 MWp, feed-in tariff decreases 2.80 percent ** by more than 3,900 MWp, 2.50 percent, ** by more than 2,900 MWp, 2.20 percent, ** by more than 1,900 MWp, 1.80 percent, ** by more than 900 MWp, 1.40 percent, ** by up to 900 MWp, 1.00 percent. * If installed capacity falls between 2,400 and 2,600 MWp, the feed-in tariff decreases 0.50 percent. * If installed capacity is below the target by less than 900 MWp, feed-in tariff decreases 0.25 percent ** by more than 900 MWp, the feed-in tariff remains the same, ** by more than 1,400 MWp, to zero; the feed-in tariff may rise on a one-off basis by 1.50 percent on the first calendar day of the respective quarter. Onshore wind retained its annual target of 2.4 to 2.6GW. However the target now excludes repowering, effectively extending the growth cap. The management premium and the bonus paid to wind farms providing stabilizing features (''Systemdienstleistungen'') are now being phased out. From 2016 onwards, the onshore wind tariff is reduced quarterly, depending on whether new capacity tracks the prescribed target. For offshore wind, the new act defines a target of 6.5GW by 2020 and 15GW by 2030. Offshore wind farms that entered service before 2020 can choose between a fixed payment for 8 years or a reduced payment for 12 years. After this period, the basic reward is reduced still further, depending on the distance from shore and the depth of the sea. The biomass target is set at 0.1GW per year. Only biogas plants that use biowaste and liquid manure will receive more than the standard remuneration, depending on their capacity. Tariffs are to be reduced by 0.5% on a three-monthly basis for new installations. On 16April 2014 the European Commission found that EEG (2014) support for 20 offshore wind farms totalling almost 7GW was not state aid. On 23July 2014 the
European Commission The European Commission (EC) is the executive of the European Union (EU). It operates as a cabinet government, with 27 members of the Commission (informally known as "Commissioners") headed by a President. It includes an administrative body ...
approved the EEG (2014), having assessed it to be in line with EU rules on state aid. Indeed, the EEG (2014) was the first revision of the Renewable Energy Sources Act to be "materially shaped by the Commission's view on state aid". In July 2015 the Economics and Energy Ministry (BMWi) released a design document covering renewables auctions. In early 2016 the BMWi reported that the ground-mounted photovoltaics tender pilot, comprising three auction in 2015, was successful. The BMWi also stated that the competition was high and that prices fell from round to round. It added that small bidders were able to win tenders. These results will be used to develop auctions for other renewable electricity generation technologies. The sixth and last round of PV auctions under this particular legislation produced 27successful bids totaling . The average successful price was and the lowest awarded price was . These figures confirm a falling trend from auction to auction. The 2014 legislation was overseen by a CDU/ CSU/ SPD grand coalition
government A government is the system or group of people governing an organized community, generally a state. In the case of its broad associative definition, government normally consists of legislature, executive, and judiciary. Government is ...
.


Renewable Energy Sources Act (2017)

The government began again to update of the EEG, first dubbed the EEG (2016), now the EEG (2017). The revised act is slated to take effect from 1January 2017. The following explains some of the process prior to the final legislation. On 8December 2015 the government released its proposals for reform. On 8June 2016 the Federal Cabinet (''Bundeskabinett'') cleared the draft EEG (2016) bill. That bill will now go to the
Bundestag The Bundestag (, "Federal Diet") is the German federal parliament. It is the only federal representative body that is directly elected by the German people. It is comparable to the United States House of Representatives or the House of Common ...
and Bundesrat for consideration. The reform is being driven by three guiding principles, namely the need: * "to keep within agreed deployment corridors for the development of renewable energy" * "to keep to a minimum the overall cost arising from the Renewable Energy Sources Act" * "to use auctions to create a level playing field for all of the players involved" The government believes that the new auction system will control costs. The new system also accords with the desire of the European Commission for renewables support to be market-based. With regard to wind energy, the new rules are intended to encourage installations in sites with strong winds and across Germany. To this end, a suite of complex calculations (''Referenzertragsmodell'') are being developed to ensure that bids are comparable and payments are fair. The proposed EEG (2016) is a continuation of the EEG (2014). It replaces prescribed feed-in tariffs with an auction system for the majority of renewable technologies. It repeats the deployment corridors specified in the EEG (2014) to control the uptake of renewable electricity over the next decade and to ensure that future renewable energy targets are honored. This corridor will be maintained by auctioning only a defined capacity each year. Only those renewables projects that bid successfully will receive EEG support for the electricity they supply over the following 20years. Each technology – photovoltaics, onshore wind, offshore wind, and biomass – will get an auction design tailored to its needs. Small renewables installations of under 750kW capacity or under 150kW for biomass will not be required to tender and will continue to receive conventional feed-in tariffs. Bidders from other European countries will be able to compete in the auctions for up to 5% of the annual capacity, under certain conditions. The new auction system should cover more than 80% of the new renewable electricity capacity. As indicated above, the auction system was piloted in 2015 for ground-mounted photovoltaic facilities. As a result of this trial, the Economics and Energy Ministry (BMWi) abandoned ' uniform pricing' in favor of ' pay-as-bid'. The Federal Network Agency (''Bundesnetzagentur'') will call for tenders for renewable projects and set the capacity to correspond to the trajectory needed for a 40–45% share in 2025. Starting in 2017, there will be between three and four auctions per year for photovoltaics and onshore wind. Participants will submit single sealed bids and will have to provide a substantial security deposit to ensure good faith. Bids are tied to projects and locations and cannot normally be transferred. The lowest bids will win until the capacity under auction is met. A ceiling price is to be notified in advance. Successful projects will receive the funding rate with which they won for a period of 20years. Special rules apply for citizen energy projects: small projects are exempt from the auction system altogether and larger projects will receive the highest offer accepted in their round rather than their own possibly lower bid. Onshore wind investors will also have to get prior approval for their projects under the Federal Immission Control Act (''Bundes-Immissionsschutzgesetzes'' or ''BlmSchG''), the federal law regulating the harmful effects of air pollution, noise, vibration and similar phenomena. Citizens cooperatives (''Genossenschaft'') participating in wind energy tenders have special dispensations. Wind energy auctions will be held more often in the beginning, with three in 2017 and four in 2018, in order to quickly establish a price level. The annual capacity for onshore wind farms will be set at 2.8GW per year for 2017 to 2019 and at 2.9GW thereafter. In order to better synchronise the development of the grid with renewables growth, the addition of onshore wind will be restricted to specified 'grid congestion zones' where high inputs of renewable electricity cannot be accepted because of network congestion. These areas are to be identified by the Federal Network Agency. The new rules on funding offshore wind farms will apply to those projects that commence operation in 2021 or later. From 2025, the government will specify the sites for future wind farms and investors will then compete for the right to build at those locations. This centralised (Danish) model is designed to ensure competition and to make project approvals, site planning, and network connections more cost effective and better integrated. Between 2021 and 2024 a transitional auction model will be used and wind farms that have been planned and approved but not built will compete in two rounds of tenders for a restricted amount of capacity. Offshore wind will remain capped at 15GW by 2030 and the capacity auctioned each year will be consistent with this target. In 2021, only wind farms in the Baltic Sea will be considered, due to a shortage of network connections at the North Sea. Biomass projects will also participate in the new auction system. Biomass capacity is to be expanded by 150MW annually in the next three years and by 200MW annually for the following three years. Installations with a capacity greater than 150kW will also be able to tender. Biomass facilities will only receive remuneration for half their runtime in order to incentivize their use during times of high electricity prices. Hydroelectricity, geothermal, and mine, landfill, and sewage gas are excluded from the auction system because of the prospect of insufficient competition. On 20December 2016, the European Commission found that the EEG amendments are in line with EU rules governing state aid, thereby allowing the planned introduction on 1January 2017 to be honored. This round of legislation is being overseen by a CDU/ CSU/ SPD grand coalition
government A government is the system or group of people governing an organized community, generally a state. In the case of its broad associative definition, government normally consists of legislature, executive, and judiciary. Government is ...
.


Reactions

In January 2016, in response to the official proposals, Greenpeace Germany cautioned that a complete overhaul of the successful EEG would endanger climate protection targets. The German Wind Energy Association (BWE) and others are calling for a 2.5GW net capacity addition for onshore wind energy per annum that is not dependent on the increase of offshore wind. They also say that the 40–45% renewables target by 2025 should not be treated as a fixed ceiling. The German Engineering Federation (VDMA) said that "the EEG amendment gives rise to growing uncertainty in the industry" and that "it is however not right to regulate the expansion of renewable energy production by controlling the tendering volume for onshore wind energy and inflexibly clinging on to a 45% target in the electricity sector". Estimates for 2012 suggest that almost half the renewable energy capacity in Germany is owned by citizens through energy cooperatives (''Genossenschaft'') and private installations. Critics worry that the new rules will preclude citizen participation, despite the special provisions for cooperatives and individuals. Preparing tenders is expensive (costing perhaps €50,000–100,000) and that expenditure is sunk if the bid fails. In January 2016
Greenpeace Energy Green Planet Energy (formerly named Greenpeace Energy) is a German electric utility in the form of a registered association. The stated goal of the cooperative is the provision of environmentally friendly energy to the electrical grid. As a foun ...
said that renewables auctions would make the ''Energiewende'' less fair and that citizen cooperatives and small investors would be at a disadvantage. Germanwatch, WWF-Germany, and Deutsche Umwelthilfe (DUH), three German
NGOs A non-governmental organization (NGO) or non-governmental organisation (see spelling differences) is an organization that generally is formed independent from government. They are typically nonprofit entities, and many of them are active in ...
, said the proposed reforms do not properly account for small, citizen-owned renewables projects. Citizen participation is seen as a key reason for the widespread public acceptance of renewable technologies in Germany. That support may lag if the EEG reforms favor large companies over cooperatives and individuals.


Political positions ahead of 2017 elections

In November 2016, the CDU revealed that it is considering scrapping the EEG, although it remains undecided as to whether it will make this an election issue for 2017.


2019 European Court of Justice state aid ruling

In March 2019, the European Court of Justice ruled that feedin tariffs do not class as state aid, admissible or otherwise. This landmark decision annuls an earlier Commission decision that the German renewable energy law of 2012 involved state aid. More specifically, the ECJ found that the Commission had failed to establish that the advantages provided by feedin tariffs involved state resources and therefore constituted state aid.


Feed-in tariffs

The structure and development of feed-in tariffs over the course of the EEG is a complex topic. This section is simply intended to give an indication. The feed-in tariffs for all technologies applicable are listed here. The following
table Table may refer to: * Table (furniture), a piece of furniture with a flat surface and one or more legs * Table (landform), a flat area of land * Table (information), a data arrangement with rows and columns * Table (database), how the table data ...
summarizes onshore wind energy remunerations from April 2000 to October 2016. The
table Table may refer to: * Table (furniture), a piece of furniture with a flat surface and one or more legs * Table (landform), a flat area of land * Table (information), a data arrangement with rows and columns * Table (database), how the table data ...
below summarizes photovoltaics remunerations from August 2004 to January 2012. , under the EEG mandate, the Federal Network Agency (''Bundesnetzagentur'') publishes the currently installed PV capacity with adjusted feed-in tariffs monthly as a downloadable
spreadsheet A spreadsheet is a computer application for computation, organization, analysis and storage of data in tabular form. Spreadsheets were developed as computerized analogs of paper accounting worksheets. The program operates on data entered in c ...
. Otherwise, for data beyond January 2012, please see: feed-in tariffs in Germany.


Politics

The development of the EEG has been the subject of
political science Political science is the scientific study of politics. It is a social science dealing with systems of governance and power, and the analysis of political activities, political thought, political behavior, and associated constitutions and la ...
analysis. A 2006 study finds that "the regulatory framework is formed in a 'battle over institutions' where the German parliament, informed and supported by an advocacy coalition of growing strength, backed support policies for renewables sourced electricity against often reluctant governments and the opposition from nuclear and coal interests". A 2016 thesis finds that two broad coalition of actors faced each other off over the development of the EEG legislation: an 'economic coalition' that opposed support for renewables and sought to protect nuclear power and fossil fuel interests and an 'environmental coalition' that took the opposite stance. The economic coalition wanted unassisted market competition to prevail and preferred large-scale facilities. The environmental coalition comprised environmental organizations, the renewables industry, farmers, the metal workers unions ( IGBCE and
IG Metall IG Metall (; IGM; German: ''Industriegewerkschaft Metall'', "Industrial Union of Metalworkers'") is the dominant metalworkers' union in Germany, making it the country's largest union as well as Europe's largest industrial union. Analysts of Ge ...
), a German engineering association (
VDMA The VDMA (Mechanical Engineering Industry Association) represents about 3,500 German and European companies of the mechanical engineering industry. The industry stands for innovation, export orientation and medium-sized businesses. The companies ...
), partly the German Confederation of Skilled Crafts (ZDH), and some industrial corporations with renewables interests. When the EEG was proposed in the late-1990s, the incumbent energy companies markedly underestimated the technological potential of renewables, believing them to be suitable only for niche roles. They were not alone, almost all politicians and scientists of the time did so too. The opposition to the EEG was therefore muted. Concurrent lobbying over the nuclear phase-out (''Atomausstieg'') also diverted industry attention away from the EEG negotiations. Notwithstanding, the success of the EEG can be traced a small dedicated group of parliamentarians who forged an alliance between various business groups, unions, environmental
NGO A non-governmental organization (NGO) or non-governmental organisation (see spelling differences) is an organization that generally is formed independent from government. They are typically nonprofit entities, and many of them are active in h ...
s, and other idealistic interest groups. Yet despite expectations, renewable generation came to account for 27.4% of gross electricity consumption in 2014 and seriously threatened the business model of the incumbents. As history shows, the environmental coalition prevailed till 2014 at least, underpinning the development of the EEG legislation, the nuclear phase-out, and the German '' Energiewende'' more generally. Greenpeace Germany believes that ongoing EU/ US
TTIP The Transatlantic Trade and Investment Partnership (TTIP) was a proposed trade agreement between the European Union and the United States, with the aim of promoting trade and multilateral economic growth. According to Karel de Gucht, European ...
trade agreement A trade agreement (also known as trade pact) is a wide-ranging taxes, tariff and trade treaty that often includes investment guarantees. It exists when two or more countries agree on terms that help them trade with each other. The most common tr ...
negotiations Site contains April 2016 version. have influenced the EEG (2014) onwards. Earlier versions of the EEG could be interpreted as inhibiting free trade and that granting renewable energy preferential dispatch may still be illegal under the proposed treaty.


Effectiveness

Between 2015 and 2017, the fixed
feed-in tariff A feed-in tariff (FIT, FiT, standard offer contract,Couture, T., Cory, K., Kreycik, C., Williams, E., (2010)Policymaker's Guide to Feed-in Tariff Policy Design National Renewable Energy Laboratory, U.S. Dept. of Energy advanced renewable tariff, ...
scheme, introduced in 1991, is being phased out for around 80% of installations in favor of an
auction An auction is usually a process of buying and selling goods or services by offering them up for bids, taking bids, and then selling the item to the highest bidder or buying the item from the lowest bidder. Some exceptions to this definition ex ...
system. This change is defined under the EEG (2014) and subsequent legislation.


Feed-in tariff scheme (pre-2015–2017)

Various studies have found that a fixed feed-in tariff scheme provides financial certainty and is more cost effective and less bureaucratic than other forms of support, including investment or production tax credits, quota-based renewable portfolio standards (RPS), and auction mechanisms. In 2008 the
European Commission The European Commission (EC) is the executive of the European Union (EU). It operates as a cabinet government, with 27 members of the Commission (informally known as "Commissioners") headed by a President. It includes an administrative body ...
concluded that (although in 2014 it reversed its position to favor market-based instruments): When the avoided
external cost In economics, an externality or external cost is an indirect cost or benefit to an uninvolved third party that arises as an effect of another party's (or parties') activity. Externalities can be considered as unpriced goods involved in either co ...
s are compared to the compensation that renewable energy operators were paid for electricity from renewable energy, a 2003 study finds that the reduced environmental impacts and related economic benefits far outweigh the additional costs required to compensate the producers of electricity from renewable sources. Accounting for the external costs of fossil fuel use and thus "level ngthe playing field" had been one of the key purposes when constructing the original EEG. A feed-in tariff scheme generates more competition, more jobs, and more rapid deployment for manufacturing and does not require the picking of technological winners, such as between
wind power Wind power or wind energy is mostly the use of wind turbines to generate electricity. Wind power is a popular, sustainable, renewable energy source that has a much smaller impact on the environment than burning fossil fuels. Historically ...
and photovoltaics. Denmark and Germany have been at the forefront of FIT scheme development. A 2008 economics study by RWI Essen was hugely critical of the high levels of feed-in support afforded photovoltaics. The study argues that the 2005
European Union Emission Trading Scheme The European Union Emissions Trading System (EU ETS) is a "cap and trade" scheme where a limit is placed on the right to emit specified pollutants over an area and companies can trade emission rights within that area. It covers around 45% of th ...
(EU ETS) was sufficient to drive the transition towards a
low-carbon economy A low-carbon economy (LCE) or decarbonised economy is an economy based on energy sources that produce low levels of greenhouse gas (GHG) emissions. GHG emissions due to human activity are the dominant cause of observed climate change since the mi ...
, that the EEG does nothing intrinsic to reduce
greenhouse gas emissions Greenhouse gas emissions from human activities strengthen the greenhouse effect, contributing to climate change. Most is carbon dioxide from burning fossil fuels: coal, oil, and natural gas. The largest emitters include coal in China and ...
, and that the electricity produced represents one of the most expensive greenhouse gas abatement options on offer.


Auction system (post-2015–2017)

In June 2016 economist Claudia Kemfert from DIW Berlin contended that the new auction system, introduced with the EEG (2014) and being refined under the proposed EEG (2016), will not reduce costs, but will rather undermine planning security and increase the risk premium applied by investors. In addition, the auction system will lead to deployment corridors being missed as companies holding tenders delay construction for whatever reason.


General

The positive impact on the environment ''globally'' is less clear.
Hans-Werner Sinn Hans-Werner Sinn (born 7 March 1948) is a German economist who served as President of the Ifo Institute for Economic Research from 1999 to 2016. He currently serves on the German economy ministry’s advisory council. He is Professor Emeritus ...
, a German economist and chair of the Ifo Institut für Wirtschaftsforschung argues that Germany's renewable energy support reduces world market prices for fossil energy. Thus, countries like China or the US have an incentive to produce more, and the net effect on the climate is zero. This effect is known as the green paradox.


Outlook


Grid reinforcement

One challenge that lies ahead is integrating the electricity generated by decentralized renewable energy into the existing electricity grid structure. The grid was built to suit the centralized energy system of the then four main energy companies, namely, E.ON,
EnBW EnBW Energie Baden-Württemberg AG, or simply EnBW, is a publicly-traded energy company headquartered in Karlsruhe, Germany. As its name indicates, EnBW is based in the German state of Baden-Württemberg. History Foundation and development ...
, RWE, and Vattenfall. The need for grid reinforcement from north to south is commonly recognized. In response, the four TSOs proposed 92 expansion projects covering 7300km of lines, but not all will be required or approved. In 2015 the Federal Network Agency (''Bundesnetzagentur'') released its report on grid expansion plans covering the next decade. Rapid development of the grid is being driven by the uptake of renewables and the phase-out of nuclear power. But not all experts agree that a substantial build-out of the grid is necessary. Claudia Kemfert believes the large amount of coal-fired generation on the system is part of the problem. Kemfert said "our studies and models show that grid extension does no harm, but it's not strictly necessary decentralised, intelligent grids with demand management and, in the medium term, storage, would be much more important." Analysis for Greenpeace Germany in 2016 also suggests that it is inflexible coal and nuclear plants that are clogging the grid and driving up wholesale electricity prices.


Deployment corridors

The EEG (2014) specifies technology-specific deployment corridors (see
table Table may refer to: * Table (furniture), a piece of furniture with a flat surface and one or more legs * Table (landform), a flat area of land * Table (information), a data arrangement with rows and columns * Table (database), how the table data ...
) which will be tracked by the new auction system. Environmental NGOs and renewable energy advocates argue that these corridors are insufficient to meet Germany's climate protection goals. Greenpeace Germany observes "to reduce renewables to 45% in 2025 means expanding the fossil
uel UEL can refer to: * UEFA Europa League, the second tier of European club football * United Envirotech, a company based in Singapore * University of East London, a public University in London, UK * ''Universidade Estadual de Londrina'' ( State Univ ...
share to 55%, with the aim of mitigating the impact on large utilities". Patrick Graichen from the Berlin energy policy institute
Agora Energiewende Agora Energiewende is a think tank supporting the ''Energiewende'' in Germany. It is funded by and the European Climate Foundation. Its members debate under the Chatham House Rule and include Klaus Töpfer, Ottmar Edenhofer, and Claude Turmes ...
agrees that the deployment corridors are set too low to reach renewables targets beyond 2025. A 2016 report by Volker Quaschning of
HTW Berlin Hochschule für Technik und Wirtschaft (''University of Applied Sciences for Engineering and Economics'') or HTW Berlin in Berlin, Germany is the largest public University of Applied Sciences in Berlin and Eastern Germany. It has over 13,000 stud ...
concludes that Germany will need to accelerate its renewables uptake by a factor of four or five to reach the lower 2015 Paris Agreement global warming target of 1.5°C. Moreover, this target will require the energy sector to be carbon free by 2040. Give the likely electrification of the transport and heating sectors, the deployment corridors laid out in the EEG (2014) are wholly inadequate. Onshore wind generation should instead grow by 6.3GW net per year (2.8GW is specified) and photovoltaics by 15GWp (2.5GWp is specified).


Economic aspects

A 2011 paper from DIW Berlin modeled the deployment of various renewable energy technologies until 2030 and quantified the associated economic effects. The uptake of renewable energy simultaneously creates business opportunities and imposes social costs for promotion. The study reveals that the continued expansion of renewable energy in Germany should benefit both economic growth and employment in the mid-term. The Berlin energy policy institute Agora Energiewende predicts that the EEG surcharge will peak around 2023 and then decline. The reasons being that expensive projects committed at the beginning of the EEG in 2000 will begin to expire after their 20years of support, that new projects are now much cheaper, and that the trend of reducing generation cost will continue.


Energy sector transformation

In November 2016,
Agora Energiewende Agora Energiewende is a think tank supporting the ''Energiewende'' in Germany. It is funded by and the European Climate Foundation. Its members debate under the Chatham House Rule and include Klaus Töpfer, Ottmar Edenhofer, and Claude Turmes ...
reported on the new and several other related new laws. It concludes that this new legislation will bring "fundamental changes" for large sections of the energy industry, but have limited impact on the economy and on consumers.


See also

* Electric power transmission *
Electricity sector in Germany Germany's electrical grid is part of the Synchronous grid of Continental Europe. In 2020, due to COVID-19 conditions and strong winds, Germany produced 484 TW⋅h of electricity of which over 50% was from renewable energy sources, 24% fro ...
* Energiewende in Germany * Energy in Germany *
Energy law Energy laws govern the use and taxation of energy, both renewable and non-renewable. These laws are the primary authorities (such as caselaw, statutes, rules, regulations and edicts) related to energy. In contrast, energy policy refers to th ...
* Energy policy * Feed-in tariffs in Germany * Financial incentives for photovoltaics *
German Climate Action Plan 2050 The German Climate Action Plan 2050 (german: Klimaschutzplan 2050) is a climate protection policy document approved by the German government on 14November 2016. The plan outlines measures by which Germany can meet its various national greenh ...
* Germany National Renewable Energy Action Plan * Green paradox * Power-to-X * Renewable energy in Germany *
Renewable energy law Renewable energy law is a particular kind of energy law, and relates primarily to the transactional legal and policy issues that surround the development, implementation, and commercialization of renewable sources of energy, such as solar, wind, ...
*
Solar power in Germany Solar power in Germany consists almost exclusively of photovoltaics (PV) and accounted for an estimated 8.2 percent of the country's gross-electricity generation in 2019. About 1.5 million photovoltaic systems were installed around the count ...
*
Vehicle-to-grid Vehicle-to-grid (V2G), also known as Vehicle-to-home (V2H) or Vehicle-to-load (V2L) describes a system in which plug-in electric vehicles (PEV) sell demand response services to the grid. Demand services are either delivering electricity or by red ...
*
Wind power in Germany Wind power in Germany is a growing industry. The installed capacity was 55.6 gigawatts (GW) at the end of 2017, with 5.2 GW from offshore installations. In 2019, a quarter of the country's total electricity was generated using wind ...
*
World energy consumption World energy supply and consumption is global production and preparation of fuel, generation of electricity, energy transport, and energy consumption. It is a basic part of economic activity. It includes heat, but not energy from food. This art ...


Notes


References


Further reading


Renewable Energy Sources Act (2000) text
(in English)
Renewable Energy Sources Act (2014) text
(in English)
2016 Revision amending the Renewable Energy Sources Act — Key points


External links


Clean Energy Wire (CLEW)
a news service covering the energy transition in Germany

hosted by the Federal Ministry for Economic Affairs and Energy (BMWi)
German Energy Blog
a legal blog covering the ''Energiewende''
German Energy Transition
a comprehensive website maintained by the
Heinrich Böll Foundation The Heinrich Böll Foundation (german: Heinrich-Böll-Stiftung e.V., HBS) is a German, legally independent political foundation. Affiliated with the German Green Party, it was founded in 1997 when three predecessors merged. The foundation was n ...

REN21
the global renewable energy policy multi-stakeholder network {{Energy in Germany Energy economics Energy law Feed-in tariffs Law of Germany Renewable energy certification Renewable energy economy Renewable energy in Germany Renewable energy law Renewable energy policy Resource economics