The Agua Caliente Solar Project is a 290
megawatt
The watt (symbol: W) is the unit of Power (physics), power or radiant flux in the International System of Units (SI), equal to 1 joule per second or 1 kg⋅m2⋅s−3. It is used to quantification (science), quantify the rate of Work ...
(MW
AC)
photovoltaic power station, built in
Yuma County, Arizona
Yuma County is a County (United States), county in the southwestern corner of the U.S. state of Arizona, one of 15 List of counties in Arizona, counties in the state. As of the 2020 United States census, 2020 census, its population was 203,881. ...
using 5.2 million
cadmium telluride modules made by the U.S.
thin-film manufacturer
First Solar. It was the largest solar facility in the world when the project was commissioned in April 2014.
History
39
MW was online as of December 2011 and 100 MW was completed as of April 2012.
200 MW was completed as of July 2012,
and 247 MW in August 2012, when the 10th section was completed. The addition of more panels has halted until 2013, with crates of panels covered to protect them. Full power was achieved ahead of schedule in September 2013.
Project overview
In August 2011, the
Department of Energy finalized a $967 million
loan guarantee
A loan guarantee, in finance, is a promise by one party (the guarantor) to assume the debt obligation of a borrower if that borrower defaults. A guarantee can be limited or unlimited, making the guarantor liable for only a portion or all of the ...
for the project. The project sponsor,
NRG Solar, estimated the photovoltaic generation facility would fund approximately 400 construction jobs and 16 full-time operating jobs, and would become one of the largest plants of its kind in the world when completed. The power produced is being sold to
PG&E (Pacific Gas & Electric) in California in a 25-year Power Purchase Agreement.
The Series 3
thin film panels use
CdS/CdTe, and are rated from 77 watts to 82.5 watts each, and are mounted at a fixed tilt angle. 20,940 are connected in each array, rated at 1.26 MW
AC. 400 SMA 720CP
inverters were initially foreseen, but in the end 500 SMA 630CP are used.
[ Installed modules total power is 410 megawatt-peak (MWDC).
]
Award
In February 2012, Agua Caliente competed in the Excellence in Renewable Energy Awards and won the Project of the Year Award.[
]
Electricity production
Agua Caliente Solar Project's production is as follows, averaging 727 GW·h annual, yielding about 300 MW·h/acre.
The Loan Programs Office projected annual generation, calculated using the project's and NREL Technology specific capacity factors, was of 559 GW·h. Sector estimates predicted an average production of about 626 GW·h each year.
See also
* Arizona Solar Center
* Solar power in Arizona
References
External links
Project Datasheet
{{Solar power in the United States
Energy infrastructure completed in 2014
Solar power stations in Arizona
2014 establishments in Arizona
Photovoltaic power stations in the United States
NRG Energy