Dogger Bank Wind Farm is a group of offshore
wind farm A wind farm or wind park, also called a wind power station or wind power plant, is a group of wind turbines in the same location used to produce electricity. Wind farms vary in size from a small number of turbines to several hundred wind turb ...
s under construction off the east coast of
Yorkshire Yorkshire ( ; abbreviated Yorks), formally known as the County of York, is a historic county in northern England and by far the largest in the United Kingdom. Because of its large area in comparison with other English counties, functions have ...
, England in the
North Sea The North Sea lies between Great Britain, Norway, Denmark, Germany, the Netherlands and Belgium. An epeiric sea, epeiric sea on the European continental shelf, it connects to the Atlantic Ocean through the English Channel in the south and the ...
. It was developed by the Forewind consortium, while three phases were envisioned - first phase (Creyke Beck A and B), second phase (Teesside A and B) and third phase (Teesside C and D). In 2015 the third phase was abandoned, while first and second phase was granted consent. It is expected that the Dogger Bank development will consist of four offshore wind farms, each with a capacity of up to 1.2  GW, creating a combined capacity of 4.8 GW. Since 2017 Creyke Beck A and B and Teesside A are developed by Dogger Bank Wind Farm Limited as Dogger Bank A, B and C'','' while Teesside B is developed by Sofia Offshore Wind Farm Limited as Sofia Offshore Wind Farm. All four farms were successful in the 2019 contract for difference auction and have a delivery date between 2023 and 2025.


Project overview

Dogger Bank is in the
North Sea The North Sea lies between Great Britain, Norway, Denmark, Germany, the Netherlands and Belgium. An epeiric sea, epeiric sea on the European continental shelf, it connects to the Atlantic Ocean through the English Channel in the south and the ...
, located between off the east coast of Yorkshire. It is one of nine offshore zones belonging to the
Crown Estate The Crown Estate is a collection of lands and holdings in the United Kingdom belonging to the British monarch as a corporation sole, making it "the sovereign's public estate", which is neither government property nor part of the monarch's priv ...
which formed part of the third licence round for UK offshore wind farms. The Dogger Bank is an attractive location for offshore wind farms because it is far away from shore, avoiding complaints about the visual impact of wind turbines, yet the water depth is shallow enough for traditional fixed foundation wind turbine designs. Fixed-foundation wind turbines are economically limited to maximum water depths of , at greater water depths new
floating wind turbine A floating wind turbine is an offshore wind turbine mounted on a floating structure that allows the turbine to generate electricity in water depths where fixed-foundation turbines are not feasible. Floating wind farms have the potential to signi ...
designs are required, which currently cost significantly more to build. The Forewind consortium was formed by the four owner companies – SSE, RWE, Statoil and Statkraft – in November 2008 in response to the third licence round. In January 2010, Forewind was announced as the developer for the Dogger Bank Zone, the largest of the Round 3 zones. Statoil increases its share from Statkraft, beginning in 2017. In August 2017 new ownership arrangements were announced, SSE and
Equinor Equinor ASA (formerly Statoil and StatoilHydro) is a Norwegian state-owned multinational energy company headquartered in Stavanger. It is primarily a petroleum company, operating in 36 countries with additional investments in renewable energy. I ...
(formerly Statoil) have each taken 50% share in Dogger Bank Creyke Beck A, B and Teesside A, while Innogy (RWE subsidiary) has taken Teesside B and renamed it to Sofia Offshore Wind Farm. Originally projected to produce up to 9 GW of power, the plan was scaled down to 7.2 GW in 2014, and scaled down even further to 4.8 GW in 2015. Some of the steel used is from
Port Talbot Steelworks Port Talbot Steelworks is an integrated steel production plant in Port Talbot, West Glamorgan, Wales, capable of producing nearly 5 million tonnes of steel slab per annum. This makes it the larger of the two major steel plants in the UK and one o ...
. In 2022 it was announced that the Dogger Bank A, B & C wind farms would be expanded to add an additional wind farm Dogger Bank D. Additionally the Crown Estate leased out a 3GW zone named Dogger Bank South.


Wind Farm Project - Final Design and Construction

As of November 2022 there are four zones in the Dogger Bank Wind Farm project that are either in the pre-constuction or full construction phase. They are Dogger Bank A, B & C as well as Sophia. Dogger Bank A and B The first phase was called Dogger Bank Creyke Beck A and B. The original plan called for two offshore wind farms each generating up to 1.2 GW of electricity, with a total installed capacity of up to 2.4 GW. They would connect to the existing Creyke Beck substation near Cottingham, in the
East Riding of Yorkshire The East Riding of Yorkshire, or simply East Riding or East Yorkshire, is a ceremonial county and unitary authority area in the Yorkshire and the Humber region of England. It borders North Yorkshire to the north and west, South Yorkshire to t ...
. The two sites lie from the East Yorkshire coast. Dogger Bank Creyke Beck A will cover an area of , and Dogger Bank Creyke Beck B will cover an area of . Planning consent was granted for up to 400 turbines on 17 February 2015. These two projects were owned by SSE and
Equinor Equinor ASA (formerly Statoil and StatoilHydro) is a Norwegian state-owned multinational energy company headquartered in Stavanger. It is primarily a petroleum company, operating in 36 countries with additional investments in renewable energy. I ...
, in December 2020 Eni acquired 20% stake.
ABB ABB Ltd. is a Swedish- Swiss multinational corporation headquartered in Zürich, Switzerland. The company was formed in 1988 when Sweden's Allmänna Svenska Elektriska Aktiebolaget (ASEA) and Switzerland's Brown, Boveri & Cie merged to crea ...
was chosen for the
HVDC A high-voltage direct current (HVDC) electric power transmission system (also called a power superhighway or an electrical superhighway) uses direct current (DC) for electric power transmission, in contrast with the more common alternating curre ...
power transfer cables to shore. On 21 September 2020, it was announced that Dogger Bank A and B will use 190 GE Haliade-X 13 MW offshore wind turbines over both sites, meaning that 95 turbines will be used on each site. The availability of upgraded Haliade-X turbines rated at 13 MW rather than 12 MW means that each site will be capable of generating up to 1.235 GW, for a total of 2.47 GW. Turbines will be pre-assembled at Able Seaton Port in Hartlepool, an activity that will lead to the creation of 120 skilled jobs at the port during construction. Turbine installation is expected to commence in 2023 at Dogger Bank A.
Power Purchase Agreement A power purchase agreement (PPA), or electricity power agreement, is a contract between two parties, one which generates electricity (the seller) and one which is looking to purchase electricity (the buyer). The PPA defines all of the commercial te ...
s (PPA) for 15 years were signed in November 2020. Offshore cable laying started in April 2022. Installation of the turbine foundations was started in July 2022. Dogger Bank C Dogger Bank C will use GE Haliade 14 MW turbines. Installation of the turbines is set to begin in 2025 with completion of the overall project in 2026. Similar to Dogger Bank A&B, a 15-year Power Purchase Agreement was agreed in November 2021. All output (estimated at 18 TWh/year) from A, B and C were thus in contract, a stepping stone towards financing. As a first for UK offshore wind, Dogger Bank C onshore converter station was among the winners of an auction to provide the cheapest options for reactive power to stabilize the grid and reduce grid cost. The converter will provide up to 200 megavolt amperes with a price of 0.34 £/MVAr/SP from April 2025 and ten years on.


Sofia

Sofia will use 100
Siemens Gamesa Siemens Gamesa Renewable Energy S.A., formerly Gamesa Corporación Tecnológica S.A. () and Grupo Auxiliar Metalúrgico S.A., is a Spanish-German wind engineering company based in Zamudio, Biscay, Spain. In Spain, the company has two other main ...
14MW turbines. Offshore construction is set to begin in 2023 with completion of the overall project in 2026.


Wind Farm Project - Additional Zones

Dogger Bank D SSE Renewables and
Equinor Equinor ASA (formerly Statoil and StatoilHydro) is a Norwegian state-owned multinational energy company headquartered in Stavanger. It is primarily a petroleum company, operating in 36 countries with additional investments in renewable energy. I ...
reviewing the potential to increase the size of the Dogger Bank Wind Farm, which is currently under construction. This additional phase will be known as Dogger Bank D. The grid has the capability to support up to 1320MW. Dogger Bank South RWE is now moving forward with two new offshore wind farms in the Dogger Bank area. Each will have a capacity of 1.5 GW generation. Following the Round 4 leasing process, RWE obtained approval from the UK Secretary of State for Business, Energy and Industrial Strategy (BEIS) to enter into an Agreement for Lease with The Crown Estate in summer 2022. .


Dogger Bank Teesside

This section provides the historical context for the development of the Dogger Bank Wind Farm and the various name and design changes that have occurred since it was first proposed. Dogger Bank Teesside were intended to be the second and third stage of development of the Dogger Bank Zone. It was divided into two phases of development: Dogger Bank Teesside A & B and Dogger Bank Teesside C & D. These would connect to the National Grid at a substation in Redcar & Cleveland, Teesside.


Dogger Bank Teesside A & B (Dogger Bank C and Sofia Offshore Wind Farm)

Dogger Bank Teesside A & B comprised two wind farms, each generating up to 1.2 GW of electricity. Dogger Bank Teesside A lies from the shore and will cover an area of . Dogger Bank Teesside B lies from the shore and will cover an area of . Planning consent was granted for 400 turbines on 5 August 2015. Since 2017 SSE and Equinor own Dogger Bank Teesside A (renamed to Dogger Bank C), while Dogger Bank Teesside B was taken by Innogy and renamed Sofia Offshore Wind Farm.


Dogger Bank Teesside C & D

This second application (C and D) was planned to comprise two wind farms, each generating up to 1.2 GW of electricity. It was originally expected that planning consent would be determined in 2017. However, in August 2015 Forewind scrapped the final phase and returned the remaining area of the Dogger Bank development zone to the
Crown Estate The Crown Estate is a collection of lands and holdings in the United Kingdom belonging to the British monarch as a corporation sole, making it "the sovereign's public estate", which is neither government property nor part of the monarch's priv ...
.


North Sea Wind Power Hub

Dutch, German, and Danish electrical grid operators are cooperating in a project to build a North Sea Wind Power Hub complex on one or more artificial islands to be constructed on Dogger Bank as part of a European system for sustainable electricity. The power hub would interconnect the three national power grids with each other and with the Dogger Bank Wind Farm. A study commissioned by Dutch electrical grid operator TenneT reported in February 2017 that as much as 110 gigawatts of wind energy generating capacity could ultimately be developed at the Dogger Bank location. At the North Seas Energy Forum in Brussels on 23 March 2017, Energinet will sign a contract to work with the German and Dutch branches of
TenneT TenneT is a transmission system operator in the Netherlands and in a large part of Germany. ''TenneT B.V.'' is the national electricity transmission system operator of the Netherlands, headquartered in Arnhem. Controlled and owned by the Dutch ...
; thereafter a feasibility study will be produced.


Battery storage

Adjacent to Creyke Beck substation for the wind farm, near Cottingham, the Pillswood 196 MWh
battery storage power station A battery storage power station is a type of energy storage power station that uses a group of batteries to store electrical energy. Battery storage is the fastest responding dispatchable source of power on electric grids, and it is used to stab ...
was installed in 2022 using Tesla Megapack lithium-ion batteries, capable of producing 98 MW for 2 hours.