The Chacao Channel bridge, also known as Chiloé Bicentennial Bridge, is a bridge currently under construction to link the island of Chiloé with mainland
Chile Chile, officially the Republic of Chile, is a country in western South America. It is the southernmost country in the world and the closest to Antarctica, stretching along a narrow strip of land between the Andes, Andes Mountains and the Paci ...
crossing the
Chacao Channel The Chacao Channel () is located in Los Lagos Region, Chile and separates Chiloé Island from mainland Chile. The channel is about 40 km long and 4 km wide and connects the Pacific Ocean and Gulf of Ancud. The channel was created during the Quat ...
. It was one of the several projects that were planned to commemorate Chile's bicentennial in 2010. The construction of the bridge began in 2017. When completed as a
suspension bridge A suspension bridge is a type of bridge in which the deck (bridge), deck is hung below suspension wire rope, cables on vertical suspenders. The first modern examples of this type of bridge were built in the early 1800s. Simple suspension bridg ...
, it will be the largest such bridge in
South America South America is a continent entirely in the Western Hemisphere and mostly in the Southern Hemisphere, with a considerably smaller portion in the Northern Hemisphere. It can also be described as the southern Subregion#Americas, subregion o ...
. The opening of the bridge is planned for 2028.


History

Construction of the bridge was scheduled to start in the second half of 2007 and completion was due in late 2012 at an approximate cost of
US$ The United States dollar (Currency symbol, symbol: Dollar sign, $; ISO 4217, currency code: USD) is the official currency of the United States and International use of the U.S. dollar, several other countries. The Coinage Act of 1792 introdu ...
410 million. However, on 31 July 2006, the consortium in charge of the project revealed that the total cost of constructing the bridge was US$930 million, which was above the limit of US$607 million imposed by the government. In response, the ministry of Public Works decided not to continue with the project. To compensate the people of Chiloé for not building the bridge, then President
Michelle Bachelet Verónica Michelle Bachelet Jeria (; born 29 September 1951) is a Chilean politician who served as President of Chile from 2006 to 2010 and again from 2014 to 2018, becoming the first woman to hold the presidency. She was re-elected in December ...
promised an upgrade to the island's infrastructure. In June 2009, the Minister of Public Works announced it would revive the project. The bridge would be redesigned (it would no longer be a suspension bridge) and its total cost would be less than in the original design, due to the falling price of steel worldwide. The toll would be also cheaper than a ferry ticket. In May 2012, President
Sebastián Piñera Miguel Juan Sebastián Piñera Echenique (; 1 December 1949 – 6 February 2024) was a Chilean businessman and politician who served as President of Chile from 2010 to 2014 and again from 2018 to 2022. The son of a Christian Democratic Party (C ...
again revived the project, announcing it would open an international bidding process to present the best solution for the construction of the bridge, with a US$740 million investment limit.


Dimensions and features

The Chacao Channel bridge would replace the ferry that connects the village of Chacao, Ancud Comuna, on Route 5 (''Ruta 5 Sur'') at the northern end of Chiloé Island across the
Chacao Channel The Chacao Channel () is located in Los Lagos Region, Chile and separates Chiloé Island from mainland Chile. The channel is about 40 km long and 4 km wide and connects the Pacific Ocean and Gulf of Ancud. The channel was created during the Quat ...
with the village of Pargua, Calbuco Comuna, on the mainland. The original design for the bridge showed a total length of 2,635 m, consisting of three concrete towers (two 179.6 m high towers and one 160.77 m high south tower), two mainspans of 1,055 m and 1,100 m, and a suspended side span of 380 m, providing a minimum vertical clearance for navigation of 59 m. It was designed with two one-way lanes on each side. The bridge was designed for a lifespan of 100 years, resistant to winds over 240 km/h, and strong sea currents.


Design and construction

Design, financing, construction, operation and maintenance was originally awarded for thirty years to the Chiloé Bicentennial Bridge Consortium, consisting of French company Vinci Construction Grand Projets, German company
Hochtief Hochtief AG is a global provider of infrastructure technology and construction services, with locations in North America, Australia, and Europe. The Essen based company is primarily active in the fields of high tech, energy transition, and sustai ...
,
American Bridge Company The American Bridge Company is a heavy/civil construction firm that specializes in building and renovating bridges and other large, complex structures. Founded in 1900, the company is headquartered in Coraopolis, Pennsylvania, a suburb of Pittsb ...
and Chilean companies Besalco and Tecsa. Hochtief was the overall leader, Vinci provided the technical lead, and American Bridge was to contribute cable spinning and deck erection technology. In the revived 2012 process the contract was awarded to a consortium of the OAS, Hyundai,
SYSTRA SYSTRA is a multinational engineering and consulting group in the mobility sector, whose fields of activity include rail and public transport. SYSTRA employs about 10,300 people worldwide, and is a limited company which shareholders include Fr ...
, and Aas-Jakobsen with financial backing from Brazilian, French and Norwegian investors.


Criticism

Supporters expected that the bridge would boost tourism, increase investment and business opportunities on the island and provide better access to medical care. However, some inhabitants of Chiloé did not agree and they claimed that the bridge was harmful and even dangerous. This was due to claims that it would increase resource collection such as logging and increase pollution.


References


American Bridge Co.
December 23, 2004 (in Spanish) (Ed. note: The bridge depicted in this article is incorrect.)

July 15, 2005 (in Spanish)

January 14, 2006 (in Spanish) {{coord, 41.793, S, 73.522, W, display=title, source:dewiki Proposed bridges in South America Transport in Los Lagos Region Buildings and structures in Los Lagos Region Buildings and structures in Chiloé Archipelago Coasts of Los Lagos Region