HOME
*



picture info

High Speed 1
High Speed 1 (HS1), legally the Channel Tunnel Rail Link (CTRL), is a high-speed railway linking London with the Channel Tunnel. It is part of a line carrying international passenger traffic between the United Kingdom and mainland Europe; it also carries domestic passenger traffic to and from stations in Kent and east London, and continental European loading gauge freight traffic. From the Channel Tunnel, the line crosses the River Medway, and tunnels under the River Thames, terminating at London St Pancras International station on the north side of central London. It cost £5.8 billion to build and opened on 14 November 2007. Trains run at speeds of up to on HS1. Intermediate stations are at in London, Ebbsfleet International in northern Kent and Ashford International in southern Kent. International passenger services are provided by Eurostar International, with journey times from London St Pancras International to Paris Gare du Nord in 2hours 15minutes, and ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  




Medway Viaducts
The Medway Viaducts are three bridges or viaducts that cross the River Medway between Cuxton and Borstal, Rochester, Borstal in north Kent, England. The two road bridges carry the M2 motorway (Great Britain), M2 motorway carriageways. The other viaduct carries the High Speed 1 railway line. All three bridges pass over the Medway Valley Line (to Paddock Wood railway station, Paddock Wood). The first Medway Viaduct, built to carry the M2 motorway, opened on 29 May 1963. It remained the only overcrossing of the river on this site until the 2000s, at which point two further bridges were constructed. The second Medway Viaduct was part of the M2 widening scheme, its opening in 2003 enabled the first bridge to be reconfigured to carry coast-bound road traffic only, while the new structure carried the London-bound traffic instead. Other remedial works to the older first bridge were also carried out around this time, including the replacement of its original concrete central span with a ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

British Rail Class 374
The British Rail Class 374, also referred to as the Eurostar e320, is a type of electric multiple unit passenger train used on Eurostar services through the Channel Tunnel to serve destinations beyond the core routes to Paris and Brussels. They began to run passenger services in November 2015. The trains, owned by Eurostar International Limited, are sixteen-coach versions of the Siemens Velaro. Each train is long. The trains are compliant with the Technical Specifications for Interoperability (TSI). Eurostar International's older fleet of Class 373 "Eurostar e300" trains, introduced in 1994 when the Channel Tunnel opened, could not be used on the 15 kV AC overhead line (OHLE) electrification system used in Germany, and most of the older trains could not be used on the 1.5 kV DC overhead line (OHLE) electrification system used in the Netherlands, and the trains did not have sufficient space onboard to install ERTMS signalling. This meant that Eurostar could not run its Cla ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


Train Protection & Warning System
The Train Protection & Warning System (TPWS) is a train protection system used throughout the British passenger main-line railway network, and in Victoria, Australia. The British Rail Safety and Standards Board's definition is: The purpose of TPWS is to stop a train by automatically initiating a brake demand, where TPWS track equipment is fitted, if the train has: *passed a signal at danger without authority *approached a signal at danger too fast *approached a reduction in permissible speed too fast *approached buffer stops too fast. TPWS is not designed to prevent SPADs but to mitigate the consequences of a SPAD, by preventing a train that has had a SPAD from reaching a conflict point after the signal. A standard installation consists of an on-track transmitter adjacent to a signal, activated when the signal is at danger. A train that passes the signal will have its emergency brake activated. If the train is travelling at speed, this may be too late to stop it before the poin ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Automatic Warning System
The Automatic Warning System (AWS) was introduced in the 1950s in the United Kingdom to provide a train driver with an audible warning and visual reminder that they were approaching a distant signal at caution. Its operation was later extended to give warnings for; * A colour light signal displaying a double yellow (steady or flashing), single yellow or red aspect * A reduction in permissible speed * A temporary or emergency speed restriction * An automatic barrier crossing locally monitored (ABCL), an automatic open crossing locally monitored (AOCL), or an open crossing (OC). AWS was based on a 1930 system developed by Alfred Ernest Hudd and marketed as the "Strowger-Hudd" system. An earlier contact system, installed on the Great Western Railway since 1906 and known as automatic train control (ATC), was gradually supplanted by AWS within the Western Region of British Railways. Principles of operation Information is conveyed by magnetic fields to the moving train thr ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Contrôle De Vitesse Par Balises
(''Speed control by beacons''), abbreviated to KVB is a train protection system used in France and in London St. Pancras International station. It checks and controls the speed of moving trains. KVB consists of: *The on-board installation, known as (aboard), which comprises: **An on-board computer (UEVAL) containing a processor, a communication unit and recording equipment **A visual interface for the use of the driver, which ***permits data entry regarding the train's speed, length and category. ***displays information about the state of the system. It does not replicate trackside signals for the driver (for example, the speed limits are not indicated). This is because the KVB is a train protection system, not a cab-signalling system. **An antenna, placed under the locomotive, to receive information sent by the ground installations. *The ground-based or (ground) installations, made up of: **Beacons or balises - digital or analogue transponders placed between the two track ra ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Transmission Voie-Machine
Transmission Voie-Machine (TVM, English: track-to-train transmission) is a form of in-cab signalling originally deployed in France and is mainly used on high-speed railway lines. TVM-300 was the first version, followed by TVM-430. TVM-300 was developed in the 1970s as part of the TGV project. At speeds faster than 220 kilometres per hour, TGV trains only run along dedicated tracks designated as (LGV). When travelling at high speed, it is not possible for the driver to accurately see colour-light railway signals at the side of the track. Signalling information is instead transmitted to the train and displayed on the train driver's dashboard. The driver is shown the safe operating speed, measured in kilometres per hour. The 1980s-developed TVM-430 system provides more information than traditional signalling systems would allow, including track gradient profiles and information about the state of signalling blocks further ahead. This high degree of automation does not remove th ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


Railway Gazette International
''Railway Gazette International'' is a monthly business magazine and news website covering the railway, metro, light rail and tram industries worldwide. Available by annual subscription, the magazine is read in over 140 countries by transport professionals and decision makers, railway managers, engineers, consultants and suppliers to the rail industry. A mix of technical, commercial and geographical feature articles, plus the regular monthly news pages, cover developments in all aspects of the rail industry, including infrastructure, operations, rolling stock and signalling. History ''Railway Gazette International'' traces its history to May 1835 as ''The Railway Magazine'', when it was founded by Effingham Wilson. The ''Railway Gazette'' title dates from July 1905, created to cover railway commercial and financial affairs. In April 1914 it merged with ''The Railway Times'', which incorporated '' Herapath's Railway Journal'', and in February 1935 it absorbed the ''Railway Eng ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

University Of Southampton
, mottoeng = The Heights Yield to Endeavour , type = Public research university , established = 1862 – Hartley Institution1902 – Hartley University College1913 – Southampton University College1952 – gained university status by royal charter , chancellor = Ruby Wax , vice_chancellor = Mark E. Smith , head_label = Visitor , head = Penny Mordaunt , location = Southampton, Hampshire, England , campus = City Campus , academic_staff = 2,715 (2020) , administrative_staff = 5,001 , students = () , undergrad = () , postgrad = () , colours = Navy blue, light sea green and dark red , endowment = £14.9 million , budget = £578.4 million , affiliations = ACU EUA Port-City University LeagueRussell Group SES SETsquared AACSB ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Overhead Lines
An overhead line or overhead wire is an electrical cable that is used to transmit electrical energy to electric locomotives, trolleybuses or trams. It is known variously as: * Overhead catenary * Overhead contact system (OCS) * Overhead equipment (OHE) * Overhead line equipment (OLE or OHLE) * Overhead lines (OHL) * Overhead wiring (OHW) * Traction wire * Trolley wire This article follows the International Union of Railways in using the generic term ''overhead line''. An overhead line consists of one or more wires (or rails, particularly in tunnels) situated over rail tracks, raised to a high electrical potential by connection to feeder stations at regular intervals. The feeder stations are usually fed from a high-voltage electrical grid. Overview Electric trains that collect their current from overhead lines use a device such as a pantograph, bow collector or trolley pole. It presses against the underside of the lowest overhead wire, the contact wire. Current collector ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Loading Gauge
A loading gauge is a diagram or physical structure that defines the maximum height and width dimensions in railway vehicles and their loads. Their purpose is to ensure that rail vehicles can pass safely through tunnels and under bridges, and keep clear of platforms, trackside buildings and structures. Classification systems vary between different countries, and gauges may vary across a network, even if the track gauge is uniform. The term loading gauge can also be applied to the maximum size of road vehicles in relation to tunnels, overpasses and bridges, and doors into automobile repair shops, bus garages, filling stations, residential garages, multi-storey car parks and warehouses. A related but separate gauge is the structure gauge, which sets limits to the extent that bridges, tunnels and other infrastructure can encroach on rail vehicles. The difference between these two gauges is called the clearance. The specified amount of clearance makes allowance for wobbling o ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Double Track
A double-track railway usually involves running one track in each direction, compared to a single-track railway where trains in both directions share the same track. Overview In the earliest days of railways in the United Kingdom, most lines were built as double-track because of the difficulty of co-ordinating operations before the invention of the telegraph. The lines also tended to be busy enough to be beyond the capacity of a single track. In the early days the Board of Trade did not consider any single-track railway line to be complete. In the earliest days of railways in the United States most lines were built as single-track for reasons of cost, and very inefficient timetable working systems were used to prevent head-on collisions on single lines. This improved with the development of the telegraph and the train order system. Operation Handedness In any given country, rail traffic generally runs to one side of a double-track line, not always the same side ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


Eurotunnel Class 0001
The Eurotunnel Class 0001 Bo-Bo diesel-electric locomotives were built by Maschinenbau Kiel (manufacturers designation DE 1004) between 1991 and 1992. They are very similar to the NS 6400 Class. When operating in the United Kingdom, the locomotives are assigned a TOPS classification as Class 21. History and design Five locomotives were built, numbered 0001–0005. They carry a yellow and grey livery and are used by Getlink for rescuing trains in the Channel Tunnel, and for propelling service trains in the channel tunnel. They are cleared to travel to Calais, Ashford, or St. Pancras; since 2007 they have been authorised to rescue trains on High Speed 1 in the event of a power failure. They have also been used to haul the SNCF TGV Iris 320 test train through the Channel Tunnel. In 2007 the locomotives were fitted with diesel particulate filters for the exhaust gases, which replaced the exhaust scrubber wagons that were previously coupled to the engines. Following a series of ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]